Tender For construction of cc drain and deck slab at siddanahosahalli village from lakshmipura mainroad to siddaraju house in madanayakanahalli cmc limit and construction of bituminous road work at siddanahosahalli village from koli angadi road yashoda shekar house to nagamma house in madanayakanahalli cmc limit and construction of cc drain at siddanahosahalli village vinayaka layout from setu rameshchand house to muniyamma house in madanayakanahalli cmc limit and construction of cc drain and development of road at bheemeshwaranagar from police ramesh vegetable shop to jagadeesh house in madanayakanahalli cmc limit and laying of covering slabs over old drain and providing bituminous road to beemeshwaranagara laatsab house and nh-04 road adjacent to renukayya house in madanayakanahalli cmc limit and construction of cc drain and deck slab at basaveshwara layout from sharadamma house to ramakrishna house in madanayakanahalli cmc limit
Tender For construction of bituminous road work at hanumanthasagara village from kamalamma house to towards om shakthi temple and up to hanumanthegowdanapalya village hanumakka house in madanayakanahalli cmc limit and construction of cc drain at thirumalapura from nice road toll to rajakaluve in madanayakanahalli cmc limit
Tender For construction of cc drain at lakshmipura village bda mainroad to appanna katte in madanayakanahalli cmc limit and construction of cc drain two side at lakshmipura village bda main road to maruthi layout in madanayakanahalli cmc limit and construction of bituminous road at kolliganahalli village brundavana layout from bairappa house to vishwanath house in madanayakanahalli cmc limit and construction of road work at kammasandra village from umayathish house to ramesh house in madanayakanahalli cmc limit. and construction of cc drain at kammasandra village lakshminarasimha temple opposite main road and maara arasaiyya house to narasimha house in madanayakanahalli cmc limit.
Tender For construction of bituminous road and cc drain balance work at madanyakanahalli from basaveshwara circle, upto kuduregere road in madanayakanahalli cmc limit and construction of cc drain at madanyakanahalli village from police rajanna house to rajendra singh house in and construction of cc drain at madanyakanahalli village annapoorneshwari layout and construction of cc drain balance work at madanayakanahalli texport garments opposite in madanayakanahalli cmc limit.
Tender For annual rate: 2025-26 rates of supplying, stacking bituminious materials and labour work on various roads of vyara and dolvan taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accord
Tender For annual rate : 2025-26 rates of supplying , stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance w
Tender For annual rate : 2025-26 rates of supplying, stacking bituminous materials and labour work on various roads of valod taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with t
Tender For re-carpeting of residential and farm area, inner circle road and construction of bituminous road portion from international hostel to type-e, qtr. at icar-ndri, karnal, haryana. sh: balance work.subwork/packages:maintenance work
Tender For renovation and widening work of bituminous road from jamadoba bhowra main road to dumri no. 03 pankha ghar via dumri 2 no. and dumri 3 no. in ward no. 40 under dmc, dhanbad (4th call)