Web Analytics Made Easy - StatCounter

Hydraulic Pump Repair Tenders

Get complete information related to latest Hydraulic Pump Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydraulic Pump Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydraulic Pump Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45625904 Due date: 26 Jun, 202626 Jun, 2026 NA
Tender For supply of automatic online water pressure booster pump of make-crompton, make-leo, make-eterna or similar make specification -circulating pump:120 w,head range: 2-9m, current: 0.7 amp, 1ph, 50hz, ip44,duty:s1, pipe size: 13x13 mm, insulation class:f, power input: 0.12/0.16 kw/hp, dis. range: 24-6 lpm, voltage: 220+10/220-10%, max. water temp.:90 c, cap.value:3.5uf(450v), speed: 2900rpm as per attached specification. [ warranty period: 30 months after the date of delivery ] ]

Central Government / Public Sector

CTN :45515885 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For procurement of spares of drive turbine of circulating water pump - list of item(s) / work(s) as per tender documents, brg liner low half p/n 667997-8, brg liner upp half p/n 667997-7, th brg assly p/n 672171-18, sleeve p/n 693952-1, sleeve p/n 681816-1, spring p/n 692334-1, packing ring p/n 634159-52, knife edg latch p/n 436004-1, retaining ring p/n p27d27, bushing p/n 682498-1, oil ring p/n 640927-1, sentinel vlv p/n p68a11

CTN :45416327 Due date: 16 Jun, 202616 Jun, 2026 11.00 Lacs
Tender For supply of multi process control trainer setup for instrumentation engineering lab under mhrd scheme - purchase of multiprocess control trainer setup for instrumentation engineering lab under mhrd scheme - multiprocess control trainer set up, multiprocess control trainer set up - specifications:- setup must contain flow, pressure, level, temperature loops also derived loops like cascade and feedforward loops. temperature loop must be independent. setups consist of a circulating closed loop water plant or circulating water system including control valve, tanks, independent pumps and necessary valves including bypass valves and rotameters. using this we can be able to do flow control loop with pid,level control loop with pid,and pressure control pid, as independent experiments.the setup must include the following:1.one linear characteristics diaphragm operated control valve with 15mm stroke 1/2-inch size, type: high-capacity globe seat leakage class (as per ansi/fci 70.2).2.measuring tank with volumetric measurement scale and 1000mm level, in of 25 ltr capacity. sump tank min of 40 ltr capacity. all tanks made of ss304, with sight glass, and finished with mat steel finish.3.2 no s smart dp transmitter for flow and level measurement with hart protocol, display and keys integrated for calibration,0-1000mmh2o measurement range,0.01% accuracy, international iso certified ce approved make,24v supply,4-20ma output, loop powered.4,1nos of magnetic flowmeter with display and keys integrated for calibration,0-2000lph measurement range, read out: 0 - 100%, 4-20ma lcd display,0.05% accuracy, international iso certified ce approved make,24v supply,4-20ma output to measure flow as a independent loop.5,. smart pressure transmitter and temperature transmitters with hart protocol, display and keys integrated for calibration, pressure transmitter 0-10bar measurement range, read out: 0 - 100%, 4-20ma lcd display,0.05% accuracy, temperature transmitter 0-250 rtd type international iso certified ce approved make,24v supply,4-20ma output, loop powered.6, pressure tank of 24 liters with necessary valves for pressure loop.7.1nos orifice plate (ss304) and assembly grade with flange 1/2-inch size for flow measurement.8.2 nos pumps 0.5hp, ss centrifugal pump, minimum 1-inch pipeline of ss or high-pressure withstanding plastic with plastic welding.9. rotameters 2nos 1 inch size flow: 200-2000 l/h,ss thread, clear acrylic type.10, plc control station with 4 analogue inputs and one analogue output with necessary digital inputs and outputs to operate all loops directly from panel side.plc must have ethernet connectivity with supported protocols profinet and modbus tcpip.11.required all pneumatic components to full fill the process loops such as fr,needle valves etc.12,i to p converter 4-20ma to 3-15psi with 1/4" process connection with proper copper copper tubing.13, loop including flow pid control, level pid control, pressure pid control, cascade control (level flow), ratio control (flow flow).14.all loops can be operated using a scada system and independent pushbutton control includes trend of all analogue signals and pid tuning. scada direct profinet connectivity to plc and computer with intel i5 processor, 8gb ddr3 ram,1tb sata hdd,licenced windows 11 professional.15, required a standalone software application that must be installed on pc in which it can used to control and monitor all the functions used in scada. the application must contain process parameter trend graph plot for to study about process loops.16.the whole system setup must be in ms powder coated standalone mobile table with lockable castor wheels. all the components used be industrial. copper tubing for air connection, pressure gauges 4inches 3nos, electrical wiring connection to be flexible for to connect field devices. panel with switches, indicator, test points with banana connectors as required, multistrand wire with proper insulated lugs, ferruling & neat wire dressing & clam

CTN :45451344 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For supply of water pump assy , rear view mirror , hose pipe air , gasket kit , reverse fuel pipe , hydraulic pipe , air filter , hydraulic pump repair kit

Central Government/Public Sector

CTN :45346627 Due date: 08 Jun, 202608 Jun, 2026 22.69 Lacs
Tender For supply of fluid connection kit pf to cv top part no- 412019160 , fluid connection kit pf to cv bottom part no- 412019126 , electro magnetic switch horizontal part no- 412019208 , electro magnetic switch vertical part no- 412019207 , variation converter part no- 412019214 , rectifier box part no- 412019011 , dissolve link part no- 412019002 , fluid connection kit part no- 412019128 , fluid connection kit jc to pf part no- 412019157 , hydraulic pump repair kit part no- 274952158rk , relief valve repair kit part no- 274952165rk

Central Government/Public Sector

CTN :45115332 Due date: 29 May, 202629 May, 2026 NA
Tender For replacement of deep tubewell at ssm station against deep tubewell coming under the alignment of new developing circulating area (south side) along with pump house and water supply pipeline with other ancillary work under aden/dos.

Central Government/Public Sector

CTN :45120411 Due date: 15 May, 202615 May, 2026 NA
Tender For supply of automatic online water pressure booster pump of make-crompton, make-leo, make-eterna or similar make specification -circulating pump:120 w,head range: 2-9m, current: 0.7 amp, 1ph, 50hz, ip44,duty:s1, pipe size: 13x13 mm, insulation class:f, power input: 0.12/0.16 kw/hp, dis. range: 24-6 lpm, voltage: 220+10/220-10%, max. water temp.:90 c, cap.value:3.5uf(450v), speed: 2900rpm ]

CTN :45100085 Due date: 16 May, 202616 May, 2026 69.50 Lacs
Tender For providing of custom bid for services - operation and maintenance for 1 water treatment plant 2 circulating water pump house 3 drinking water supply to factory and township 4 water line maintenance including fire hydrant lines at hepf factory and township trichy as per scope of w..

Central Government/Public Sector

CTN :45036860 Due date: 21 May, 202621 May, 2026 NA
Tender For replacement of deep tubewell near station building, wcc and near sbi circulating area with pump house and water supply pipeline connection to over head tank under aden/hq/ddu

Central Government/Public Sector

CTN :44967551 Due date: 15 May, 202615 May, 2026 NA
Tender For replacement of deep tubewell near station building, wcc and near sbi circulating area with pump house and water supply pipeline connection to over head tank under aden/hq/ddu
 Loading, Please wait...

Connect us via What's Up