Get complete information related to latest Hydraulic Splitter Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydraulic Splitter Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydraulic Splitter Tenders.
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of nizar and kukarmunda taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (pave
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, o kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including mecessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for took of of the roto of 3 elg/10cgmonducing bitume , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot / drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. , necessary firewoood, oil, lubricants, labour charges etc
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of songadh taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene abour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including tolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oi ubricants, labour charges, using contractor's own drum mix olant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual _aying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oi ubricants labour charges using contractor's own drum mix , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing ag
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of ukai taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, a kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver , finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant. machineries and eginment , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq
Tender For repair and maintenance of bituminous road and bituminous mastic asphalt over damaged concrete road inside mtps plant premises at dvc, mtps, bankura, west bengal.
Tender For providing and laying road materials and machinery for various road under surat (r&b) division-1, surat. asphalt patch work and miscellaneous work of i.r and c.r. for annual rates (asphalt work) - providing and laying 50 mm thick compacted b.m. in single layer with b.t. aggregate as per morth specification and bitumen grade 60 or 70 (vg-30) for tack coat at 2.5 kg. or 10sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at the rate 34.0kg or m.t. i.e. 3.4 percentage of total mix including heating the aggregate and asphalt by batch mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete for surat (r and b sub division no.2 surat), for sub division svr sub division, providing laying 20mm (compacted) thick mix seal surface premixed with bitumen grade 60 or 70 (vg-30) tack coat at 2.5 kg. or 10 sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at 5.09 percent by weight of total mix and filler, bitumen during preparing of hot mit material in drum mix plant with all taxes and delivery at hot mix plant site, labour charges and or tools required and asphalt by drum mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. completefor surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and laying 25 mm thick compacted s.d.b.c.with b.t. stone chips as per m.o.r.t.h. gradation and specification and bitumen grade 80 or 100 for mixing at the rate of 50 kg or m.t.by wt. of mix i.e.(5.0 percentage of total mix) (as per mix design) including the aggregate and asphalt by batch mix mix plant using including heating and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete.for surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and applying asphalt painting on b.t. surface with mechanical sprayer using bitumen 60 or 70 (vg-30) at the rate of 5.00 kg or 10 sq.mt. and spreading stone dust on painting surface at the rate of 0.03 cu.m. or 10 sq.mt. and rolling with smooth wheeled and pneumatic roller and brushing etc. complete. for surat (r and b sub division no.2 surat), for sub division svr subdivision
Tender For supply of item rate for construction materials for all types of construction works under mgnrega - hire charges of coaltar boiler 900 to 1400 litres, hire charges of concrete mixer 0.25 to 0.40 cum with hopper, hire charges of diesel road roller- 8 to 10 tonne, production cost of concrete by batch mix plant, hire charges of diesel truck-9 tonne, hire charges of sparaying machine including electric charges, hire charges of coaltar sprayer, hire charges of barber green, drying,mixing and asphalt plant, with accessories, capacity 30/45 tonne, pumping charges of concrete including hire charges of pump, piping work & accessories etc., hire charges of derrick monkey rope, hire charges of pump set of capacity 4000 litres/hour, vibrator (needle type 40 mm), machine for rubbing of floors, front end loader capacity 1.00 cum, hire and running charges of tripod and mechanical winch machine complete with power unit and accessories, mastic cooker, hire and running charges of tipper, hire and running charges of loader, hand grinder for mirror polish, hydraulic excavator (3d) with driver and fuel, pin vibrator, surface vibrator, hot bitumen mixer 0.5cum i/c hand cart, hire and running charges of hydraulic piling with power unit etc. including complete accessories and shifting at site, hire and running charges of light crane, hire and running charges of bentonite pump, hire and running charges of vibrating pile driving hammer complete with power unit and accessories, hire and running charges of crane 20 tonne capacity, carriage of concrete by transit mixer, generator 250 kva, paint applicator, mobile crane, tractor with ripper attachment, tractor with trolley, air compressor 250 cm with two leads for pneumatic cutters/hammers, joint cutting machine with 2-3 blades, c.c.batch mix plant, road sweeper, slip form paver with sensor, water tanker 5000 ltr. capacity, concrete joint cutting machine, texturing machine, dozer d-80-a12, motor grade 3.35 meter blade, hydraulic excavator of 1 cum bucker, front end loader 1 cum bucket capacity (incl pol), tipper -5 cum, vibratory roller 8 to 10 tonne, smooth wheeled roller 8 to 10 tonne, tandem road roller, water tanker 5 to 6 kl capacity, air compressor, wet mix plant 60 tph, mechanical broom hydraulic, emulsion pressure distributor @1750 sqm per hour, hot mix plant - 120 tph capacity, hot mix plant 100 tph capacity, paver finisher hydrostatic with sensor control 100 tph, paver finisher mechanical 100 tph, batching and mixing plant @75 cum per hour, concrete paver finisher with 40 hp motor and sensor, generator 250 kva, generator 100 kva/125, truck 5.5 cum/ 10 tonnes, road sweeper (mechamical broom) @ 1250 sqm per hour, drum type hmp of 60-90 tph capacity @ 75 tonne per hour actual output, hire and running charges of drill machine up to 400 mm dia (including cost of mobile oil, disesel consumption in ordinary soil operator), pile integrity testing equipment, excavation of diaphragm wall by mechanical grab, hire charges of tata 407 or equivalent for local shifting, hire charges of diesel truck - 9 tonne (without pol), using cost of ultra voilet radiation tube, compressor, gun, rubber pipes & other accessories - hire charge of plant & machinery i/c necessary fuel, hire charges of suction jeting machine 2200 psi machine i/c pol and operator, hire charges of drill machine upto 30 mm dia, hire charges of sand blasting equipment, hire charges of compressor, welding charges of shear key to existing reinforcement, hire charges of plant and machinery that can inject 350 kg/day, seam bolts and nuts 6 mm dia and 25 mm long, fibre (high impact poly propelene reinforced) cement corrugated sheet 6 mm thick, fibre (high impact poly propelene reinforced) cement close fitting adjustable ridge, fibre (high impact poly propelene reinforced) cement corrugate serrated adjustable ridge, fibre (high impact poly propelene reinforced) cement plain wing adjustable ridge, fibre (high impact poly propelene reinforced) cem
Tender For transportation of hot asphalt by bowser from bpcl and hpcl refineries in mumbai to pune municipal corporations yerwada hot mix plant (part 2)
Tender For providing and laying road materials and machinery for various road under surat (r&b) division-1, surat. asphalt patch work and miscellaneous work of i.r and c.r. for annual rates (asphalt work) - providing and laying 50 mm thick compacted b.m. in single layer with b.t. aggregate as per morth specification and bitumen grade 60 or 70 (vg-30) for tack coat at 2.5 kg. or 10sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at the rate 34.0kg or m.t. i.e. 3.4 percentage of total mix including heating the aggregate and asphalt by batch mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete for surat (r and b sub division no.2 surat), for sub division svr sub division, providing laying 20mm (compacted) thick mix seal surface premixed with bitumen grade 60 or 70 (vg-30) tack coat at 2.5 kg. or 10 sq.mt. with mechanical sprayer and bitumen grade 60 or 70 (vg-30) for mixing at 5.09 percent by weight of total mix and filler, bitumen during preparing of hot mit material in drum mix plant with all taxes and delivery at hot mix plant site, labour charges and or tools required and asphalt by drum mix plant and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. completefor surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and laying 25 mm thick compacted s.d.b.c.with b.t. stone chips as per m.o.r.t.h. gradation and specification and bitumen grade 80 or 100 for mixing at the rate of 50 kg or m.t.by wt. of mix i.e.(5.0 percentage of total mix) (as per mix design) including the aggregate and asphalt by batch mix mix plant using including heating and spreading the same by manually patch work and consolidation with vibratory roller including providing all materials, equipments, tools and plants, oil, kerosene, fire wood, labour charges etc. complete.for surat (r and b sub division no.2 surat), for sub division svr subdivision, providing and applying asphalt painting on b.t. surface with mechanical sprayer using bitumen 60 or 70 (vg-30) at the rate of 5.00 kg or 10 sq.mt. and spreading stone dust on painting surface at the rate of 0.03 cu.m. or 10 sq.mt. and rolling with smooth wheeled and pneumatic roller and brushing etc. complete. for surat (r and b sub division no.2 surat), for sub division svr subdivision