Get complete information related to latest Insulating Plate Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Insulating Plate Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Insulating Plate Tenders.
Tender For tender for satisfactory trial. , carry out strengthening work using the channels and angles provided by src and irc and conduct a satisfactory trial. , to fabricate the weak sloppy plates of the donali suit fitted on milo from the given ms plate as per the drawing and give a satisfactory trial. , removing the worn out trpf cover fitted on the mill and making and fitting a new cover using the plate given as per the drawing sample and giving a satisfactory trial. , to carry out the work of tipping the teeth of mill rollers and conduct a satisfactory trial. , to carry out the work of chevron cutting as per requirement on mill rollers and give satisfactory trials. , work involving the errectation of broken teeth on the mill s pressure chute repair of worn out teeth via hard facing and conducting a satisfactory trial run , dismantling the old pressure chute errected on the mill completely replacing the corroded section repairing and welding the damaged parts of the ss plate reassembling the unit fitting it onto the mill , fabricate the juice tank for the mill house using the provided 6 8 mm plate and conduct a satisfactory trial run , removing the bottom of the supply juice tank errecting a 12 mm plate in its place and conducting a satisfactory trial. , manufacturing the bed for the s.r.c. and i.r.c. motor gear and conducting a satisfactory trial. , remove the worn out trpf headstock side plate errect a 6mm plate in its place and conduct a satisfactory trial. , fabricating teeth for the hydraulic grab replacing old or damaged teeth with new ones and conducting a satisfactory trial run. , a dismantling old columns beam channels etc. b manufacturing and installing new columns beam channels etc. , removing the old corroded platform and replacing it with a new one. , installing 16 inch 18 inch manholes with blinds , constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 hp. , dismantling fabricating and erecting weak corroded pipe lines up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded tees up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded nipples up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated cross member up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated band up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated flange up to 12 inch and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak sloping reducer up to 12 inch and providing a satisfactory leak proof trial.
Tender For tender for remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder , cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm , cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run , cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate , cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears , the casings of the boiler id and fd fans have become severely weakened and damaged the task involves cutting away and removing the weakened sections fabricating , cut and remove the deteriorated side bottom and top plates surrounding the air heater of boiler no. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions , fully strengthen the air heater plates and conduct a satisfactory trial. , dismantling the old air heater tubes of boiler no. 01 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 02 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 03 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , a. dismantling old columns beam channels etc. b. manufacturing and installing new columns beam channels , installing 16 inch 18 inch manholes with blinds , constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to twenty hp , dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. , removing the old corroded platform and replacing it with a new one
Tender For tender for supply of f cplg hfd 8 fluid coupling repair kit , f cplg hfd 8 iw fxo , f cplg hfd 8 o w adopter flange , f cplg hfd 8 o w fxo , f cplg hfd 8 i w fxi , f cplg hfd 8 o w flexible disc , f cplg hfd 8 i w flexible disc , f cplg hfd 9 disc assy 29 , f cplg hfd 9 bush 5 , f cplg hfd 9 o w fxo1 , f cplg hfd 9 i w fxo 33 , f cplg hfd 9 adoptor plate 6 , f cplg sc9 scoop tube s 4 , f cplg sc9 spherical bush , f cplg sc9 flexible disc os o 19 , f cplg sc9 filter 109 , f cplg sc11a spherical bush i 22 , f cplg sc11a flex disc i 24 , f cplg sc11a filter 109 , f cplg sc14 ip sph bush , f cplg sc14 ip flex disc assy , f cplg fluidomat sc14 filter 109 , f cplg sc11a flex disc 0 19 , f cplg sc9 flexible disc(is) i 24
Tender For supply of point insulation complete set as per rdso/spn/168/2005 revision 2.0 or latest for 1.switch bracket d bracket insulation for irs point machine - one set comprises of (a)side plate lh to drg.no. s-3266 - 1 no. (b) side plate rh to drg.no. s-3265 - 1 no. (c)insulating bush to drg.no. s-23199 - 4 nos. (d) insulating washer to drg.no. s-8640 - 4 nos., 2. split-stretcher bar 2.1 insulation for leading stretcher bars (bg) each set comprising of (a) insulatingplate for leading insulated stretcher bars bg as per rdso drg.no. t-10384 -2 nos. (b) insulating bushing for leading insulated stretcher bars for bg as per rdso drg.no. t-10368- 4 nos. (c) insulating washer for insulated stretcher bar bg as per rdso drg.no. t-10371 - 6 nos. 2.2 insulation for following stretcher bars bg. each set comprising of: (a)insulating side plate for insulated stretcher bars bg as per rdso drg.no. t-10367 -3 no. (b) insulatingbushing for insulated stretcher bars bg as per rdso drg.no.. t-10368 - 6 nos. (c)insulating washer forinsulated stretcher bars bg as per rdso drg.no. t10371 - 12 nos & 3. gauge tie plates (52 kg/60kg as per site requirement) insulation for (bg) complete with insulating bush and washer each set comprising of: (a) insulatingplate for insulated tie plate bg as per rdso drg.no. t-10372-1 no. (b) insulating bushing for insulated stretcher bar bg as per rdso drg.no. t10368 - 3 nos. (c) insulating washer for insulated stretcher bar bg as per rdso drg.no. t-10371 - 6 nos. spec:rdso/spn/168/2005 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of nylon 66 point insulations complete set with rdso spec no-irs s 40/84 or latest consists of 1.gauge tie plate insulation one set (insulatingplate drg no. t-10372=01 nos, insulating bush drg no. t- 10368=03 nos,insulating washer drg no. t-10371=06 nos) 2. d bracket insulation one set (insulatingplate (rh) drg no. s-3265=01nos, insulatingplate (lh) drg no. s-3266=01 nos, insulating washer drg no.s-8640=04nos, insulating bush drawing no.s- 23199=04nos) 3.stretcher bar insulation one set (insulatingplate drg no.t-10367=01 nos, insulating bush drg no.t-10368=02 nos, insulating washer drg no.t-10371=04nos) 4. l-bracket insulation one set (insulatingplate drg no.s-8804=01 nos, insulating washer drg no. s -8640=02 nos, insulating bush drawing no.s-8813=02 nos) [ warranty period: 30 months after the date of delivery ] ]
Tender For items of insulating components for ground connections of 220mm stroke point machine in set. one set consists of: 1) insulating bush for switch extension bracket to drg.no. s-23199: 04 nos. 2) bush for drive rod lug to drg. no. rdso s 3463: 1 no. 3) insulatingplate rh to drg. no. s 3592: 01 no. 4) insulatingplate lh to drg. no. s-3593: 01 no. 5) insulating washer to drg. no. s-8640: 04 nos. 6) drive rod insulation washer to drg. no. cwm 10323: 2 nos. 7) crank bush to drg. no. s 8912 alt-2: 6 nos. 8) insulation plate for gauge tie plate to drg. no. cwm 09723: 03 nos. 9) insulating washer for gauge tie plate/stretcher bar to drg.no. cwm 09623 : 22 nos 10) insulation bush to drg.no.cwm 09923 : 11 nos 11) collar bush small to drg.no. cwm 05822alt-1 : 06 nos. 12) collar bush large to drg.no. cwm 05722 alt-1 : 06 nos. note: a) each set to be packed in suitable polythene covers in sealed condition. b) material test certificate from nabl accredited laboratory shallbe submitted along with each batch of supply. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max8 lacs ] ]
Tender For items of insulating components for ground connections of 143mm stroke point machine in set. one set consists of: 1) insulating bush for leading stretcher bar to drg. no. s-8813: 02 nos. 2) insulating bush for switch extension bracket to drg. no. s-23199: 04 nos. 3) insulatingplate rh to drg. no. s 3265 alt-1: 01 no. 4) insulatingplate lh to drg. no. s-3266 alt-1 : 01 no. 5) insulating washer to drg. no. s-8640 : 06 nos. 6) crank bush 'b' to drg. no. s 8912 alt-2 : 04 nos. 7) insulation plate for gauge tie plate to drg. no. cwm 09723 :02 nos. 8) insulating washer for gauge tie plate/stretcher bar to drg. no. cwm 09623 : 28 nos. 9) insulation bush for gauge tie plate/stretcher bar to drg. no. cwm 09923 : 14 nos. note: a) each set to be packed in suitable polythene covers in sealed condition. b) material test certificate from nabl accredited laboratory shall be submitted along with each batch of supply. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max8 lacs ] ]