Web Analytics Made Easy - StatCounter

Hume Pipe Culvert Repair Tenders

Get complete information related to latest Hume Pipe Culvert Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hume Pipe Culvert Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hume Pipe Culvert Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45499744 Due date: 24 Jun, 202624 Jun, 2026 27.12 Lacs
Tender For providing developmental works in torragudipadu g.p of chimakurthy mandal package 5 works - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , construction of sub grade with quarry waste(table 400.13) by mix in place method normal construction of granular sub base by providing quarry waste material spreading in uniform layers with motor graded on prepared surfce mixing by mix in place method with rotavator at once and compacting with vibratory roller 80-100 kn r to achive the desired density complete as per clause 401.4 as per technical specification clause 408 mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. , clearing juliflora (prosafis) jungle including up-rooting and removing of juliflora stumps. etc complete. ssr from road & bridge works rates of materials & work items ..112(d) of current ssr (2025-26). mat-00482

CTN :45499755 Due date: 24 Jun, 202624 Jun, 2026 17.88 Lacs
Tender For providing developmental works in yerragudipadu (v) & g.p chimakurthy mandal package 2 (3 works) - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord. , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , construction of sub grade with quarry waste(table 400.13) by mix in place method normal construction of granular sub base by providing quarry waste material spreading in uniform layers with motor graded on prepared surfce mixing by mix in place method with rotavator at once and compacting with vibratory roller 80-100 kn r to achive the desired density complete as per clause 401.4 as per technical specification clause 408 mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. , clearing juliflora (prosafis) jungle including up-rooting and removing of juliflora stumps. etc complete. ssr from road & bridge works rates of materials & work items ..112(d) of current ssr (2025-26). mat-00482

CTN :45499760 Due date: 24 Jun, 202624 Jun, 2026 27.45 Lacs
Tender For providing developmental works in yelurivaripalem (v) of chimkaurthy mandal package (4 works) - shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders. , scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges.

CTN :45499768 Due date: 24 Jun, 202624 Jun, 2026 17.53 Lacs
Tender For providing developmental works in pulikonda (v) of chimkaurthy mandal package 1 (3 works) - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders.

CTN :45499769 Due date: 24 Jun, 202624 Jun, 2026 17.57 Lacs
Tender For providing developmental works in pulikonda (v) of chimkaurthy mandal package 2 (3 works.) - scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord, construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges., construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord, shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders., earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth

CTN :45499776 Due date: 24 Jun, 202624 Jun, 2026 20.60 Lacs
Tender For providing developmental works in rangasaipuram village gadiparthivaripalem gp of chimakurthy (m) package 1 (4 works) - construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth . scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord . shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders.

CTN :45499777 Due date: 24 Jun, 202624 Jun, 2026 13.75 Lacs
Tender For providing developmental works in rangasaipuram village gadiparthivaripalem gp of chimakurthy (m) package 2 (3 works) - shoulders are filling the selected earth for levelling the site as per drawing and technical specification clause 305.3.9 mord & 304 morth but excluding gst & seigniorage charges. for shoulders. , scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per technical specification clause 301.4. mord , earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 mord , construction of granular sub-base by providing well graded hbg material (grading iii material) (table 400.2) , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller 80-100 kn / vibratory roller to achieve the desired density, complete as per technical specification clause 402 mord including cost of all materials, labour, conveyance, hire charges of machinary, royalties, all taxes etc complete as per direction of engineer in charge.1 , including over head but excluding seignorage charges and gst desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges. desired density, complete as per technical specification clause 401 mord / morth. but excluding vat & seigniorage charges.

State Government

CTN :45480360 Due date: 15 Jun, 202615 Jun, 2026 2.89 Lacs
Tender For restoration of damages on fithu ka parua to harizan basti balu bhadrol road km 0/00 to 2/500 (sh: providing and laying wbm g-i, g-ii cement concrete pavement 900 mm dia hume pipe culvert at wing wall at rd 1/585 to 1/640)

State Government

CTN :45231232 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For corrigendum : supply and execution items for reliability improvement of signalling inst. section of sr. dste/1/lko of lucknow div. nr. - excavating and refilling of trench to the level of ground with rammed earth asper drg. no.(nr/s&t/con/1.1/97a) so as not to form a drain 0.3 mtrs wide & 1mtr deep on both side of the station along side the track. it shall confirm to the safe distance as per signalling and cable plan in all type of soil, it also includes clearence of roots of trees and bushes., excavating and refilling of trench 0.3 mtrs wide & 0.8 mtr deep on pitced/stone/bricks paved surface, road/crossing/platform etc. and restoration of surafce to original condition., laying of signalling/telecom/power cables of different sizes as per attached guidelines (drg. no.(nr/s&t/con/1.1/97a) or latest on signalling cable laying and as per cable route plan approved by railways through trenches, rcc pipe, dwc pipe, gi pipe etc and meggering of cable before and after its laying of all type of outdoor cables. contractor have to transport cable from any store of lko division to site carefully. meggering to be done for each drum separately. meggering sheets to be supplied and filled up by contractor and submitted to railways, as per instructions by consignee., supply and laying of 2nd class bricks in the trench and laying as per drg. no. (nr/s&t/con./1.1/97a) or latest and as per instruction of the site engineer., boring and trenchless cabling along with supply and insertion of hdpe/dwc self lubricated pipes as per rdso spec no. rdso/spn/204/2011 ver 1.1 or latest of 120mm nominal dia in the bore at the depth of 1.4 meter to 2.1 meter from formation level (level of earth below ballast) as per drawing and as directed by engineer incharge by trenchless technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. inspection-consignee for supply of dwc/hdpe pipe. the following required coupling arrangement should also be supplied: 1. suitable snap fit couplers withrubber o ring, 2. spacers, 3. tees. 4. bend. 5. end cap(1 no. =6mtr ,straigh tpipe). (a) the cost shall include horizontal boring through any intermediate obstruction, either natural or man made or any boundary etc. (b) the rate is inclusive of all the materials equipment and labour required for during trenchless horizontal boring under the railway track. nothing extra shall be admissible on any account than the rate quoted above. (c) the pipeis to be laid underrailway track/road /culvert. all necessary arrangement are to be provideand all precautions are to be end is not deviated from the horizontal level line by more than 250mm in horizontal and vertical direction. (d) the rate shall be inclusive of direction and protection of underground utilities encountered during boring. (e) the payment for boring shall be made only when dwc/hdpe pipe are laid in the bore., concreting unschduled items in concrete of 1:3:6 ratio in cement, coarse sand and aggregate 25mm at different places in the yard and plastering top in fine plaster of 1:4 cement sand ratio. it also includes the excavation of earth as required at site and as per instruction of site incharge. the volume in cubic metres shall include the volume occupied by any ci foundation, trestle, ms angle or flat or gi pipe required to be embedded in the casting. cement coarse sand and aggregate 25mm are to be supplied by the contractor., earth work for excavation and refilling around location boxes and signals etc. where necessary including 50m lead and 1.5m lift. the lead is to be measured from centre of gravity of location to the centre of filling and lift from main ground level. the earth work should be well rammed including breaking of clods, levelling and dressing etc. as per instruction of engineer at site., brick work with well burnt bricks in foundations and plinths with cement and sand (ordinary) mixture of 1:4 ratio. all material is to be supplied by th

Central Government/Public Sector

CTN :45449485 Due date: 06 Jul, 202606 Jul, 2026 5.76 Crore
Tender For supply of old 6600 v pilc cables with new xlpe cables c c - ht xlpe insulated armoured pvc sheathed cable , straight through cable jointing kit , indoor cable end termination , rcc pipe and fixing of collars , cable tray , trench in any type of asphalt road , trench in any type of concrete or stone road , trench for ht cable in soft soil , laying of ht xlpe cable in the trench , laying of ht xlpe in the culvert trench , making ht cable straight through jointing work , making ht cable indoor termination and connection , carrying out high potential test , carrying out phase sequence test , providing and laying approved quality rubble packing , providing and laying water bound macadam , providing and laying 240 mm thick sub base , providing and laying hot premixed asphaltic concrete , providing and laying hot premixed asphaltic macadam , providing and laying m10 grade ready mix cement concrete , providing and laying cement concrete , construct square brick masonary inspection chamber
 Loading, Please wait...

Connect us via What's Up