Get complete information related to latest Hydraulic Structure Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydraulic Structure Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydraulic Structure Tenders.
Tender For supply of supply of video wall display panels , supply of video wall controller system , supply of floor mount structure suitable for video wall , supply of all required cables hdmi dp lan power connectors accessories , installation testing and commissioning
Tender For supply, installation, testing and commissioning of 1250 kva transformer with dp structure and other accessories for new g plus 5 annex building, high court of orissa, cuttack.
Tender For consultancy service for survey, geotechnical investigation, design and estimate preparation for construction of new check dam/bandhara/hydraulicstructure in the jurisdiction of junagadh irrigation division, junagadh for the year 2026-27 (second attempt)
Tender For corrigendum : supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure p
Tender For rate contract of miscellaneous item for financial year 2026-27 at grampanchayat ghot tah. chamorshi- 9 watt led bulb, 12 watt led bulb, 18 watt led bulb, 20 watt led bulb, 23 watt led bulb, 30 watt led bulb, 50 watt led bulb, 12 watt battery backup bulb, 20 watt led tube light, 20 watt led street light, 24 watt led street light, 30 watt led street light, 36 watt led street light, 40 watt led street light, 45 watt led street light, street light clamp,angle and nut-bolt, 50 watt led flood light, 100 watt led flood light, 150 watt led flood light, 200 watt led flood light, holder heavy 6amp, holder 6amp, 1/18 wire bundle , 2.5 mm service wire bundle , 1 mm multi wire bundle, 1.5 mm multi wire bundle, 2 mm multi wire bundle, 4 mm multi wire bundle, 4 mm service wire bundle, 6 way moduler board , 6amp socket, 16 amp socket, 6amp switch, 16 amp switch, 3 pin top 6amp, 3 pin top 16amp, meter peti, wooden board, 16 amp main switch, 32 amp main switch, 16 amp mcb, 32 amp mcb, power plug, dp switch, celing fan , wall fan , stand fan, casing patti , cooler 4 feet , cooler 6 feet , cooler, insulation tep , 1 hp submercible pump (ac), 3 hp submercible pump (ac), 5 hp submercible pump (ac), 7.5 hp submercible pump (ac), 1 hp mono block pump , dc grundfose motor 2.5-2, helical shift 2.5-2, hydrolic kit 2.5-2, magnetic motor 2.5-2 , trust bearing 2.5-2, carbon platet bearing, hydrolic cylender, n.r.v, sensor cable , 1 hp starter , 5 hp starter , 1 hp submercible pump (dc), 3 hp submercible pump+motor +controller (dc), 5 hp submercible pump+motor +controller (dc), 7.5 hp submercible pump+motor +controller (dc), 2.5 mm submercible cable , 100 watt solar panle , 150 watt solar panle , 335 watt solar panle , 545 watt solar panle , 4 mm dc cable , flot (sensor), cotroler (dc), 8 mm rope, 1kva inverter + battery 150ah, 2kva inverter + battery 150ah x 2, 3kva inverter + battery 150ah x 2, 1kva inverter + battery 150ah solar panle home light system, 3kva inverter + battery 150ah solar panle home light system, 5kva inverter + battery 150ah solar panle home light system, 1kva roof top (solar panle +structure), 3kva roof top (solar panle +structure), 5kva roof top (solar panle +structure), solar kandil, 12 watt led solar street light , 15 watt led solar street light, 12 watt led solar street light with pole and accessories complet, 15 watt led solar street light with pole and accessories complet, 7 mtr solar highmast (octagonal pole, 30 watt solar street light - 5, 30 amp lithium battery - 5, 100 watt solar panle - 5) , 9 mtr solar highmast (octagonal pole ,50 watt led street light - 4, 30 amp lithium battery - 4, 100 watt solar panle - 4), 9 mtr highmast light (ac) (octagonal pole, 150 watt flood light - 5 etc…..), 12 mtr highmast light (ac) (octagonal pole, 200 watt flood light - 5 etc…..), water filter 12 lph (ro machine ), water filter 15 lph (ro machine ), water filter 20 lph (ro machine ), water filter 25 lph (ro machine ), water filter 50 lph (ro machine ), water filter 500 lph (ro machine ), water filter 1000 lph (ro machine ), seadimate candel 25 lph /50 lph, p.p candel 25 lph/50 lph, carbon candle 25 lph / 50 lph, membran ro 100 gpd, membran ro 150 gpd, ro booster pump 150 gpd, ro s.v, ro booster pump 100 gpd, ro smps, water cooler 20+20 , water cooler 20+40, water cooler 80+40, refrizrator 180 lph , 32" led tv (smart android), 43" led tv (smart android), ahuja sound system (amply 120 watt-1, unit-60 watt-2, bhonge -2, mick-2 mick stand -2) , ahuja sound system (amply 225 watt-1, unit-60 watt-2, bhonge -2, mick-2 mick stand -2) , speaker box , c.c.t.v camera setup (4 cha dvr ), c.c.t.v camera setup (8 cha dvr), all in one sound system , fogging machine , 12vo/100ah battery , 12vo/150ah battery , 850 nxg solar inverter, 12vo/1050 watt inverter, 24vo/2300 watt inverter, solar panle structure, 12 way surface box, 8 way surface box, 6 way surface box, battery water 1 ltr , mobile starter , mini ac & dc home light system (light - 3, led light s