Get complete information related to latest Idler Gear Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Idler Gear Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Idler Gear Tenders.
Tender For supply of portable 4 stroke gasoline engine of output 3. 8kw of 5 hp at 3600rpm , trolley , rail track 3 mtr length with drive gear , heavy duty drive system gearbox , trolley wheels , track pillar 5 ft length , track pillar 3 feet length , vertical connecting bolt with nut for track pillar , base plate with adjustment bolt for track pillar , double clamp for track pillar , joint connecting bolt with nut , track connector , side track connector flat with adjustmet bolt
Tender For servicing of niv route veh d d - repair and servicing of mahindra scorpio 24b 140977w , repair and overhaul of front and rear axle of mahindra scorpio 24b 140977w , repair and servicing of gear box assy of mahindra scorpio 24b 140977w , repair and servicing of cooling system of mahindra scorpio24b 140977w , repair and servicing of suspension system of mahindra scorpio 24b 140977w , repair and overhaul of fuel injection pump of tata 2. 5 ton
Tender For tender for main machinery package jobs - equipment: steering gear systemboth (p&s) rudders are to be dismantled, rudder stocks are to be lowered, and then placed for inspection. the rudder pressure test is to be carried out and shown to the surveyor. the condition of all the bushes/housing pipes is to be checked and shown to the surveyor for recommendations. after the necessary inspection/repair of the lower bush, stuffing box, gland, rudder, rudder stock, they are to be fitted back in position. the operational test is to be shown to the surveyor as per regulations. potentiometer servicing is to be done.** drawings attached for reference., re-metalisation of bushes. approx dimensions: dia 220mm*l320mm mat: gm**will be settled at actuals., renewal of bushes mat: gm, equipment: propeller & shaftinginitial and final clearance between the propeller shaft & bushes is to be taken. both p&s propellers are to be dismantled along with accessories. both propeller shafts (p&s) are to be drawn from the stern gear system and to be placed for inspection by the surveyor. after bushes (p&s), a bracket bushes (p&s) are to be dismantled shown for inspection, for surveyors recommendation. propellers & propeller shafts with all bushes are to be boxed back after necessary repairing, as recommended by the surveyor. both propeller blades are to be cleaned/buffed, and polished. d.p.test by irs irs-approved firm of propellers, shafts, and propeller cones is to be shown to the surveyor s satisfaction. ** drawings attached for reference., re-metalisation of a bracket bushes (p&s) (approx l: 370mm dia 140mm) and aft bushes (p&s) (approx l: 220mm dia 120mm) . mat: gm**will be settled at actuals., renewal of a bracket bushes (p&s) (approx l: 370mm dia 140mm) and aft bushes (p&s) (approx l: 220mm dia 120mm) . mat: gm, renewal of groove cutless rubber of a bracket bushes (p&s) and aft bushes (p&s)., equipment: gear boxmain both (p& s) gear boxes are to be surveyed, satsfactory trial is to be shown to the surveyor after renewal of sump lub oil (15w40).
Tender For corrigendum : online electronic bids through electronic tendering system (ets)/ custom bid are inviting e-tender in two bid system for supply of high speed pinion and output gear with shaft for coal mill gear box main drive
Tender For nctps - i - se/m.ii circle – ahp dn. – unit i, ii & iii – outsourcing of operation and maintenance of pdfac system consists of plc, switch gear panels, modules, breakers, fly ash conveying, instrument compressors, intermediate conveying and instrument compressors and auxiliaries, pdfacs equipments in esp area, intermediate silo, cooling tower and fly ash pipelines to a length of 1500 mtrs from esp nctps - i to 1000 mt silo top located at nctps – stage ii including structural supports, silo top target box, vent bog filter system, silo top unloading chutes, loading the fly ash vehicles round the clock and 100 mt weigh bridge and auxiliaries, cleaning of silo area and silo approach road for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier.