Web Analytics Made Easy - StatCounter

Iron Barrel Scraps Tenders

Get complete information related to latest Iron Barrel Scraps Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Iron Barrel Scraps Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Iron Barrel Scraps Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45516761 Due date: 26 Jun, 202626 Jun, 2026 NA
Tender For ready mix instantaneous bituminous concrete is 25 kg bags , bitumen cold emulsion in 200 kg drum , cement -opc in 50 kg bags , kerb stone 450mm , kerb stone 300mm , paver block 60mm , paver block 80mm , tactile tiles 60mm 300x300 , jersey barriers , safety cone , traffic barricades

State Government

CTN :45462730 Due date: 20 Jun, 202620 Jun, 2026 NA
Tender For annual rate of hotmix material for various roads under rajpipla (r&b) division rajpipla (2026-27) - providing and laying premix semi dense bituminous concrete with b.t. aggregate as per morth gradation & using bitumen emulsion rs-1 as per is 8887: for tack coat @2.50 kg./10 sq.m. on bt surface with asphalt grade vg-30 for mixing @ 50.00 kg./m.t. including heating and mixing the aggregate and asphalt by continuous of batch mix plant and hot laid process laying with paver finisher and consolidation with roller as per morth specification to achieve desire density, including cost all materials equipments, tools and plants, oil, kerosene, firewood, labour charges etc. complete using contractor's own machineries batch mix plant and paver finisher etc. complete. plant and paver finisher etc. complete. providing and laying 50 mm thick bituminous macadam with b.t. aggregate as per morth specification and using bitumen emulsion rs-1 as per is 8887: for tack coat @2.50 kg. / 10 sq.m. on bt surface with mechanical sprayer and bulk asphalt vg 30 for mixing @ 34.00 kg./m.t. i.e. 3.40 percentage of total weight of mix including heating and mixing the aggregate and asphalt in continuous of drum mix plant and hot laid process spreading the same by paver finisher and consolidation with roller as per morth specification to achieve desire density, including providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. complete using contractor's own machinery drum mix plant and paver finisher etc. complete. providing & laying bituminous grout 37.5 mm thick compacted with asphalt of vg 30grade @ 1.99 percentage by weight of mix for mixing and 2.5 kg/10 sqm. of rapid curing emulsion for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt premix materials by hot mix process in proper gradation and laying with sensor paver finisher and consolidation work as per most specifications including cost of materials labours labour equipment and plant fuel oil complete.... providing and laying 250mm thick wet mix macadam (w.m.m.) in two layers (each layer of 150mm avearge) using machine crushed black trap aggregate of 40 to 50 mm size in the material with water omc in mechanically mix (pug mill) carriage of mix material by contractor's 1.000 own tipper to site of work including laying, spreading and compacting in sub base, base course on well prepared under base of compacting as per most specification to achieve the desired density (mechanically providing & laying bituminous prime coat asphalt @ 7.5 kg / 10 sqm. of slow curing emulsion as per most specifications including cost of materials labours labour equipment etc. complete..... labour charges for spreading hotmix / drum mix material on scattered area of road by manually in regular shape including surface dressing with wire brush and spreading of sand including cost of sand. complete. (for patch work) labour charges for spreading hotmix / drum mix material by paver finisher including heating and spraying tackcoat as per requirement consolidation by static roller and spraying stone dust as directed etc. complete. providing and laying asphalt painting on b.t. surface with bitumen v.g. 30 at rate of 5 kg./10 sq.mt. and spreading stone dust on painting surface at the rate of 0.03 cu.mt. / 10 sq.mt. in selected length of the road including rolling and cost of asphalt. providing. laying built-up spray grout base course intwo layers with bitumen at rate of 15 kg./per 10 sq.m. with 0.50 cu.m. stone aggregate for first layer and 15kg. of bitumen and 0.50 cu.m. of stone aggregate per 10 sq.μ. of roadsurface for second layer and using 0.13cu.m. of key aggregate per 10 sq.m. excluding rolling and consolidation complete. (stone aggregate and bitumen shall be paid separately) surface dressing two coat with bitumen using 18kg.bitumen per 10.0 sq.m. with 0.15 cu.m. of stone chipping 12mm nominal size per 10.0 sq.m. for first coa

State Government

CTN :45441225 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For gram panchayat ghadoli call for purchasing to all kind of road and building material--- black metal/aggregate 80 mm (incl. gst), black metal/aggregate 60 mm (incl. gst), black metal/aggregate 40 mm (incl. gst), black metal/aggregate 20 mm (incl. gst), murrum (incl. gst), sand (incl. gst), soil compaction, murrum stockpiling, murrum loading, transporting murrum from quarry to road, spreading murrum, compacting murrum using a roller with water, cement (incl. gst), badri/coarse aggregate (incl. gst), iron rod 12 mm (incl. gst), iron rod 10 mm (incl. gst), iron rod 08 mm (incl. gst), iron rod 06 mm (incl. gst), bricks (incl. gst), wire and nails (incl. gst), bituminous pad (incl. gst), 4x5 ft iron board (incl. gst), soil (incl. gst), paver blocks (incl. gst), cement pipe 900 mm (incl. gst), cement pipe 800 mm (incl. gst), cement pipe 600 mm (incl. gst), cement pipe 400 mm (incl. gst), cement pipe 750 mm (incl. gst), iron door frame (incl. gst), window (incl. gst), toilet seat with pan (incl. gst), pvc pipe 110 mm (incl. gst), bitumen pad (incl. gst), asbestos sheet (incl. gst), tiles (incl. gst), septic tank/sludge emptying and disposal (incl. gst), iron angle (incl. gst), profile sheet (incl. gst), j-bolt (incl. gst), centering (incl. gst), jcb (incl. gst), mixer machine (incl. gst), water tanker (incl. gst), road roller (incl. gst), vibrator (incl. gst), barbed wire, tin sheet (incl. gst), cement pipe 300 mm (incl. gst), pvc pipe 90 mm (incl. gst), pvc pipe 75 mm (incl. gst), socket 90/75 mm (incl. gst), bend 90/75 mm (incl. gst), breather/tee 90/75 mm (incl. gst), reducer 90/75 mm (incl. gst) elbow 90/75 mm (incl. gst), tee 90/75 mm (incl. gst), wall complete set 90/75/110 mm (incl. gst), saddle 90/75 mm (incl. gst), ferrule 15 mm (incl. gst), f-t (female threaded) 15 mm (incl. gst), m-t (male threaded) 15 mm (incl. gst), elbow 15 mm (incl. gst), socket 15 mm (incl. gst), tap 15 mm (incl. gst), solution 100 ml (incl. gst), gi pipe 1-inch (incl. gst), ci tap (incl. gst), stepladder (incl. gst), upvc pipe (incl. gst), funnel (incl. gst), table (incl. gst), chair (incl. gst), clock (incl. gst), polythene (incl. gst), tiles (incl. gst), birla white, asian paint (incl. gst), turpentine oil (incl. gst), crushed stone/aggregate (incl. gst), tractor with trolley (incl. gst), pvc drum / steel window, water-based paint, projector, brother printer, hp laptop, hp computer, cfl bulb 23 watt, holder, wire 1x18, mercury light, led light, solar lights, garbage collection vehicle (bell vehicle), precast urinal, water can, sanitary napkin disposal machine, ajax concrete machine, water connection meter, jointed garbage bin, sanitary pad making machine, water pouch, solar unit, battery-operated garbage collection vehicle, cement benches, steel benches, inverter, refrigerator, a.c. air cooler, table, chairs, cupboard/almirah, green mat, boys' uniforms, girls' uniforms, delivery table mattress (5x3 ft), bed mattress (6x3 ft), office cupboard, office table, suction machine, baby weighing scale, adult weighing scale, height measuring scale, water filter, gas stove and cylinder, iron bed, microphone and loudspeaker, gas stove and cylinder, iron bed, ro water purifier, whiteboard, office chairs, precast compound wall (1 meter)

CTN :45417262 Due date: 10 Jun, 202610 Jun, 2026 NA
Tender For procurement of goods, equipment terrestrial lidar with integrated automatic total station 1" (arc seconds) angular accuracy , resistivity imaging system for 2d electrical resistivity survey , automatic weather station , thermal infrared camera , portable air quality monitoring system , walkie-talkie communication , flexural strength test of tiles , abrasion test of tiles , aggregate polishing , desiccator (vacuum) , motor (5hp, 3hp, 2hp, 1hp, 0.50 hp) , -accelerometer set of 5 with different frequencies , compressometer-extensometer for concrete specimen , concrete surface-mount strain gauge system , compaction factor apparatus , portable digital microscope system , portable density meter , axle pad weighing system , temperature controlled water bath , gyratory compactor for asphalt specimens , normal refrigerator , environmental climate chamber , contact angle meter , bitumen emulsion charge detection instrument , drainage and seepage tank (visualisation of seepage flow) , symons rain gauge , digital rain gage , rainfall event logger , digital evaporation recorder , eco sounder , universal water current meter with direction indicator , vibratory hammer , concrete specimen cutter , accelerated curing tank , compressor with nozzle , double distillation assembly , indian standard sieves (200 mm diameter) , indian standard sieves (300 mm diameter) , indian standard sieves (450 mm diameter) , sieve shaker mechanical tapping motion , oven , digital weighing balance (15 kg) , digital weighing balance (30 kg) , digital weighing balance (220 g) , cone penetration apparatus determines the liquid limit of soils , shrinkage limit apparatus , density bottle , compaction moulds (light and heavy both) , compaction hammer (light and heavy both) , loading frame mechanised for soil and material testing applications, including unconfined compression (uc), cbr, and similar tests-50kn universal frame. , loading frame manual , proving ring: 2kn, 10kn, 25kn, 50kn, 100kn. , dial gauge: 0.002x5mm, 0.01x25mm-3 nos each in 1 set. , pvc drum (barrel) , measuring cylinder (borosilicate) , measuring cylinder (borosilicate) , measuring cylinder (borosilicate) , measuring cylinder (borosilicate) , rubber glove , stop watch , spatula , glass plate , glass plate , glass plate , air tight container , air tight container , steel ruler , steel ruler , borosilicate beaker , borosilicate beaker , borosilicate beaker , measuring jar (plastic) , measuring jar (plastic) , non-return valve, air valve , m.s flange , lubricating oil , lead , spum yarn , water meter , pvc bend , pvc y branch , pvc dod bend , pvc pipe sloc , c.p piller tap , c.p waste coupling , pvc waste pipe , pvc connection flexible tube , ppr pipe fittings , pvc floor trap , pvc gully trap , pvc multi trap , pvc multi floor trap , white cement , pop (plaster of paris) , push cock , plastic water tank , water tank overflow alarm , butane/propane disposable cylinder , scaffolding pipes: , shuttering plywood sheets , plastic brick mould. 9"x4.5"x3" , mould and concrete spacers plastic i shaped dumbell paver mould 60mm , plastic zigzag paver mould , plastic cosmic paver block mould , pvc mold for cement cover block multi cover (20/25/40/50mm-42 kvt without hole) , pvc mold for cement cover block multi cover (20/25/40/50mm -25 kvt with hole) , ms h-beams: 100 100 length 1 m , ms h-beams: 100x100 length 2 m , ms h-beams: 100 100 length 3 m , ms h-beams: 150x150 length 1 m , tie rods: 2 m , tie rods: 3 m , formwork clamps/clips: , shuttering oil/release agent: , polythene sheets , adjustable column clamp , adjustable concrete beam formwork clamp , adjustable concrete beam formwork clamp , corner angles for formwork: , safety belts and harnesses: , flagging reflective tape: , scaffolding safety tags and tag holders , safety gloves , safety jacket , safety helmets , safety boots

CTN :45388009 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For supply of empty drum bitumen vg-30/ nrmb , empty drum bitumen emulsion rs1

State Government

CTN :45366408 Due date: 05 Jun, 202605 Jun, 2026 53.8 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of nizar and kukarmunda taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (pave

State Government

CTN :45366425 Due date: 05 Jun, 202605 Jun, 2026 51.1 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, o kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including mecessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for took of of the roto of 3 elg/10cgmonducing bitume , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot / drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. , necessary firewoood, oil, lubricants, labour charges etc

State Government

CTN :45366438 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of ukai taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, a kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver , finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant. machineries and eginment , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq

State Government

CTN :45366446 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of songadh taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene abour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including tolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oi ubricants, labour charges, using contractor's own drum mix olant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual _aying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oi ubricants labour charges using contractor's own drum mix , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing ag

State Government

CTN :45366458 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
 Loading, Please wait...

Connect us via What's Up