Web Analytics Made Easy - StatCounter

Horizontal Lever Tenders

Get complete information related to latest Horizontal Lever Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Horizontal Lever Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Horizontal Lever Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41147673 Due date: 05 Aug, 202505 Aug, 2025 50.0 Thousand
Tender For corrigendum : supply of spare part of b vehicle - element air cleaner , spark plug , cap fuel tank , hose inlet joint , pipe metallic , rail assy out side , rail assy inside

Central Government/Public Sector

CTN :41309431 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of horizontal lever, rdso drg no-wd-10061-s-02, alt-03, item no-01. [ warranty period: 30 months after the date of delivery ]

corporations/Associations/Others

CTN :40975088 Due date: 07 Aug, 202507 Aug, 2025 NA
Tender For corrigendum : custom bid for services-replacement of equipment spares at cp 11c for fy 2025-26: 1 101/ 103 apron feeder: roller bearing / plumber block replacement for all shafts. set 6, 2 101/ 103 apron feeder: pinion/gear replacement set 6, 3 101 / 103 apron feeder: apron pan replacement. nos. 50, 4 101/103 apron feeder, set pin/link pin replacement nos. 30, 5 103b apron feeder: link chain replacement set 4, 6 101/103a apron feeder: track link replacement set 2 7 103 apron feeder: feed roller/return roller replacement nos. 80, 8 101 apron feeder: feed roller/return roller replacement nos. 20, 9 101/103 apron feeder: main/tail/intermediate shaft replacement set 2, 10 101/103 apron feeder: apron sprocket/ tail guide wheel/ drive & driven sprocket replacement set 5, 11 101/103 apron feeder: return side base structure beam replacement nos. 14, 12 102 primary crusher: top shell concave replacement. set 2, 13 102 primary crusher: mantle liner replacement. set 3, 14 102 primary crusher : preparation of eccentric assembly. set 1, 15 102 primary crusher: replacement of eccentric gear. set 1, 16 108 secondary crusher: top shell concave replacement. set 3, 17 108 secondary crusher: mantle liner replacement. set 3, 18 107 scalping screen: screen overhauling set 4, 19 107 scalping screen: screen bearing replacement set 4, 20 all conveyor: pulley replacement set 6, 21 all conveyor: conveyor belt replacement & joint assistance joints 6, 22 all conveyor: conveyor belt re-joint assistance joints 8, 23 all conveyor: pulley lagging assistance set 12, 24 120 tripper rail: rail replacement & alignment set 1, 25 120 tripper: tripper wheel replacement set 6, 26 miscellaneous work for spare replacement mt 25.

Central Government/Public Sector

CTN :41281034 Due date: 19 Aug, 202519 Aug, 2025 NA
Tender For supply of a set of 2 items for boxnhl bmbs wagon handbrake arrangement a) tie rod for boxnhl bmbs wagon drg. no. wd-09034-s-10 item no. 19, alt-11,- 01 no/set. b)horizontal lever rdso drg. no.-wd-09034-s-10,item no.-18, alt.-11,- 01 no/set. specn. no.: is 2062-2011 (ra 2021)amd-1of nov.20 12 gr.e 250a [ warranty period: 30 months after the date of delivery ]

CTN :41245368 Due date: 05 Aug, 202505 Aug, 2025 NA
Tender For supply of pull rod for horizontal lever for bobyn as per rdso drg. no. wd-96021-s-8, alt 3 or latest, item no.4 mat and spec as per drawing.

Central Government/Public Sector

CTN :41238245 Due date: 22 Aug, 202522 Aug, 2025 NA
Tender For supply of horizontal lever support small as per drawing no. contr-9405-s/11, alt-9 or lat est, item no. 6 [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :41238247 Due date: 22 Aug, 202522 Aug, 2025 NA
Tender For supply of horizontal lever support small as per drawing no. wd-88088-s-19, item no.11, al t-8 or latest. [ warranty period: 30 months after the date of delivery ]

CTN :41238435 Due date: 21 Aug, 202521 Aug, 2025 NA
Tender For supply of zitms - design, manufacture, supply of integrated track monitoring system f rom zerospeed having: track parameters recording system, full rail profile and wear measurement system, system formeasurement of acceleration on one pivot of trc & test vehicle/locomotive and on both side axle boxes of oneaxle of trc, system for identification of any obstacle in maximum mov ing dimension (mmd) envelope of ir,system for rear window video recording of ir track ,system for video recording of track components andanalysis by image processing for status of track component s, as per specification no. tm/im/448 (revision-1,2023) along with consumables, technical support an d spare parts during warranty period and including agencycommission. note 1 - the consumables inc luded in this item are the consumables required for maintenance ofthe system [warranty period:24 months after the date of delivery ]

CTN :40411719 Due date: 21 Aug, 202521 Aug, 2025 NA
Tender For supply of zitms - design, manufacture, supply of integrated track monitoring system f rom zerospeed having: track parameters recording system, full rail profile and wear measurement system, system formeasurement of acceleration on one pivot of trc & test vehicle/locomotive and on both side axle boxes of oneaxle of trc, system for identification of any obstacle in maximum mov ing dimension (mmd) envelope of ir,system for rear window video recording of ir track ,system for video recording of track components andanalysis by image processing for status of track component s, as per specification no. tm/im/448 (revision-1,2023) along with consumables, technical support an d spare parts during warranty period and including agencycommission. note 1 - the consumables inc luded in this item are the consumables required for maintenance ofthe system [warranty period:24 months after the date of delivery ]

Central Government And Public Sector

CTN :41224406 Due date: 28 Jul, 202528 Jul, 2025 NA
Tender For supply of pin for horizontal lever to irs drg. no: w/pn-88 alt.1 matl & spec : . as per d rawing. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up