Tender For corrigendum : supply of various consumables items for emd ii unit 3, 4 & 5, utps. (emd - 5 et-6261) - w963 play safe high voltage tape (50 mm x 0.76 mm x 9.1 mtr) roll, 901 easyclean (nf) 500 ml. spray can - on line electrical contact cleaner., kli - nit ct-2 self spraying type in 350ml can packing, grease gun, wd 40 size 340 gms spray bottle manu hardcastle & waud mfg . co . ltd, crimper plier,self adjustable crimping tools used for 0.25-6.00 sqmm cable end sleeves, led torch, rechargeble torch, puf seal self expanding foam for sealing, measure tape 30 meter, pebble ral 7032 color spray bottle for electrical ht / lt panel, impact wrench power/battery operated, platform truck.size:-60 length x 35 width, allen key set black finish of mm series having sizes 1.5mm ,2mm,2.5 mm ,3mm ,4mm ,5mm ,6mm , 8mm , & 10mm allen keys, hand drill machine size 13mm, feeler gauge: 0.05 - 1 mm, length - 150. size: 0.05 - 1mm step of 0.05mm, 20 leaves, filler gauge set of 26 blades, skf make induction heater model no. tih 100m / 230v for bearing fitting work., hydraulic bearing puller kit, make- skf, model no- tmma 75h/set, width of grip external 52-200 mm, effective arm length - 200 mm, withdrawal force- 75 kn, high speed portable blower,550 w (min.),cap-3.8 m3/minute,16000 rpm,1.7 kg., bosch make hot air gun model ghg 630 dce power input: 2000 watts, temprature range: 50-630 degree c, air flow rate: 150/300/5001/min, weight: 0.73kgs, hss drill bit set 3 mm to 12 mm, high abrasion (12000 abrasion cycles) with cut & mechanical hazard safety hand gloves made from 100 micro foam nitrile coated over breathable hppe thinnest cut resistance shell
Tender For e-quotation for seeking firm rates for non-schedule items for preparing estimates. - supplying , installation, testing and commissioning of vertical turbine pump set with ss impeller capable to discharge 126 m3/hr.against total head of 50 m, (make kirloskar/jyoti/wilo-mather&platt/wpil) coupled with suitable capacity vertical hollow shaft/solid shaft squirrel cage induction motor , rating of motor 20% more bhp than that of pump (make kirloskar /abb /cgl/ siemens) operated on 415 +/- 10% volt, 3 phase , 50 c/s a.c supply , ie3 type as per is:325 and iec:63400-ihaving speed 1450 rpm,with heavy duty m.s. column assembly with ss line shaft and each coloumn of 5 feet length including cost of supplying , fitting and fixing of all required accessories such as cidf sluice valve-1 set, cidf nr valve-1 set, pressure gauge-1 no, strainer-1 no, m.s. channel base plate etc. all complete including cost of taken out existing old pumpset., supplying and installation of fasd starter suitable for above mentioned vt pumpset make lk/bch/schneider., supplying and laying of 25 mm2 , 1.1 kv, 3 core pvc insulated unarmoured copper cable make polycab/kei/gloster, from starter to motor., supplying, installation testing and commissioning of horizontal split casing centrifugal pump set with bronze impeller having discharge 126 m3/hr. against total head of 35 m, (make - kirloskar/jyoti/wilo-mather&platt/wpil), coupled with suitable capacity squirrel cage induction motor, rating of motor 20% more bhp than that of pump(make kirloskar /abb /cgl/ siemens) ,tefc, ie3 type as per is:325 and iec:63400-ihaving speed 1450 rpm,operated on 415 +/- 10% volt, 3 phase , 50 c/s a.c supply, mounted on a commonm.s. base plate including cost of supplying , fitting and fixing of all required accessories such as cidf sluice valve-1 set, cidf nr valve-1 set, pressure gauge-1 no, foot valve-1no, etc. all complete including cost of taken out existing old pumpset., supplying and installation of fasd starter suitable for above mentioned c/f pumpset make lk/bch/schneider., supplying and laying of 16 mm2 , 1.1 kv, 3 core pvc insulated unarmoured copper cable make polycab/kei/gloster, from starter to motor., cost towards complete repairing of control panel at intake well with changing of damaged parts such as :-1.150 amp tpn mccb,50 ka -1 no. as incoming feeder.2. 75 amp tp mccb, 50 ka-2no as outgoing feeder.3.star delta timer-2nos(one for each starter) 4. 32 amp switch fuse unit -01 no. for internal and external light load.5. (0-500 v) volt meter-01 no., ampere meter-01 no.,three phase indicator lamp,powder coating paint,push button on/off,on/off/trip indicator lamp,wiring,etc as per required and testing on full load ., cost towards providing all labour, tools and technicians for taken out and dismantling 40 hp vt p/set with bowl assembly, 6" dia. coloumn pipe and line shaft etc all complete., cost towards dismantling and repairing of complete bowl assembly., cost towards making supplying and fitting s.s. top shaft as per size and sample., cost towards making supplying and fitting of c.i. spider bearing having od 6.5" with rubber bush as per size and sample., cost towards lowering of vt p/set. after complete repairing and assembling works., cost towards complete repairing of control panel at clear water pump house with changing of damaged parts such as :-1.125 amp tpn mccb,50 ka -1 no. as incoming feeder.2. 63 amp tp mccb, 50 ka-2no as outgoing feeder.3.star delta timer-2nos(one for each starter) 4. 32 amp switch fuse unit -01 no. for internal and external light load.5. (0-500 v) volt meter-01 no., ampere meter-01 no.,three phase indicator lamp,powder coating paint,push button on/off,on/off/trip indicator lamp,wiring,etc as per required and testing on full load .
Tender For supply and fitting, fixing of new spindle, gm nut and other allied components of 700 mm dia. delivery sluice valve of pump no.-3 at rwps ph-i of grww. - disconnect the electric line from the motor andopen out the same from its position and keep it insafe position., dismantling the gear box part by part and store thecomponents in a safety place to avoid any damaged., open out the cover plate of the valve by using gascutter, electric welding etc., dismantling the valve by open out distance piecegland, top cover, lead nut valve , etc., mfg., supply, fitting fixing of lead screw as persample., mfg., supply, lead nut as per sample., machining the valve shutter after removing olddilapidated ring., mfg., supply, fitting, fixing of g.m ring for valvebody(02 nos.)., mfg., supply, fitting, fixing of g.m ring for valveshutter(02 nos.)., supply and delivery of skf make bearing no. 6317, supply and delivery of skf make bearing no. 51311, complete lapping and matching the valve and valveshutter by rubbing compound after necessarymachining to make the valve leak proof., re-assy. the valve by fitting, fixing, of shutter, topcover, gland cover, cover plate, etc., fitting, fixing of pedestal gear box, gear, gearspindle one by one and make the unit suitable foroperation., installation of valve in the delivery line with thehelp of special type of tools & tackles weldingmachine and gas cutter etc., fitting, fixing of motor with all accessories., sub total, gst 18%, cess 1%
Tender For auction sale of rolling stock - lot no. divn/s-yd/35/05/26-27/bg/cond./8w/coaches. description - iron and steel scrap cutup parts of bg cond./8w/coaches with n.f attachment without contents if any. 1) special repair 056903 wgaccn 2)se 058106 wgaccn nb: [1]. (a) all coaches are to be sold without 08 nos. wheel sets complete alongwith roller bearing with bio tanks and other excluded fittings as per latest excluded fitting list no.m2/c-19/excluded fittings/coach/1271 dt.13.09.2018. (b) the coaches are to be sold without 02 nos. serviceable bogies against special repairl no: 01-01 ( bogie end-2) and special repairl 02-01 ( bogie end-1) (c) the coaches are to be sold with 02 nos. unserviceable bogies without excluded fittings. against special repairl no: 01-01 and 02-01. nb[2]: special condition for rolling stock- a) all excluded fittings including wheel sets and bogie, if any, are to be handed over by the purchaser at the specified location for which the purchaser have to arrange labour/tools/ equipment for loading of the excluded fittings from cutting site and then transport it to specified location by their own arrangement/vehicle. they have to unload and stack the excluded fittings by their own arrangement including labours and hand over the same to: - (i) sse 27-28 bogies, coil spring, screw coupling, buffer sets etc. (ii) sse-19,wheel sets. (iii) sse-30, dv, aux reservoir, cr, common pipe bracket,alu. water tank, bmbc, etc. (iv) sse-29 bio tank. (v) sse-51 battery, fan, alternator, etc. (vi) sse-55 (all ac items) to hand over to concern stock holder with clear acknowledgement. the delivery of cut pieces of last 10 percent of lot size (subject to minimum of 01 no. rolling stock) will commence only when all excluded fittings arisen out of sold lot has been successfully handed over to custodian. b). delivery witnessing official will ensure that such nil value items has been cleared by purchaser before taking cut pieces of last 10 percent of lot size (subject to minimum of 01 no. rolling stock) delivery witnessing official will record following certificate on sale delivery register ¿purchaser clear all nil value items arisen after cutting of sold rolling stock and there is no left over available at cutting site (c) the rolling stock may either be on the cutting line or grounded and may or may not have trolley/wheel set attached but the purchaser needs to shift to concerned location as advised by concerned sse. nb:-[3] 08 nos. wheel sets complete along with roller bearing, 02 nos seviceable complete bogies, bio tanks and other excluded fittings are to be handed over by the purchaser at specified location as advised by concerned sse. nb:[4] delivery will be given in numbers. nb: [5] the purchaser is required to take adequate safety measures so that no railway property is near vicinity of the cutting spot is damaged in any way. the purchaser will be responsible for any damage/fire accident to the railway property caused during operation and delivery. and the purchaser will be solely responsible of any loss applied ( railway employee or any other person) caused due to any activities involved while dismantling /cutting, of the coaches, transportation loading and unloading of all excluded fittings of the coaches . including wheel sets and trolleys.
Tender For e-quotation for seeking firm rates for non-schedule items for preparing estimates. - s/i/t/c of new 80 hp vt pump set, supplying,installation,testing and commissioning of vt pumpset (confirming to is1710:2021 standards) with 35 ft suitable size ms column pipe assembly in random length of 5 ft.(make-jyoti/wpil/kirloskar) with ss/bronze impeller capable to discharge 216 m3/h against a total head of 68m coupled with vertical solid shaft tefc ie3,ip55 type squirrel cage induction motor (make-siemens/crompton/abb) operating on 3 phase 50 hz,415v+- 10% supply and having speed 1400-1500 rpm (bhp of motor should be 10% more than that of pumpset including cost pof supplying,fitting and fixing of all required accessories, repairing of 80 hp vt pump set at raw water, supplying all labour tools and tackles for taking out the 40hp vt pump set with bowl assembly, column pipe and line shaft etc., cost towards dismantling of complete bowl assembly., cost towards repairing and fitting the parts of vt pumpset as per requirement (works as complete overhauling of the pump) such as:-1.machining/lathe work 2.changing ss top shaft,line shaft(2 nos of 5 feet) of and bottom shaft2.repairing of bowl assembly and impleller3.supplying and fitting c.l spider bearing with rubber cut less bush-4nos4.supplying and fitting of worn-out nut-bolts,bolt-nut washer,gland body bush machining,other machining works,etc as per requirement, complete assembling the pump set and lowering including supplying all petty materials., cost for supplying and installation of required accesories for repair and maintenance of motor control panel such as:-150 amp contactor-2 no (for 1 no starter)160 amp,breaking capacity -36ka mccb 1 no56-90 a electronic overload relay-2 nostimer-2 nosvolt meter 1 nosamp motor 1 nospilot lamp 6 nosselector switch 4 nossingle phase preventer 2 nos[ all accessories of reputed make]with complete internal wiring with suitable size of copper wire and testing on load., repairing of 30hp c/f pump sets at clear water, cost for dismantling of 30 hp c/f and pump inspection,changing of its damaged parts such as:-key-01 no, gland tightner -1 set, gland tightner stud-2 nos, c.i bearing housing with cap -1 set, ball bearing 6306 (skf)-2 nos, grease, gland packing,maching of the pump parts as per required etc all complete and testing on load etc., cost towards complete repairing of motor control panel starter 30hp cf pump set opening and changing of damaged parts such as 1.mccb - 50 amp,25ka,3pole-2 nos (for motor backup protection),mccb -100 amp,50ka,3pole-1 no (main mccb)2.overload relay 26-40 amp-1no3.star delta timer-1no4.digital volt meter,ampere meter,three pahse indicator lamp,push button on/off,on/off/trip indicator,wiring,etc as per required, repairing of 15hp c/f pump sets at clear water, cost for dismantling of 15hp c/f and pump inspection,changing of its damaged parts such as:-key-01 no, gland tightner -1 set, gland tightner stud-2 nos, c.i bearing housing with cap -1 set, ball bearing 6306 (skf)-2 nos, grease, gland packing,maching of the pump parts as per required etc all complete and testing on load etc., cost towards complete repairing of motor control panel starter 30hp cf pump set opening and changing of damaged parts such as 1.mccb -25 amp,15ka,3pole-2 nos (for motor backup protection),mccb -50 amp,25ka,3pole-1 no (main mccb)2.overload relay 20-25 amp-1no3.star delta timer-1no4.digital volt meter,ampere meter,three pahse indicator lamp,push button on/off,on/off/trip indicator,wiring,etc as per required