Get complete information related to latest Kelly Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Kelly Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Kelly Valve Tenders.
Tender For supply of cylinders for co2 gas: is 7285 (part-ii)2008. new empty industrial co2 cylinder 46. 7 ltrs water capacity with valve and guard. [ warranty period: 30 months after the date of delivery ]
Tender For supply and transportation of co2 gas type portable fire extinguisher 4.5 kg capacity with m ounting stand conforming is. 15683-2018 (first rev.) with isi marks. the fire extinguisher should be compl ying with (1) isi mark & cce approved new seamless gas cylinder as per is :7285 ( part 1&2) -2004 (third rev.). (2) isi marked wheel valve as per is 3224-2002 ( third rev.) amendment no. 2 of january 2009. ( 3) discharge rubber hose wire braided 10mm dia horn and (4) fully charged with co2 gas conforming is-3 07-1966 (second rev.) make:- amtex or similar. safety circular no.2015/sig/a/fire/pt. dt.09.09.2015 [ wa rranty period: 30 months after the date of delivery ]
Tender For supply of 16904 - disposable ventilator circuit tubings - double ended - bain circuit.1) type of circuit - bain circuit -for mechanical, spontaneously breathing patientsusage -adults 2)usable for spontaneous and controlled ventilation - yes 3)sterility -sterile 4)utility -single use- disposable 5)m ethod of sterilization - eto 6)autoclavable - no 7)shelf life(years) -5 yrs. functional 1)delivery of an aesthic gases and vapours - yes 2)oxygenation of the patient -yes 3)co2 elimination -yes constructi on minimum dead space and low resistance to flow -yes, reservoir bag -available reservoir bag type - spring loaded valve,parallel entry of fresh gas line at the patient connection -yes, fgf required flow ra te to prevent rebreathing ( ltr/min) -7, fgf tube runs coaxially inside the outer transparent corrugated tubing - yes, fixed elbow and luer lock port for safe monitoring at the patient end - no, expiratory valv e at the patient end- no, double swivel elbow elastomeric cap at patient end -yes, accurate and adjust able pressure limiting valve with safety feature -yes, pressure adjustment range of pressure limiting v alve (kg/cm2) -1, suitable adaptors to connect to various parts of breathing system, flow meter etc -ye s, dimensions corrugated tube id(mm) - 22,corrugated tube length (mm)-1600,fresh gas flow tube dia (mm) -22,fresh gas flow tube length (mm) -1600,reservoir bag size to allow respiratory monitorin g and/or assistance(ml)- 2000 milliliter. material material of tubes ( light weight, medical grade, non -toxic, latex free),pvc light weight, medical grade, non-toxic, latex free,kink resistant fgf tube-yes, material of the reservoir bag -latex free. packing type of packing- single, individually packed in soft wrap . ]
Tender For corrigendum : supply of co2 gas with services for ntpc kudgi - m1060320608-gas chem carbon dioxide 99.8 percentage 25-35kg , replacement of cylinder valve , replacement of cap lost or damaged , replacement of hand wheel of the valve , replacement of gland nut of the valve , hydraulic test and painting , drilling out damaged spindle and refit
Tender For supply of co2 type fire extinguisher fully charged having capacity of 02 kg, along with valve duly teste d isi marked swivel discharge bend & elect. non conducting horn confirming to is 2878 & clw specn no.c lw/ms/3/016 alt-2 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : annual maintenance contract for repair and maintenance of fire fighting equipment at erpl, rajbandh - amc for repair and maintenance of f&s eq, carrying out maintenance and inspection of fire extinguishers on monthly basis including pastings/ marking of maintenance date, clea ning, condition of threads of caps, discharge tubes, sharpness of piercing pin and cylinder body, replacement of defective parts ( iocl supplied), measuring weight and charges for labour, including oiling, greasing, testing as per direction of eic inclusive of al l tools &tackles, consumables, transportation, labour charges etc and measuring instruments for the same as directed by the eic/ si te engineer and submitting the reports of the inspection as per hse manual format (payment of spares not supplied by iocl shall be m ade as per respective items), for 10/9 kg. capacity dcp extinguisher, for 75/70/50 kg. capacity dcp extinguisher, for 4.5 kg. capacity co2 extinguisher, for 6.5 kg. capacity co2 extinguisher, for 2 kg capacity clean agent extinguisher, monthly: checking, inspection, maintenance, greasing, cleaning, oiling, replacement of disc washer, blank cap if any including compl ete overhauling etc. of double headed hydrant valves alongwith all tools, tackles, manpower, material etc. payment for disc washer, coupling washer & blank cap shall be made separately., supplying and fitting of hydrant disc washer as per directions of engineer-in-charge, supplying and fitting of fire hydrant/ fire hose coupling washer, supply and fitting of blank cap (as per is 5290 , red colour with gi chain) suitable for 63 mm hydrant outlet as per direction of ei c, supplying & fitting spindle assembly (gunmetal), repair of adaptor lug of hydrant/ hose inclusive of tools tackels & labour etc., monthly maintenance of 750 gpm monitors: oiling & greasing through grease nipple provided on bearing, worm wheel and worm shaft, cle aning, performance checking for complete vertical and horizontal movement, nozzle movement, water throw, foam suction, ensuring prop er tightning of flanges, clearing the debris around the nozzle etc as per approved procedure including tools & tackles, report submi ssion complete as per direction of site engineer / eic. water resistant low friction synthetic grease, grease gun and all other cons umable etc shall be arranged by vendor. after testing, afff jerry-can must be positioned and replinished near monitor including shif ting, transportation etc., cleaning, maintenance and repair of water cum foam monitor nozzle for fog jet operation by opening and dismantling of nozzle cleanin g by rustoline or kerosene of all the components thoroughly, further inspection of internal parts in the presence of the engineer-in -charge, repair/reconditioning by hand facing, machining, grinding, lapping, etc. and greasing,& reassembly in foam monitors as per direction of eic inclusive of necessary tools, tackles and labour., opening of blind flange of water curtain system of control building, sr tank cleaning of water line, dechoking of spray nozzles, ref ixing it with after testing with new gasket.etc of water spray system of all buildings (on monthly basis) including nozzle dechoking , strainer cleaning and all labour, tools & tackles complete as per direction of the site engineer/ eic. (rates per blind opening), valve maintenance : checking, inspection, greasing, cleaning, oiling etc. of all fire water valves, of all sizes upto 14" including grease and all labour, tools & tackles complete as per direction of site engineer / eic and provided by contractor. all such valves shall be fully closed and opened and restored in origional condition as per advise by eic/ site engineer.note: the valve sizes may vary from 3" to 14". rates are per valve., hydrotesting of fire fighting delivery hose of dia 63 mm on half-yearly basis (type a and b ) by making arrangement of hydraulic pum p, blind, shifting from plant area, bui