Tender For repair replacement and maintenance of external water rising supply line dozing plants submersible pump sets centrifugal pump sets starter panels and cleaning of sump oh tanks with connected items at mil stn dhrangadhra
Tender For supply of w90415302382: primary water pump (centrifugal 150m3/hr, 77m, var-02 as per specification-tg60729 , tg9741530030: spare kit for pw pump motor set
Tender For bid document of repairing work of submersible motor pump, mono block motor pump and submerged centrifugal pump for water supply department as per annual rate contract in bhuj municipality (2nd attempt)
Tender For providing and installation of 75 kw/100 hp centrifugal pump-motor set for searsole zone at searsole boosting station under rcfa part-ii water supply scheme
Tender For urban water supply scheme at amarpur/ s.h- repairing and maintenance of different capacity v.t pump motor and centrifugal pump motor of raw water and clear water in/c. lowering lifting of pump motor, fitting fixing of suction hose pipe, foot valve etc. at 0
Tender For repair and preventive maintenance of submersible and centrifugal pump sets at water supply scheme keshopura,bhankrota and bindayka under city sub division-ix, under the jurisdiction of city dn-ii (south), phed, jaipur.
Tender For repair and preventive maintenance of submersible and centrifugal pump sets at water supply scheme keshopura,bhankrota and bindayka under city sub division-ix, under the jurisdiction of city dn-ii (south), phed, jaipur.
Tender For design, drawing, construction, testing, commissioning of floating pontoon of size 5x3 mtr at jhumka dam, raw water electric sub station100 kva/11/0.415 kv with all required work,raw water hscf pump sets 2 no of 10hphaving discharge - 97656 lph and against 20.0m head at floating pontoon station site, 2.0 mld conventional type water treatment plant, clear water centrifugal pump set 03 nos of 30hp having discharge 93750 lph against 101m head, clear water electric sub station 100 kva/11/0.415kv with all required work at wtp site, 120 kl capacity 30m staging mbr-1 no at village salka,100 kl capacity 16m staging mbr-2 no at village salka, providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 pipe 250 mm dia- 200m and clear water pumping main 150 mm dia di k-9 pipe-3820 m,di k-9 pipe200mm dia-1210 m ,total length-5030 m& clear water gravity mains di k-7 pipe 300 mm dia l= 6128m.& o-pvc pipe pn-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. total length- 50749 m with all required valves &specials,as per attached key plan map, providing and fixing bulk flow meters, nala crossing and work include taking permission to pwd, wrd deptt. etc. allied all civil works including boundary wall around wtp campus. work completion is 12 months including rainy season integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (on risk and cost basis)group water supply scheme narkeliblock- baikunthpurdistrict –korea