Web Analytics Made Easy - StatCounter

Insulating Base Tenders

Get complete information related to latest Insulating Base Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Insulating Base Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Insulating Base Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45471300 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For supply of 42 kv, 10 ka metal oxide gapless type lightning arrestor (station class) with insulating base,surge monitor as per rdso specification no. ti/spc/psi/mogtala/0101 (02/2015) or its latest. [ warrantyperiod: 30 months after the date of delivery ] ]

State Government

CTN :45237642 Due date: 13 Jun, 202613 Jun, 2026 6.00 Lacs
Tender For corrigendum : supply of supply of hdpe pipe , supply of stone pad , supply of nut and bolts , supply of lt clamp , supply of lt shackle isolator , supply of i hook , supply of dead and clamp , supply of suspension clamp , supply of pg clamp , supply of number plate , supply of gi pipe , supply of prc connector , safe carriage of pcc 8.5 m pole , safe carriage of pcc 9 m pole , safe carriage of st pole 11 m pole , safe carriage of st pole 13 m pole , safe carriage of 33 kv jointing kit o d , safe carriage of 33 kv xlpe cable , safe carriage of lt ab cable , safe carriage of 3 ph. distribution box , safe carriage of 33 kv cross arm v type , safe carriage of 33 kv f clamp , safe carriage of 33 kv pin insulator , safe carriage of 33 kv pin with nut , safe carriage of earthing complete , erection of pcc pole 8.5 m , erection of pcc pole 9 m , erection of pcc pole 11 m , erection of pcc pole 13 m , dismentalling of lt ab cable , erection of lt ab cable , erection of 33 kv xlpe cable , erection of cable jointing kit o d , erection of stone pad , erection of number plate , erection of earthing complete , erection of distribution box with clamp , erection of gi pipe , erection of hdpe pipe , carriage of old material

State Government

CTN :45467161 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For supply of gi v-cross arm , gi f-top , d-clamp for st pole , gi channel 3 feet long , 11kv polymer insulator , 33kv polymer fitting only , 11kv polymer disc fitting only , nuts and bolts , bamboo ladder , suspension clamp, i hook, dead end complete set , ipc , acsr conductor 0.03 , mccb, 3-pole 600 amp , mccb, 3-pole 400 amp , mccb, 3-pole 250 amp , mccb, 3-pole 160 amp , mccb, 3-pole 100 amp

Central Government/Public Sector

CTN :45422215 Due date: 03 Jul, 202603 Jul, 2026 NA
Tender For corrigendum : supply of set of insulating base for wag-9hc to drg. no:1209-01.415-015 alt-1 & 1209-01.315-016. [each set consisting of 02 (two) items as per set details attached] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

State Government

CTN :45427476 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment / material , design, erection, testing & commissioning for sop to civil hospital jawalamukhi by providing 11/0.4 kv, 400 kva dtr a/w 11 kv ht line in electrical section amb under esd hpsebl no-i jawalamukhi, ed jawalamukhi. - supply part of 11 kv ht line with aaac 7/3.81 (0.065 km), steel tubular poles 11 mtr. long with base plate, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm x2 no., x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, eye hook for earth wire, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, 11 kv g.o. switch, d.o fuse unit, aluminium paint, red oxide point, supply part of 11/0.4 kv 400 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble 300 sq mm, copper thimble 95 sq mm, danger plate, barbed wire, lt cable 3.5 core 400 sq. mm, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, transformer bed (civil work), chain link fencing, angle iron, gate etc. for transformer fencing, ct pt combined unit, energy meter (3-ph, 4-wire) dlms compliant 1000/5 a ct type for 400 kva dtr, pvc multistrand 2.5 sq mm copper wire, ms angle iron (50x50x6 mm) length 2800 mm x 4 nos., ms angle iron (50x50x6 mm) length 450 mm x 2 nos., erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 400 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 400 kva dtr

State Government

CTN :45427478 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment / material , design, erection, testing & commissioning for sop to improvement of distribution system of various lwss in eletrical section silh under esd hpsebl majheen, ed jawalamukhi. - supply part of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, cable 3.5 x 240 sq. mm, lt distribution panel box for 250 kva dtr, aluminium thimble 240 sq mm, capacitor bank 81 kvar for 250 kva dtr, danger plate, surge arrester, transformer bed (civil work), chain link fencing, angle iron, gate etc. for transformer fencing, chemical earth, aaac 7/4.26 sq. mm, chain pully 3 ton, supply part of ct-pt unit, ct pt combined unit (pt:11 kv/110 v ct: 200/5 a), 3-ph, 4-wire tri vector meter (pt - ratio -/110 v, pvc multistrand 2.5 sq mm copper wire, 1 inch dia gi pipe for concealing, bend joint/elbow, st pole 9 mtr long with base plate, muffs with concerete filling, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 4 nos], x-arm: [channel iron (75x40x4.8 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 1 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos, ms angle iron (50x50x6 mm), length : 2800 mm x 4 nos, ms angle iron (50x50x6 mm), length : 460 mm x 2 nos, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, aluminium paint., red oxide, erection part of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, erection charges & transportation charges complete in all respect of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, erection part of ct-pt unit, erection charges & transportation charges complete in all respect of ct-pt unit

State Government

CTN :45427480 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment/material, design, erection, testing commissioning for sop to jsv by prov. 11/0.4 kv, 25 kva dtr at bohal khalsa a/w 11 kv ht line in electrical section bharoli under esd hpsebl no-i jawalamukhi ed jawalamukhi - supply part of 11 kv ht line with aaac 7/3.81 (0.692 km), steel tubular poles 10 mtr. long, steel tubular poles 9 mtr. long, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm, x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), safety & maintenance equipment for line maintenance, ci 100x50x5 mm length 2340 mm, belt ai 50x50x6 mm length 1800 mm, aluminium paint, supply part of 11/0.4 kv 25 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, distribution transformer 11/0.4 kv, 25 kva, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, lt distribution panel box for 25 kva dtr, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, energy meter (3-ph, 4-wire) dlms compliant 50/5 a ct type for 25 kva dtr, lt switched capacitor 9 kvar for 25 kva dtr, erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 25 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 25 kva dtr

State Government

CTN :45427482 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For tender for supply of equipment/material, design, erection, testing commissioning for sop to improvement and augmentation of lis bharoli phase-ii 1 no. tube well of 15 hp at village pant in electrical section bharoli under esd hpsebl no-i jawalamukhi. - supply part of 11 kv ht line with aaac 7/3.81 (0.080 km), steel tubular poles 10 mtr. long, muff for steel tubular pole with concrete filling, aaac conductor 7/3.81, 80 sq. mm ( includes 3 conductor length and additional 1% sag (sag, jumpering and wastage)), single continuous earth wire (g.i wire 8 swg), x-arm ci 100x50x6 mm, length 2800 mm x 2 nos for incommer line, x-arm ci 75x40x6 mm, length 2800 mm x 4 nos for supporting do fuse unit & go switch, go switch handle supporting ci 75x40x5 mm, length 460 mm, go ab switch unit (11kv, 400a, 25 ka) tripple pole o/d type, do fuse unit, cross-arm {channel iron (100x50x6 mm), length 1270 mm}, 11 kv pin insulators ( porcelain, 12 kv, 10 kn): 3 no. per pole structure, ai (50x50x6 mm), length 750 mm, x-bracing set -ms angle iron 50x50x6, length {2125 mmx2 no }, pole top bracket (100x50x6 mm), length 100 mm, ht stay set complete, stay wire, earthing set ht complete in all respect, barbed wire (rec sp f 3-1981), half clamp, full clamp, danger plate (250x200x1.6 mm), nuts & bolts off sizes, discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), forntech inverter with 2 battries (ups), ci 100x50x5 mm length 2340 mm, belt ai 50x50x6 mm length 1800 mm, universal optical cable (for mri), aluminium paint, supply part of 11/0.4 kv 25 kva distribution sub-station, steel tubular poles 9 mtr. long, muffs with concerete filling, distribution transformer 11/0.4 kv, 25 kva, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos], ms angle iron (50x50x6 mm), length: 2800 mm x(1 nos for las), x-arm: [channel iron (75x40x6 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 2800 mm x 2 nos for transformer bed, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos, ms angle iron 35x35x5 mm), length : 460 mm x 2 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos for bed knee bracing, ms angle iron (50x50x6 mm), length : 2800 mm x 2 nos for lt distribution box and go switch assembly, ms angle iron (50x50x6 mm), length : 450 mm x 1 nos for lt distribution box and go switch assembly, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, lt distribution panel box for 25 kva dtr, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, lt cable 3.5 core 70 sq. mm, aluminium paint., red oxide, energy meter (3-ph, 4-wire) dlms compliant 50/5 a ct type for 25 kva dtr, lt switched capacitor 9 kvar for 25 kva dtr, erection part of 11 kv ht line, erection charges & transportation charges complete in all respect of 11 kv ht line, erection part of 25 kva dtr, erection charges & transportation charges complete in all respect of 11/0.4 kv, 25 kva dtr

State Government

CTN :45413511 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For tender for supply of equipment material design erection testing commissioning for sop to ms shyam indus pvt ltd co prittam singh at vill baghni by prov 1104kv 25kva sstn aw 3ph lt line in vill baghni in e section bhadwar under esd hpsebl nurpur. t - 25 kva trsanformer, prov. distribution transformer (ordinary), 11/0.4 kv, 25 kva ., prov. steel tubular poles (9 m, working load > 200 kgf/m ) ., prov. muffs with concerete filling, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for incomer line, prov. ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov. x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & go switch, prov. transformer bed, belting & knee bracing, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for transformer bed, prov. x-arm [channel iron (100x50x6 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (35x35x5 mm), length : (460 ) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov. transformer lt distribution box and go switch fixing assembly, prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov. go switch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov. go ab switch unit (11kv, 400a, 25 ka ) tripple pole o/d type, prov. d.o fuse unit, prov. lighting arrester, 9 kv station class (porcelain type), prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), prov. stay set complete, prov. stay wire (7/3.15 mm) (6.0 kg per stay set), prov. pipe earthing set, prov. lt distribution panel box with mccb(160a, 10ka, 4p, 1no) & sfu(32a, 5no, rewirable), prov. half clamp (m.s. flat 50x6 mm), prov. full clamps (m.s. flat 50x6 mm), prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. aluminium thimble, prov. copper thimble 35 amp, prov. danger plate, prov. barbed wire, prov. lt cable (3.5 core) 50 mm , prov. energy meter 3- , 4 wire ct operated static tri-vector meter with box(ct-100a), prov. aluminum paint., prov. 6/1/3.35, 50mm ., prov. construction of foundation of transformer, erection of 25 kva s/stn. i.e. digging of pit for pole & earthing two no. poles & 3 nos. for earth drilling of holes in x-arms, preparation of plateform str. members c.i., a.l. i.e. x-arms & k.b. set, errection of d/p, concreating of rcc muff errection of plateform, errection of x-arms, d.o., l.a., mccb, switch lt box, energy meter, errection of transformer, earthing connection to g.o. switch, transformer l.a. etc., errection of stay set, jumper, pipe earthing 3 nos set, l.t. cable, barbed wire and painting complete in all respect., transportation charges @10490/-, prov. transportation charges & mannual carriage of 25 kva pole mounted distribution s/stn. (line length 0.500km), erection of 3- ph. lt line, prov. aaac (7/3.15 50mm ) { neutral conductor including 1% (sag, jumpering and wastage}, prov. steel tubular poles (8 m, working load > 200 kgf/m )., prov. muffs with concerete filling, prov. shackle insulator with d-iron, prov. lt stay set i/c egg insulator., prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. stay wire, prov. g.i wire no 8swg, erection of 8 mtr. st pole single structure i.e. digging of pit, fixing of insulator, x-arms, k.b. set, top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect., sagging of conductor i.e. laying, stringing and sagging & binding with insulator (single wire per km)., sagging of g.i i.e. laying, stringing and sagging & binding with insulator (single wire per km)., erection of stay set lt i.e. d

Central Government/Public Sector

CTN :45421861 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For supply of set of insulating base for wag-9 loco consisting of (02 items 32 nos) as per drg no. (i) clw drg no. 1209.01.415.015, alt-1=08 nos (ii) clw drg no. 1209.01.315.016, =24 nos. [ warranty period: 30 months after the date of delivery ] ]
 Loading, Please wait...

Connect us via What's Up