Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]
Tender For packing materials on rate contract basis for the period of one year - group vi (a)- adhesive tape, cello gum tape " (each 60 mtr) panfix (pack of 12), cello gum tape 2 thickness-40 microns (each 60 mtr), brown gum tape 3 thickness-40 microns (each 60 mtr), brown gum tape 2 thickness-40 microns (each 60 mtr), transparent masking tape 2", transparent tape 3", white virgin baniyan cloth waste minimum width 20 cm x 20 cm, baniyan cloth waste colour for all machine, cotton waste white (without any dust and foriegn particles) specification: should be white in colour without any foreign particles should be of cotton waste threads, group vi (b)- despatch materials, bengal twine 6 ply, white high density polyurethane sheet with one side lamination size width 40" inch in roll 1.tape width (in mm) - 2.5 mm 2. mesh size - 10 x 10 3. denier - 700 to 800 4. lamination - laminated with 40 microns ldpe 5. weight of hdpe sheet with one side lamination - 75 gm (+ 2%) per square metre, plastic rope (binding ), plastic rope (hd ), corrugated box 12 x 9 x 8 (inner size) ii) ply : 5 ply iii) paper : kraft paper 120 gsm iv) flute type : narrow (150 to 185 corrugation per meter) height of corrugation : 2.1 to 2.9 mm v) bursting strength : 7 (+ 1) vi) stapling : single stapling staple width " the staples should be 2.50" apart, corrugated box 25.5 x 12 x 9 (inner size) ii) ply : 7 ply iii) paper : kraft paper 120 gsm iv) flute type : narrow (150 to 185 corrugation per meter) height of corrugation : 2.1 to 2.9 mm v) bursting strength : 9 (+ 1) vi) stapling : single stapling staple width " the staples should be 2.50" apart, corrugated box 19 x 12 x 6 (inner size) ii) ply : 5 ply iii) paper : kraft paper 120 gsm iv) flute type : narrow (150 to 185 corrugation per meter) height of corrugation : 2.1 to 2.9 mm v) bursting strength : 7 (+ 1) vi) stapling : single stapling staple width " the staples should be 2.50" apart, polythene covers with machine sealing 19 x22 thickness in microns ldpe, perforation strip (16 tpi), box strapping roll (heat set-virgin quality)width-12mm,thickness-0.7mm
Tender For supply of 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs todrg. no. 66704005, col.i, alt. "b" = 2 nos . 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air springs to drg no. 66704011, col.i, alt. "b" = 2 nos. red oxide zinc chromate primer only to be coated to specification is:2074 of thickness 15-20 microns. specialcondition : material specn.no. en10025-5, 2004, s355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) shall be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fastened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the threaded portions shall be adequately protected with suitable protective covers to avoid damage during handling, storage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent damage, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs todrg. no. 66704005, col.i, alt. "b" = 2 nos . 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air springs to drg no. 66704011, col.i, alt. "b" = 2 nos. red oxide zinc chromate primer only to be coated to specification is:2074 of thickness 15-20 microns. specialcondition : material specn.no. en10025-5, 2004, s355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) shall be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fastened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the threaded portions shall be adequately protected with suitable protective covers to avoid damage during handling, storage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent damage, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66704005, col.i, alt. "a" = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air springs to drg no. 66704011, col.i, alt. "a" = 2 nos. red oxide zinc chromate primer only to be coated to specification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items areto be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh- 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) shall be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fastened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shallbe clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the threaded portions shall be adequately protected with suitable protective covers to avoid damage during handling, storage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent damage, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall becompletely drained before packing to prevent corrossion and contamination during storage and transit. [ warrantyperiod: 72 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply and installation and commissioning of different machineries and tools of dihipara beekeeping cluster, dihipara, murshidabad under wbkvib during the year 2026 27 2nd call - supply and installation and commissioning of raw honey storage tank specification:fabricated from 304 grade 3 mm thick stainless-steel sheet, all joins argon welded and polished. one number manhole is provided on top. both top and bottom is dished type.capacity 1200 kg, supply and installation and commissioning of honeyprocessingplant 1. ms control panel - 012. ss channel and angel structure - 013. pre heating tank in coil shape - 014. microfine replaceable cartridge filter press with gear pump - 015. processing tank with 1 nb coil - 016. falling film evaporator with ms stand - 017. wate ring vaccum pump 3 hp + water pump - 028. cooling tank with 1 nb pipe coil - 019. settling tank - 0210. set of ss pipes for honey piping - 0111. set of gi pipes with specials for water pump fitting -01specification:1. one no stainless steel prefilter tank having thickness of 1.6mm with volumetric, capacity of 500 kg along with 500 micron mesh.2. gear pump: made by m/s. rotodel company with full stainless steel body and gears. basic output capacity: 2000 its/hour. it will be suitably reduced to give required output.3. drive motor: 1.00 h.p. 3 phase 440 vol tefc 1440 rpm make crompton or siemens.4. pre-heating tank: made from 2.0 mm thick stainless steel sheet with heater.5. microfine filter: full stainless steel self locking high pressure filter which has poly propylene filters made of 40 micron size,6. processing tank: made from 2.0mm thick stainless steel sheet. one set of coil will be provided for processing tank.7. crompton make water circulation pump 0.50 hp, mono block, with 18 m head, 230 volt ac single phase mechanical seal.8. falling film evaporator: made from 3.0 mm thick stainless steel sheet, with concentric cone in side. subjected to vacuum and ensuring falling film, to evaporate moisture.9. cooling tank: made from 1.5 mm thick stainless steel sheet, exactly same as pre-heating tank but without heaters.10. settling tank: made from 2.0 mm thick stainless steel sheet, top and bottom dished ends fully leak proof, bottom drain for honey withdrawal.11. control panel: having cut off mcb, control circuit fuses, and mcb in each time to protect the wiring, with brass earthing bolt to prevent electric shocks.12. water ring vacuum pump: 1.0 hp, 3000 rpm, 440 volts ac, tefc. kirloskar make with 750+mm 4g vacuum.13. ms chasis made out of 75x40 ms channel in two parts., supply and installation and commissioning of semi automatic volumetric honey filling machine, twin head, stroke typespecification:this is specially designed to fill squash/juice in bottles. all contact parts are made from 304 type stainless steel materials, supported on mild steel angle structure, covered with stainless steel sheet. the machine is suitably arranged to upper and lowering of filling head with nozzle so that there is no spillage of squash or juice while filling. this helps to fill in accurate measure.no bottle no filling system.operated by 1 hp motor with gear box.filling capacity: 100ml to 500 ml.filling speed: 14/16 bottles per minute., 500 ml to 1000 ml, supply and installation and commissioning of twist off lug cap sealing machine:specification:for 100% leak proof airtight sealingno hand pulling system.this machine is ideal way to hermetically seal bottles products with twist off/vacuseallug caps to preserve taste and flavour.semi-auto-manual and pneumatic working.capacity: 600 bottles/hr of 53 to 63 mm caps. (for 200 and 400 gm. pickle)supply is complete with air compressor., supply and installation and commissioning of weight scale digital display specification:capacity: 100 kgreadability: 10 gm, supply and installation and commissioning of digital refractometer, supply and installation and commissioning of shrink tunnel specification:seals pp/pvc shrink film.separate controls for h