Get complete information related to latest Knuckle Arm Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Knuckle Arm Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Knuckle Arm Tenders.
Tender For lwscz shell kit (a) lscz - one coach set of roof, 2 mm sidewall and end wall for lwscz coaches. 1) sidewall assembly to drg.no. (329) icf/sk3-1-4-091, alt 'b' , col- 1 - 1 no. 2) roof assembly to drg.no. (lwscz) 73916001, alt 'd', col-i - 1 no. 3) end roof assembly to drg.no.(ls) 58116066, alt 'h', col-i - 2 nos. welding pin to drg no 81410012 alt nil to be assembled on roof and sidewall 4) endwall to drg.no. (lslrd) 74115001, alt 'j'-2 nos. the firm shall fulfil the requirement as per icf//md/specn.200, issue status 01, rev 04 with amendment no. 01. the firm shall fulfil the requirement as per icf/md/spec-315, issue status-01, rev.00, amendment no. 01. firm has to supply roof and sidewall without applying etch primer. (b)one coach set of body shell items and partition frames for lwscz2(814) coaches to drg nos, 1. 81410002, alt nil- 1no. 2. 81410005, alt 'e'- 1 no. 3. 58210036, alt 'b'- 2 nos. 4. 67010011, alt 'a'- 2 nos. 5. 58110017, alt 'c'- 2 nos. 6. aag10457, alt nil- 4 nos. 7. aab10338, alt nil-16 nos. 8. 58110015, alt 'a'- 6 nos. 9. 58110016, alt 'a'-3 nos. (c) under frame arrangemnt to drg no. 81411001 alt 'f' the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". c) packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer side down. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly& welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor withcross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : shell kit for memu dmc2 jk 946 a. roof assembly 94416001 000 01, alt 'nil' - 1 no. location of sidewall 94414001 000 01, alt 'nil' - 1 no. end construction pail end 94615001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status 01, rev.0 0with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu dmc2 jk 946 to drawing nos: 1. 94410003 000 01, alt 'a' - 1 no 2. 74510257 000 01, alt 'nil' - 1 no 3. 94410004 000 01, alt 'nil' - 1 no 4. 74510045 000 01, alt 'nil' - 1 no 5. 94410005 000 01, alt 'nil' - 1 no 6. 94410002 000 01, alt 'b' - 1 no. 7. 94410076 000 01, alt 'nil' - 1 no 8. 94410072 000 01, alt 'nil' - 1 no 9. 94410054 000 01, alt 'nil' - 2 nos. c. under frame arrangement 94411001 000 01, alt 'a' - 1no. firm shall fulfill the manufacturing facility as per icf/md/specn-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : supply of cross bearer to rcf drg. no. se13114, alt. a. material and specification as per drawing.[ warranty period: 30 months after the date of delivery ]
Tender For supply of under frame arrgt for memu/ndmc2/3ph to drg no. 78211001, alt 'a', col 1. firm shall fulfil the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : special care to be taken for under slung items while transit, loading and unloading. the underframe should be supplied as normal side up and side bearer side down. packing to drg no. icf/j&t/misc-2487,alt-'b'. details for satge inspection. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weldparameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For supply of underframe arrgt for motor coach with bt elec to drg no (574)icf/mrvc/m/bt-1-1-001, col.i, alt 'm' the schedule of technical requirement asper icf/md/specn.147, issue status-01, rev-02 with amendment-02. special condition : 1) the underframe should be supplied as normal side up and side bearer side down. packing drawing icfj&t/misc-2487, alt 'b'. stage inspection detail added. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]