Web Analytics Made Easy - StatCounter

Kotha Stone Flooring Tenders

Get complete information related to latest Kotha Stone Flooring Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Kotha Stone Flooring Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Kotha Stone Flooring Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45651226 Due date: 30 Jun, 202630 Jun, 2026 8.04 Lacs
Tender For providing and laying kota stone flooring on terrace of jal sadan building under ee(c)-34 division.

Central Government/Public Sector

CTN :45644973 Due date: 13 Jul, 202613 Jul, 2026 1.34 Lacs
Tender For tender for supplying and laying of kota stone flooring at iim tiruchirappalli

State Government

CTN :45642759 Due date: 08 Jul, 202608 Jul, 2026 50.32 Lacs
Tender For tender for providing and laying in position cement concrete , kota stone 25 mm thick , kota stone slabs 20 mm thick in risers of steps, skirting , providing and applying white cement based putty of average thickness 1 mm , removing dry or oil bound distemper , distempering with 1st quality acrylic distemper , dismantling steel work in built up sections , demolishing brick work , dismantling stone slab flooring laid in cement mortar , demolishing cement concrete manually , providing and fixing 18 mm thick gang saw cut, mirror polished , 12 mm cement plaster , 15 mm cement plaster , providing and fixing fly proof stainless steel grade 304 wire gauge , providing and fixing glazing in aluminium door, window, ventilator shutters , providing and fixing double scaffolding system , painting with synthetic enamel paint of approved brand and manufacture , providing and fixing toughend glass partition 12mm clear glass , providing and fixing roller blind , dismantling washed stone grit plaster , providing and placing in position of pine workbenches , providing and placing in position desktop table , providing and placing in position esd workstation , providing and placing in position storage unit , providing and placing in position bag storage rack , providing and placing in position project display rack , tender for esd stools , wiring for light point , wiring for circuit , supplying and fixing modular socket outlet and switch connections , supplying and fixing a module switch , supplying and fixing modular socket outlet , tender for pvc insulated xlpe aluminium conductor armourd cable , laying of one number pvc insulated and pvc sheathed , supplying and making end termination , pipe earth electrode , providing and fixing g.i. strip , emergency light illuminated signages illuminated signages , providing and fixing 6 swg dia g.i. wire on surface or in recess , tender for ul listed cpri tested , installation of 4 mtr long with help of bocky 17.0 mm , supplying and fixing 16 way, double door , supplying and fixing of 12 way double door , providing and fixing 100 a, 16 ka,tpmccb , supplying and fixing 5 a to 32 a rating single pole , supplying and fixing 5 a to 32 a rating double pole pole , supplying and fixing 5 a to 32 a rating triple pole , supplying and fixing suitable size gi box 3 pin 5 a , supplying and fixing dp sheet steel enclosure on surface , supplying and fixing tp sheet steel enclosure on surface , sitc 100watt ip 66 green perform prime is a efficiacy of 160 lmw , revolving chair (v5) (q2) , executive table (v4) (q2) , modular table / meeting table / centre table (v2) (q2) //bid details 2 / 54

Central Government/Public Sector

CTN :45366634 Due date: 29 Jun, 202629 Jun, 2026 25.00 Lacs
Tender For corrigendum : repair to sunken flooring, plumbing with connected items to otm accn in aor of age b/r-ii of ge (east) ferozepur cantt - demolition of un-reinforced cement concrete in any position, complete all as specified and directed., m&l for cement concrete (1:5:10) type e-2 using 40 mm graded stone aggregate as in filling in sunkan slab or as in sub base, mass concrete, complete all as specified and directed., m&l for 15 mm thick rendering over concrete surface of sunken floor in cm 1:3 on wall as well as sunken floor finished even and smooth without using extra cement using wpc complete all as specified and directed.(wpc measured and paid separetely), m&l for water proofing treatment to rcc sunken floor including wall comprising with the following course of treatment/ specifications form bottom to top:-(a) applying evenly a tack coat of industrial bitumen 85/25 @ 1.6 kg per sqm over a coat of bitumen primer @ 0.40 ltr per sqm including preparation of roof surfaces complete all as specified and as directed.(b) app based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application complete all as specified.note: (i) laying of app based membranes shall be done by torch on method or as per manufacturers instructions.(ii) a minimum overlap shall be not to be less than 150mm of polymeric membranes and sealed all overlaps and joints as manufacturers instructions.(iii) all ci/pvc traps in sunken slabs to be enclosed with pcc 1:1.5:3(min 15 cm) all round., supply only integral water proofing compound, complete all as specified and directed., taking down cement plaster on brick walls of any description including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed, m&l for rendering 15 mm thick in cement mortar (1:4) on any face of brick walls or concrete surfaces, finished fair and even including wpc,preparation of new plastered or unplastered surfaces and applying two coats of cement based paint over a coat of chalk white primer on walls complete all as specified and directed. (wpc measured and paid separately), m&l for preparing old surfaces plastered or unplastered of walls, cornices, pillars etc including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coats of cement based paint complete all as specified and directed., m&l for rendering 15 mm thick in cement mortar (1:6) on any face of brick walls or concrete surfaces, finished fair and smooth without using extra cement complete all as specified including preparation of new surfaces of wall and applying two coats of oil bound distemper on walls including corneces, pillars etc complete all as specified & directed., m&l for preparation of old decorated surface of wall and applying one coat of oil emulsion distemper, complete all as specified and directed., m&l for rendering 5 mm thick on ceiling surfaces in cement mortar (1:3) finished even & smooth without using extra cement including preparation of new plastered or unplastered surfaces and applying two coats of white wash on ceilings, complete all as specified and directed., m&l for preparing old surfaces plastered or unplastered of ceiling, cornices, pillars etc including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of lime wash (white washing), complete all as specified and directed., resecuring or eashing & adjusting, without taking down of shutters of any description of exc. 1 sqm but n.exc. 2 sqm each complete all as specified & directed., taking down chowkhats or frames with shutters (without taking off shutters from the frames) of size not exceeding 1.50 square metre each including cut

corporations/Associations/Others

CTN :45625891 Due date: 04 Jul, 202604 Jul, 2026 NA
Tender For annual rate contract for construction work with materials and labour for mahudha nagarpalika area. - box cutting the road surface to proper slope and camber for making a base for road work including removing the excavated stuff and depositing on the road side slope as directed upto 50 m., excavation for foundation up to 1.5 meter depth including sorting out and stacking of useful materials and disposing of excavated stuff up to 50 meter lead (a) for loose or soft soil, filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering, filling in foundation and plinth with murrum or selected soil in layers of 20 cm thickness including watering, ramming and consolidating etc. complete., providing and laying cement concrete 1:3:6 (1 cement : 3-coarse sand :6- hand broken stone aggregate 40 mm. nominal size) and curing complete excluding cost of form work in :(a) foundation and plinth, providing and laying compacted w.b.m. 100 mm. thick of grading-i b.t. metal of size 45 mm to 90 mm in two layers including using 22 percentage stone screening 13.2 mm size and percentage stone dust as filler including spreading, watering and consolidation by vibratory roller etc. complete., providing and laying compacted w.b.m. 150 mm. thick of grading-ii b.t. metal of size 45 mm to 63 mm in two layers including using 13 percentage stone screening 13.2 mm size and 7 percentage stone dust as filler including spreading, watering and consolidation by vibratory roller etc. complete., providing laying controlled cement concrete m-200 and curing complete including the cost of form work and excluding cost of reinforcement for reinforced concrete work in : rcc lintels, providing laying controlled cement concrete m-250 and curing complete including the cost of form work and excluding cost of reinforcement for reinforced concrete work in : rcc slabs & landings, providing and casting in situ ordinary cement concrete m-200 forkerbs/kerb blocks including formwork, curing and finishing complete. (upto 10 ton), providing and casting in situ controlled cement concrete m-200 for average 100 mm thick wearing coat laid as directed dincluding tamping, vibrating, finishing, curing and fillingin joints with bitumen complete (upto 10 ton), providing tmt bar fe 500/500d reinforcement for r.c.c. work including bending, binding and placing in position complete upto floor two level (upto 10 ton), white stone bela masonry block in course in foundation, plinth & super structure with stone of approved quality in cement mortar 1:5 (1cement : 5 course sand) including racking the joints etc. complete., white stone bela masonry work in partition walls up to 15 cm thickness in cement mortar 1 : 4 course sand), providing 15 mm thick cement plaster in single coat on fair side brick/concrete walls for interior plastering up to floor two level and finished even and smooth including finishing with a floating coat of neat cement slurry. (ii) cement mortar 1:4 ( 1 cement : 4 sand), providing 10 mm thick cement plaster in single coat on ceiling and soffit of stair for interior plastering up to floor two level and finished even and smooth including finishing with a floating coat of neat cement slurry for plastering on ceiling and soffits of stairs up to floor two level instead of plastering on walls. (ii) cement mortar 1:4 ( 1 cement : 4 sand), 20 mm thick sand faced cement plaster on walls upto height 10 meters above ground level consisting of 12 mm thick backing coat of c.m. 1:3 (1:cement - 3:sand) and 8 mm thick finishing coat of c.m. 1:1 (1:cement - 1:sand) etc. complete, providing and laying white glazed tiles of 6 mm thick in flooring, treads of steps and landing laid on a bed of 12 mm thick cement mortar 1:3 (1:cement - 3-coarse sand) finished with flush pointing in white cement., providing and laying white glazed tiles of 6 mm thick in skirting of

CTN :45622189 Due date: 25 Jun, 202625 Jun, 2026 12.40 Lacs
Tender For gsss meghasar - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spir

CTN :45622194 Due date: 25 Jun, 202625 Jun, 2026 12.40 Lacs
Tender For gsss kesardesar jatan - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases

CTN :45622197 Due date: 25 Jun, 202625 Jun, 2026 12.40 Lacs
Tender For gsss bijeri - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral

CTN :45622199 Due date: 25 Jun, 202625 Jun, 2026 34.59 Lacs
Tender For civil work in gsss 4 bgm - part-a (building work) based on bsr pwd - 2022, bikaner, earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils, providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix add extra for providing richer mixes respectively at all floor levels providing m-25 grade concrete by using cement as per codal provision instead of m-20 grade design mix., centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc., brick masonry with f.p.s. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1 : 6 (1 cement : 6 coarse sand)add extra over item of brick work with class designation 100 in substitution of class designation 75 :quantity in cum., providing and laying in position specified grade of cement concrete for all rcc structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. m20 grade nominal mix / design mix, filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift., supply & stacking good soil of earth at site complete including loading unloading & transportation etc and filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.good soil of earth, brick work with mechanised autoclaved flyash lime bricks conforming to is: 12894 :2002 of class designation 100 in superstructure above plinth level upto floor v level in. cement mortar 1 : 6 (1 cement : 6 coarse sand), dry brick on edge flooring in required pattern with bricks of class designation 75 on a bed of 12 mm mud mortar including filling joints with river sand complete., providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)., providing and laying in position specified grade of cement concrete for rcc structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for beams, suspended floors, roofs, griders having slopes up to 15 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircas

Corporations And Associations And Others

CTN :45563054 Due date: 30 Jun, 202630 Jun, 2026 NA
Tender For e-tender for civil contract jobs - civil contract job:, earth filling under floors with surplus ordinary soil or soil containing gravel or kankar, including ramming, watering and consolidated lead., first class burnt brick work laid in cement sand mortar 1:7 in foundation and plinth, laying 80 mm thick factory made cement conc. inter locking paver bricks after m-40 grade made by block making machine with string vibratory compaction ordinary gray color & pattern over 50 mm thick compacted bed of coarse sand filling the joint with fine sand, complete in all respect ., dismantling brick of flagged stone flooring including concrete base, dismantling concrete plain 1:2:4 mix, cement concrete 1:2:4 with stone ballast or shingle, a. mixing by manual mean, b. mixing by mechanically mean using concrete mixer, laying of dry brick ballast 40mm gauge for flooring, civil work (rate to quoted on csr rates)
 Loading, Please wait...

Connect us via What's Up