Web Analytics Made Easy - StatCounter

Igniter Spark Tenders

Get complete information related to latest Igniter Spark Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Igniter Spark Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Igniter Spark Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45252502 Due date: 30 May, 202630 May, 2026 2.24 Lacs
Tender For tender for supply of coal feeder spares -drag lnk chain fdr worm wheel assembly , drag lnk chain fdr hub for coc gearbox , drag lnk chain fdr input shaft for coc g , drag lnk chain fdr coupling half for co , drag lnk chain fdr worm wheel rim for co , drag lnk chain fdr hub for coc gearbox , drag lnk chain fdr intermediate shaft fo , drag lnk chain fdr output shaft for coc , drag lnk chain fdr coc drive shaft beari , drag lnk chain fdr coc driven shaft , drag lnk chain fdr coc driven shaft slee , drag link chain feeder belt supporting b , drag link chain feeder coupling bush , drag link chain feeder output shaft asse , drag link chain feeder helical gear for , drag link chain feeder pinion for dyno g , drag link chain feeder worm shaft for dy , drag link chain feeder tensioning device , drag link chain feeder tensioning device , drag link chain feeder belt take up pull

CTN :45255749 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For tender for supply of hea igniter system -hea igniter exciter box , hea igniter cable assembly , hea igniter retractor assembly , hea igniter flexible spark rod assembly , hea igniter spark rod tip , hea igniter guide pipe assembly , local panel , control panel , common manual isolation valve instrument air , air set and air manual isolation valve instrument air with copper tube and fitting from burner front , cooling air one and half inch hard rubber high temperature hose 1500 mm with end clamp , erection materials mounting hardware and other supporting materials cables glands cable lugs

CTN :45260678 Due date: 01 Jun, 202601 Jun, 2026 NA
Tender For supply of 992wt03058 wheel rim assy (29 x 57 x 6 - xt demoun

CTN :45264913 Due date: 30 May, 202630 May, 2026 NA
Location: Goa - Goa Goa - Goa
Tender For supply of brake lever front , brake lever rear , throttle with key , saddle , chain , controller , crank set , disk rotor , padal set , charger , bottom bracket , battery lock , front fork rim , front wheel , rear wheel rim , rear wheel spoke set , freewheel cog

CTN :45071803 Due date: 30 May, 202630 May, 2026 NA
Tender For corrigendum : supply of front wheel rim , rear wheel rim

Central Government And Public Sector

CTN :45259383 Due date: 02 Jun, 202602 Jun, 2026 NA
Tender For supply of chain wheel rim 800mm

State Government

CTN :45244180 Due date: 21 May, 202621 May, 2026 NA
Tender For procurement of spares for hea ignitor system and flame scanners for unit-7 coh on open tender basis - fsss flam scanner flame scanner assy wit, bhel flame scanner bn10 scanner cable, hea spark gap ht-sgp-09, storage capacitor c1, c2 10 micro f 1500, hea igniter spark rod w/o spark plug tip, i&c fsss bhel spark rod tip-local, safe scan ii little fuse for lamp & mete, safe scan ii housing electronic card, flexible spark rod repered & without cab, safe scan ii flat lens thk 1.5 mm x od 2, hea exciter box heai exciter complete as

CTN :45237689 Due date: 03 Jun, 202603 Jun, 2026 NA
Tender For supply of aluminium split wheel rim 10.00x20

Central Government/Public Sector

CTN :45240751 Due date: 21 May, 202621 May, 2026 NA
Tender For supply of wheel and tyre assembly (solid rubber tyre with rim) size: 18 x 5 inches (06 holes) for 3 wheeler jaldoot make battery operated platform truck model no: sfhp 2 ton capacity. [ warranty period: 30months after the date of delivery ] ]

Central Government And Public Sector

CTN :45067006 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For wheel rim assy rear to godrej part no mh02161231 and new part no: 31360001dg00872 for the use of godrej 8 ton forklift. 1) warranty/guarantee period shall be for a period of minimum 6 months from the date of fitment or 9 months from the date ofsupply whichever is early against quality manufacturing defects and workmanship for the item supplied. 2) authorisation from oem is to be enclosed along with the offer. 3) offers are to quote both make and model number/part number with out which the offers will be summararily rejected. [ warranty period: 9 months after the date of delivery ] ]
 Loading, Please wait...

Connect us via What's Up