Get complete information related to latest Humidifier Tank Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Humidifier Tank Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Humidifier Tank Tenders.
Tender For purchase of equipments ( s.no 1 to s.no 08 ) for chemistry department - purchase of equipments, digital electronic balance /analytical balance load capacity: minimum 500 g readability: 0.01 g linearity: 0.02g display: lcd/led tare function: required top pan type power supply: 220 240 v ac, 50 hz , digital tds meter measuring range: 0 9990 ppm resolution: 1 ppm display: lcd automatic temperature compensation (atc): required waterproof: minimum ip67 protection power source: battery operated (button cell/aaa battery), digital ph meter benchtop model ph type microprocessor/microcontroller ph range: 0 14 resolution: 0.01 ph accuracy: 0.05 ph or better combined ph electrode with temperature sensor two or three-point calibration facility temperature compensation type automatic display: lcd power supply: 220 240 v ac, 50 hz warranty minimum 1 year, laboratory heating mantle (knitted glass yarn) capacity: 500ml temperature range: ambient to 350 c energy regulator/control knob: required power supply: 220-240 v ac, 50 hz, mortar with pestle material: porcelain size: 100 150 mm inner diameter exterior: glazed grinding surface: unglazed , hot plate top plate material: cast iron plate size: minimum 8 inch diameter power rating: 2000 w temperature range: ambient to 200 c minimum thermostatic temperature control: required power supply: 220 240 v ac, 50 hz, electric bunsen burner electrically operated energy regulator/ control knob operating temperature 800 c body: stainless steel power supply source: corded electric, supplied with a heavy-duty, heat-resistant, earth-grounded, 3-pin power cord (minimum length 1.2 meters). power consumption: between 350 and 500w power supply: 220-240 v ac, 50 hz , water distillation unit output capacity: 4 litres per hour (lph) ph value: 5.5 to 7.0 conductivity (raw water distillation):3.0 4.0 s/cm or less glassware material: borosilicate 3.3 glass (pyrex/duran equivalent) heating elements: silicaenclosed quartz heaters or chromium-plated element variants power supply: 220 240 v ac, 50 hz / 60 hz, single phase automatic water level cut-off
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of nizar and kukarmunda taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (pave
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, o kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including mecessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for took of of the roto of 3 elg/10cgmonducing bitume , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot / drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. , necessary firewoood, oil, lubricants, labour charges etc
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of ukai taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, a kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver , finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant. machineries and eginment , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of songadh taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene abour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including tolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oi ubricants, labour charges, using contractor's own drum mix olant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual _aying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oi ubricants labour charges using contractor's own drum mix , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing ag
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
Tender For purchase of lab items for basic engineering - digital balance load capacity: minimum 500 g readability: 0.01 g linearity: 0.02g display: lcd/led tare function: required top pan type power supply: 220 240 v ac, 50 hz , digital ph meter ph type microprocessor/microcontroller ph range: 0 14 resolution: 0.01 ph accuracy: 0.05 ph or better combined ph electrode with temperature sensor two or three-point calibration facility temperature compensation type automatic display: lcd power supply: 220 240 v ac, 50 hz warranty minimum 1 year , heating mandle capacity: 500ml temperature range: ambient to 350 c energy regulator/control knob: required , water distillation units output capacity: 4 litres per hour (lph) ph value: 5.5 to 7.0 conductivity (raw water distillation):3.0 4.0 s/cm or less glassware material: borosilicate 3.3 glass (pyrex/duran equivalent) heating elements: silica-enclosed quartz heaters or chromium-plated element variants power supply: 220 240 v ac, 50 hz / 60 hz, single phase automatic water level cut-off
Tender For providing and laying road materials and machinery for various road under surat (r&b) division-1, surat. asphalt patch work and miscellaneous work of i.r and c.r. for annual rates (asphalt work) - providing and laying 50 mm thick compacted b.m. in single layer with b.t. aggregate as per morth specification and bitumen grade 60 or 70 (vg-30) for tack coat at 2.5 kg. or 10sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at the rate 34.0kg or m.t. i.e. 3.4 percentage of total mix including heating the aggregate and asphalt by batch mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete for surat (r and b sub division no.2 surat), for sub division svr sub division, providing laying 20mm (compacted) thick mix seal surface premixed with bitumen grade 60 or 70 (vg-30) tack coat at 2.5 kg. or 10 sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at 5.09 percent by weight of total mix and filler, bitumen during preparing of hot mit material in drum mix plant with all taxes and delivery at hot mix plant site, labour charges and or tools required and asphalt by drum mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. completefor surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and laying 25 mm thick compacted s.d.b.c.with b.t. stone chips as per m.o.r.t.h. gradation and specification and bitumen grade 80 or 100 for mixing at the rate of 50 kg or m.t.by wt. of mix i.e.(5.0 percentage of total mix) (as per mix design) including the aggregate and asphalt by batch mix mix plant using including heating and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete.for surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and applying asphalt painting on b.t. surface with mechanical sprayer using bitumen 60 or 70 (vg-30) at the rate of 5.00 kg or 10 sq.mt. and spreading stone dust on painting surface at the rate of 0.03 cu.m. or 10 sq.mt. and rolling with smooth wheeled and pneumatic roller and brushing etc. complete. for surat (r and b sub division no.2 surat), for sub division svr subdivision