Tender For providing of customized amc/cmc for pre-owned products - customized universal testingmachine for pebble bed testing; nano tec; annual maintenance contract (amc); annually; no
Tender For supply, fitting , commissioning and testing of spare parts for bailing machine as per annexure attached. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply, installation testing and commissioning of heavy-duty ms (mild steel) arrangement of size 25x15ft, complete with opening and closing mechanism,, for the main entrance of traction motor machine (tm) shed [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For bhavnagar division: supply installation, testing, commissioning of signalling gears and alteration in medha make electronics interlocking system at dhasa, kukavav & chital stations in connection of (i) surendranagar - dhasa track machine siding at 06 stations. signaling work for alteration in ei at das station. (ii) dhasa - jetalsar section - creation of siding facilities for track machine siding at two stations. (chital and kukavav).
Tender For supply, installation, testing and commissioning of electric battery ride on type 3 nos sweeping machine and 1 big capacity electric battery ride on type self propelled road sweep machine under mlalad fund delhi cantt assembly constituency area ac 38
Tender For supply, installation, testing and comissioning of horizontal type dynamicbalancing machine with latest controller based measuring panel, auto calibration facility,auto cycle with adjustable time with minimum unblance mass measure limit 0.1 gm. and maximum unblance mass measure limit 0.4 kg. suitable for lhb ac coaches rmpu blower runner and frp fan blades as per standard supply and leaflet. accepted make bie, abro, schenck, global or similar. [ warranty period: 30 months after the date of delivery ] ]