Web Analytics Made Easy - StatCounter

Laptop Computer Scrap Tenders

Get complete information related to latest Laptop Computer Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Laptop Computer Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Laptop Computer Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40937307 Due date: 05 Aug, 202505 Aug, 2025 NA
Tender For corrigendum : supply of special energy meters (sem) , data collection device (dcd) for sem , software for meter data reading & data downloading from dcd

Central Government And Public Sector

CTN :41118393 Due date: 28 Jul, 202528 Jul, 2025 NA
Tender For supply of electronic toe load measuring device as per rdso specification no tm/sm/etlmd/218 (fourth revision - 2022 or latest date effect from 01.06.2022). technical data: 1. capacity of load cell - : 2000k.g, 2. type of load cell -: stainless steel, 3. accuracy -: + 20k.g, 4. operating voltage -: 5.5v to 5.6 5v, 5. resolution -: 1.0k.g, 6. display -: 16-character alpha numeric lcd display, 7. sensitivity -: fast return to zero, 8. calibration -: micro controller based auto calibration. introduction: - electronic toe load meas uring device is an efficient tool in the hands of permanent way engineers to determine the actual toe load of any elastic rail clip. this unit gives direct reading of the toe load in terms of kilograms on its alphanume ric lcd display. the whole unit is safe to handle, compact, rugged, and its light weight is an additional adv antage over its mechanical counterpart. the device is provided with a spring loaded gap sensing device w hich automatically freezes the required peak value of the toe. a set of link hanger, balancing legs, and thr ust bearing & tongs is provided for pulling the clip in a uniform and balanced manner. only 4-5 minutes ti me is required for installation of device on track, measurement of reading and removal of device from the li ne. [ warranty period: 12 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up