Get complete information related to latest Landfill Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Landfill Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Landfill Work Tenders.
Tender For corrigendum : supply of education kit---earth work in rough excavation by mechanical means hydraulic excavator manual means in mass excavation in all types of soil to all depths, backfilling, pcc, filling by brought out earth, rcc foundations, rcc wall, steel reinforcement, shuttering raft, shuttering walls, brick masonry, cement plaster, neat cement punning, removal of wet sludge
Tender For corrigendum : supply of sitc of 24 core single mode armoured optical fiber cable , sitc of 12 core single mode armoured optical fiber cable , sitcof 50 pair jelly filled outdoor telephone cable , sitc of 20 pair jelly filled outdoor telephone cable , sitc of 15u wall mount networking rack with all accessories , sitc of 24 port rack mount liu fully loaded with sc to sc couplers , sitc of 12 port rack mount liu fully loaded with sc to sc couplers , sitc of 100 pair plus 100 pair main distribution box , sitc of 50 pair plus 50 pair main distribution box , sitc of hdpe pipe size 40mm , sitc of gi pipe size 65mm , sitc of sc to lc single mode 3mtr fiber patch cord , sitc of sc to lc single mode 1mtr fiber patch cord , sitc of cat6 utp cable 305mtr roll , sitc of cat6 patch cord 3mtr , sitc of cat6 patch cord 1mtr , sitc of mdf with internal pipe for entry of cables cable glands , sitc rcc chambers with precast rcc cover with lifting hooks , sitc of joint enclosure for 24 core ofc jointing work , sitc of joint enclosure for 12 core ofc jointing work , laying clamping of 24 core and 12 core ofc in duct , laying clamping of 50 pair and 20 pair telephone cable , sitc of cable route markers as per specifications , digging of soft soil and backfilling as per original site condition , digging of hard concrete surface road crossing and refilling , machine horizontal directional drilling hdd for crossing hard surface , otdr report and power meter testing , supply design and provide auto cad as built drawing
Tender For construction work of intake structure, trash rack , earth murum backfilling behind counterfort wall, protection wall and beautification of pump house premises, control room, metering room, road diversion, construction of earth retaining wall for darg
Tender For -custom bid for services - tender for attending fire water, raw water and other ug line leakages at mrpl aromatic complex as per boq (bidder has to quote lumpsum price higher or lower than the sor value excluding gst as per boq).-1 1050799 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 0 to 1.5 m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, . all complete as per standard specifications and diretction of engineer incharge, 2 1050800 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 1.5m to 3.0m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge, 3 1050801 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 3.0m to 4.5m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge. 4 1050802 backfilling and compacting the soil in layers of 300mm after execution of the work to proper grade and level with selected materials from available excavated soil from soil heaps within a lead of 2.00km, including re- excavating the deposited soil excavated earlier, breaking clods, loading, transportation, unloading, spreading to required level, watering, rolling and ramming by manual methods/ mechanical compactors, dressing, trimming etc. with all tools & tackles, machinaries, labour etc complete as per standard specifications and diretction of engineer incharge. 5 1050803 transporting & disposal of the surplus earth and excavated material including shrubs and vegetations from construction area to maximum lead of 2.0 km including reexcavating the deposited soil excavated earlier, loading, transportation, unloading, laying at all depths and heights, stacking, leveling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes all complete as per standard specifications and diretction of engineer incharge.(the work volume of surplus material shall be measured as the difference of volume of excavation & the volume of back filling.), 6 1050804 pumping out water including dewatering the water mixed with muck/sludge etc from the trenches, ponds and other miscellaneous areas including supply and installation of dewatering pumps by contractor with all labour, hoses, consumables fuel etc.complete as per the directions of engineer incha