Web Analytics Made Easy - StatCounter

Isolation Valve Tenders

Get complete information related to latest Isolation Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Isolation Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Isolation Valve Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44802651 Due date: 23 Apr, 202623 Apr, 2026 NA
Tender For providing of custom bid for services - hiring services for installation of isolation valves and spectacle blinds in sub headers of main nitrogen header line

Central Government/Public Sector

CTN :44822272 Due date: 20 Apr, 202620 Apr, 2026 NA
Tender For supply of cylinder isolation valve part no. kokr006100204

State Government

CTN :44812470 Due date: 30 Apr, 202630 Apr, 2026 NA
Tender For procurement of isolation valves/ globe valves, transmitter manifolds for forthcoming unit-8 aoh, cstps, chandrapur.

CTN :44705138 Due date: 15 Apr, 202615 Apr, 2026 NA
Tender For corrigendum : biennial rate contract for supply of forbes marshall spares installed at various nspcl stations - dual seismic vibr.monitor, make:shinkawa, ramp diff.exp.monit:vm5n9101100010010020, hpt rotor expansion cable, fw-263fa-80, velocity sensor,model no cv-861,shinkawa, casing expans ipc:extn.cable:lw-010b-s-0, relay o/p module;shinkawa(vm-5y1-02), shaft vib direct, fl-202f08a-m2-00-03-10, vibratn monitr:dual seismic,0-50mm,vm-5u, sensor rotor hpt,fl-263f50a-m1-00-04-10, hp rotr exp:driver for hpt,fk-263f-6-3-1, ecs(8 mm)for a/s model:fl-202 f08a-m2-0, 4m ext.cable tsi a/smodel: fw-202fa-40, driver for 5m cable a/s model: fk-202f1, loop pwr vib sensor, extension cable 10 mtr ss, forbe marshal:ui-20n actuator repair kit, forbe marshal:ui-30n actuator repair kit, electronic card:48v power supply, electronic crd:pwr sply pcb for dcem2100, electronic card:fmdcem21xx baseboard pcb, electronic card:fmdcem21xx, ddu keypad, blower unit:air purge assy m4x12pan head, transreceiver:assy with 10m cable, eddy curnt. sensr,fl-202f08r-m2-00-03-10, eddy curnt. sensr,fl-202f08l-m2-00-03-10, velocity sensor: cbv160; shinkawa, 5 mtr detachable cable for cbv-160, ph analyser:ph sensor, sp.cond.meter:sp. cond. sensor for swas, 10 mtr extension cable for cv 861 sensor, cable:exten cable l=5 m for cv 861sensor, pwr supply unit,for vms,model no.vm-5z1,, shaft vib rev,fl-202f08r-m2-r5-03-10, proximtr:tsi mod:driver:fk-202f2-1-1/z07, extension cable 8 meter, fl-202fl-80, displacement sensor direct mount type, hp rtr expn:senr 1m cbl-vl-263p50a-1002, proximtr:electr modu:driver:vk-263p4/sys, extension cable 8 meter, vw-263pa-8, non/c eddy currnt sensr(vl-143p25a-1002), driver for ramp diffl expn (lpt)shinkava, extn cable 8 meter for lpt diff expn, axial shift sensr,fl-452f11a-m1-00-03-10, axial shift:driver :model: fk-452f-2-1-1, ext.cable for axial shift,fw-452fa-80, casing expansion hpc:lvdt for casing exp, 4ch. monitor module vm-7 tsi mod:vm-701, power supply:p.s.card:vm751,shinkawa, host communication module model:vm-742, absolute vibrn.monitor: vm-702; shinkawa, hpc:signal conditioner overall exp lvdt, coolers:sample cooler part no. dhx-3, coolant flow indicator p/n. f4w2011550, coolant isolation valve p/n. f4w2011521, ph cell for swas ;part no.- fm1104, cation conductivity cell; k=.01;fm8310, specific conductivity sensor;p/n fm8311, extension cable:tss ext cable 10 mtr, driver for axial shift,fk-452f-2-3-1, ext cable for vibration mod:fw-202fa-80, ele modul:shaft vib driver,fk-202f-2-3-1, proximtr:proximity driver fk-202f-1, forbes marshall:8 ch relay module, local unit:solenoid coil with block, lens:lens assy.for dcem2100, remote control unit:key pad, loop powered vib sensor for ct fan, eccentricity & speed module vm-703b, digital vib ind-ct fan vms, power supply unit,, local communication module with phase marker, communication gateway module, vibration & thrust four channel monitor, tachometer module, 18 ch relay module, key phasor:phase mark sensor with cable, communication module:communication modul

CTN :44487558 Due date: 16 Apr, 202616 Apr, 2026 NA
Tender For supply of sluice valve - purchase of sluice valve non-raising spindle note : 1)manufacturers/authorized dealers only eligible to participate in e-tender. 2) valid dealership certificate should be submitted along with e-tender. 3) hydraulic test certificate and warranty certificate should be submitted along with supply of valves.

CTN :44795505 Due date: 15 Apr, 202615 Apr, 2026 36.57 Lacs
Tender For supplying and erection of isolation valve at rising main , make provision of reverse tap to motor bearing cooling system and manufacturing and erection of emergency gate hoist to gravity main gate and allied work at andhali lift irrigation scheme

CTN :44799097 Due date: 22 Apr, 202622 Apr, 2026 NA
Tender For annual rate contract for procurement of isolation valve 1 inch, isolation valve half inch and half inch appliance valve

Central Government/Public Sector

CTN :44719633 Due date: 22 Apr, 202622 Apr, 2026 NA
Tender For corrigendum : providing of custom bid for services - hiring services for mounting / dismounting, repair, testing & calibration of safety valves, isolation valves & fire water sprinklers at ongc dahej plant for three years

Central Government/Public Sector

CTN :44715987 Due date: 09 Apr, 202609 Apr, 2026 NA
Tender For various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed by o.a. , overhauling of valves up to d

Central Government/Public Sector

CTN :44698679 Due date: 09 Apr, 202609 Apr, 2026 1.39 Crore
Tender For providing of custom bid for services - various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipeline water drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed
 Loading, Please wait...

Connect us via What's Up