Get complete information related to latest Infrastructures Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Infrastructures Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Infrastructures Work Tenders.
Tender For gdr-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation, providing central & cross drains for a total length of 27.862 km in sr.den/s/bza jurisdiction.
Tender For vijayawada division - bza - vskp sections ( up & dn): tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation duly providing toe bank, providing sand or boulder drains wherever needed for draining out of water from pockets of ballast penetrated in the formation in single line and double line track (up or dn line) with track centers less than 5.30 m of quantity 171498 cum at various locations. (sanctioned locations enclosed as annexure)
Tender For vijayawada division - ki-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation duly providing toe bank of cr line (0.450 km to 3.000 km) & bulb line ii (0.300 km to 1.400 km) with track centers less than 5.30m for total length of 3.65 km.
Tender For vijayawada division - bza - vskp sections ( up & dn): tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation duly providing toe bank, providing prec cast / cast insitu rcc central & cross drains to limited length where the distance between adjacent tracks is large enough (up or dn line) in formation of height less than or equal to 3m at various locations for a total length of 14.165kms (sanctioned locations enclosed as annexure) .
Tender For vijayawada division - bza - vskp sections ( up & dn): tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation duly providing toe bank, providing prec cast / cast insitu rcc central & cross drains to limited length where the distance between adjacent tracks is large enough (up or dn line) in formation of height greater than 3m at various locations for a total length of 17.781kms (sanctioned locations enclosed as annexure).