Get complete information related to latest Hot Air Dryer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hot Air Dryer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hot Air Dryer Tenders.
Tender For work of repairing and internal cleaning of esp inlet & outlet flue gas ducts; repairing fd fan discharge ducts, air heater, and eco. ash hopper patching in u # 3 during coh at cstps
Tender For supply of esp heaters, insulators and associated spares for coh of unit #3 at em_i,210 mw cstps chandrapur- heating elements for hopper 415 v 500 w, support insulator heater 415 v, 1 kw, shaft shaft insulator heater 415 v, 1 kw, bhel 500 mw suport insulator cstps u#5/6, spare insultr for field discnctg/es assy, esp 90kv seal off bushing, bhel 500 mw shaft insulator cstps u#5/6
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For supply of points for first year , calibration of glueing m c 8930 by 3 sensor 3 cal points for first year , calibration of vul kettle 8760 by 3 sensor 3 cal points for first year , calibration of hot swaging m c plant no 6229 by 1 sensor 3 cal points for first year , calibration of salt peter n 5 by 3 sensor 3 cal points for first year , calibration of temp gauge by 1 sensor 3 cal points for first year , calibration of gas nitric 35 by 1 sensor 3 cal points for first year , calibration of air circulation by 3 sensor 3 cal pointsfor first year , calibration of high frequency 41 by 1 sensor 3 cal points for first year , calibration of digital graph recorder 1 16 ch without sensor by simulatrion 3 cal points for first year , calibration of hot swill n2 by 1 sensor 3 cal points for first year , calibration of anodising e6 by 1 sensor 1 cal points for first year , calibration of auto film proce 6768 by 1 sensor 3 cal points for first year , calibration of hotair blower 70 by 3 sensor 3 cal points for first year , calibration of hot water anodizing 20 by 1 sensor 3 cal points for first year , calibration of temp control of hot water 02 by 1 sensor 3 cal points for first year , calibration of digital temp. gauge with rtd sensor by 1 sensor 3 cal points for first year , calibration of tvc trolly by 3 sensor 3 cal points for first year , calibration of industrial freezer by 1 sensor 3 cal points for first year , calibration of industrial freezer 2019-14 by 1 sensor 3 cal points for first year , calibration of thermo lab 3c36 and 2c temp and rh measurement by 1 sensor 3 cal points for first year , calibration of oscilation disc rpm measurment for first year , calibration of grese drop point tester 538 1110 by 1 sensor 3 cal points for first year , calibration of quv by 1 sensor 3 cal points for first year , calibration of hotairdryer d1 and d2 by 1 sensor 3 cal points for first year , calibration of hot water cleaning station by 1 sensor 3 cal points for first year , calibration of temp clock for first year , calibration of ir gun up to 500 dec c for first year , calibration of furnace range upto 500 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 500 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 1 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 3 sensor 3 cal points for second year , calibration of furnace range upto 1250 deg c by 6 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 1 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 3 sensor 3 cal points for second year , calibration of bath range upto 400 deg c by 6 sensor 3 cal points for second year , calibration of thermometer range upto 100 deg c 3 cal points for second year , calibration of tank range by 1 sensor 3 cal points for second year , calibration of tank range by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 1 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 3 sensor 3 cal points for second year , calibration of oven range upto 350 deg c by 6 sensor 3 cal points for second year , calibration of themohygrometer 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 1 sensor 3 cal points for second year , calibration of hydraulic press range upto 180 deg c by 3 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 1 sensor 3 cal points for second year , calibration of chambers furnace range upto 200 deg c by 3 sensor 3 cal points for second year , calibration of //bid details 2 / 81 chambers furnace range upto 200 deg c by 6 sensor 3 cal points for second year , calibration of auto film proce 6760 by 1 sensor 3 cal points for second year , calibration of extrasion mc 6580 by 1 sensor 3 cal points for second year , calibration of spot vulcanising
Tender For bid to ras supply of rate contract for fabrication and installation of smart agricultural machines -pusa electronic safety alarming device for chaff cutter , pusa tele robotic pesticide applicator for greenhouse , pusa tele robotic control system for tractor , pusa area meter , pusa battery mini electric prime mover , pusa electronic seed metering retrofit module kit for cultivators 9 plus 1 units , pusa hotairdryer coupled with biomass fired steam heater , pusa drum type vegetable washer , pusa portable hybrid dryer with biomass fired steam heater , pusa battery operated variable height platform
Tender For tender for supply of hopper heater plate of esp fly ash hopper -thermopad make hopper heater 305x152 , dimension 610x305 mm makethermopad make hopper heater , thermopad make hopper heater 660x305 , thermopad make hopper heater 762x152 , thermopad make hopper heater 762x305
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f