Get complete information related to latest Laser Printer Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Laser Printer Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Laser Printer Scrap Tenders.
Tender For corrigendum : purchase of biochemistry lab equipments - fully automatic biochemistry analyzerthroughput: 200 photometric tests/hour & 400 tests/hour with ise (optional)reagent positions: 50 cooled reagent positionssample type: whole blood, serum, plasma, urine, csf otherreading volume: 180 lsample volume: 2-70 l (adjustable in 0.1 l)reagent volume: 10-300 l (adjustable in 1 l)light source: halogen lampon board laundry: 6 stage cleaning, 2 stage drying with cuvette validation stepcalibration type: linear, non-linear, multipointprogrammable parameters: default system pack parameters + upto 10 user defined parametersdimensions and weight: ergonomic design and light weight., fully automatic hematology analyzerthroughput-up to 80 samples per hourdimensions and weight ergonomic design and light weighttest mode-cbc, cbc+diffdata storage capacity-up to 100 000 resultscommunication-lan port supports hl7 protocolpower requirement-a.c. 100-240 v, less than or equal to 300 va, 50/60 hzoperating temperature-15 to 30 degree celsiusoperating humidity-30-85%air pressure70-106 kpa, fully automatic immunoassay analyser random assay (hormone analyser)instrument name: immunoassay analyserusage/application-clinicalplate format-random assaydetection method-luminescenceparameters-blood alcohol contentautomation-fully automaticuser input-touchassays-diabetes, thyroid, cardiac, vit d, fully automatic electrolyte analyser-analysis time: 60 second per sample parameters- na , k , cl or ca2+no. of parameters 3 simultaneously90 luser inputs 5 colored touch screen displayelectrode type- sturdy electrode (facility to refill the solution)connectivity 2 usb port, rs232, lisdata storage- 10,000 patient results & 10,000 qc results for 3 levelssample identification- alphanumeric sample idqc management- tri-level quality control, l j plots of last 30 dayscalibration- 2 point calibration on every 4 hours1 point with every samplepower - 100 240 v, 50/60 hz (self adjusting)printer - inbuilt thermal printerroom temperature -15 30 c / 60 90 fhumidity- 85%dimensions and weight - ergonomic design and light weight, centrifuge machine along with 500 prp test tubes (double spin)parameter- neya-16 max speed (rpm)- 15000max rcf (g)- 21000max capacity (ml)- 4 x 175acceleration profiles- 10deceleration profiles- 10display-- multi-color lcdno of programmes- 10 (protected)timer- 30 sec to 99 min & continuous modeergonomic design and light weightsupply - 220v, 50 hz, 1 phasecan be used for extracting prp, autoclavekey features- high-pressure vessel: a high-pressure vessel designed to withstand high temperatures and pressures- temperature control: precise temperature control to ensure effective sterilization- timer and controls: easy-to-use timer and controls for convenient operation- safety features: multiple safety features, such as automatic shut-off and overheat protection, to prevent accidents and ensure safe operationconstruction and materials- stainless steel: a durable stainless steel construction to withstand high temperatures and pressures- insulation: high-quality insulation to ensure efficient heat retention and energy savings- door and seals: a secure door and seal system to prevent steam escape and ensure effective sterilizationperformance specifications- temperature range: 121 c to 134 c.- pressure range: upto 30 psi- cycle time: 15-60 minutes- sterilization capacity in liters or cubic feetsafety standards- compliance with regulations: compliance with relevant regulations, such as asme, fda, and iso standards- automatic safety devices: automatic safety devices, such as overheat protection and low-water cut off, to prevent accidents and ensure safe operation- interlocks: interlocks to prevent door opening during operation and ensure user safetyadditional features- data logging: optional data logging capabilities to track temperature, pressure, and cycle data- printed records: optional printed records of cycle data for documentation and quality control- val
Tender For custom bid for services - defect rectification of acsr 2 (south tower)-defect., in has reported that tracks are not available on display of acsr #2., defect identification., di for the same was undertaken on 13 jun 2025. it was found that the pedestal unit, was required to be replaced to rectify the defect., scope of work to undertake defect rectification., 1. spare part., the required pedestal unit for replacement will be provisioned by in on site. all other, components/ units of acsr #2 should be in place to operationalize the system., 2. manpower., three skilled technicians will be required to undertake the pedestal replacement work., one tower climber also needs to be available on site. the tower climber and two, technicians will be provisioned by hela., 3. material/ machinery., one overhead crane with a loading capacity of one ton lifting to a height of 35 mtrs is, required to undertake the work. the same will be provisioned by in., 4. tools and accessory., the following are required and will be provisioned by hela:-, (a) torque wrench, (b) level indicator, (c) eye hook -02, (d) two 50 mtrs rope, (e) silicon, (f) drill machine, (g) lubricant, (h) slings for lifting, 5. activity to be undertaken., the sequence of events for replacement of pedestal unit will be as tollows:-, (a) disconnect and remove all cables, wave guide ard units from the antennae assembly., (b) fitment of lifting eye hook on antenna and pass lifting slings to the eye hook. dismantle antenna from pedestal unit and keep it on even surface on, the ground with the help of overhead crane. special care is o be undertaken while handling waveguide., (c) hook on the pedestal unit on overhead crane and op an securing bolts, of pedestal unit. lift the pedestal and move to the ground with cap closed of all connectors., (d) hook up new pedestal and lift it to the tower top and w hen aligned with, the position of pedestal plate lower the pedestal on the plate and tight the nut, bolt with level indicator on top of the pedestal to confirm tht the same is at, zero level., (e) lift the antenna to the top of tower and fix it to the pede stal unit., (f) install all units of acsr on top of tower and fix connectors and waveguide to the antenna., (g) switch on power and carry out power checks and fo (hecks., (h) switch on the acsr server and carry out alignment of system to get the tracks appeared on the display., 6. safety., all man working on tower should wear safety belt, safety helmet and safety belt to be, tied on two rigid point at tower top. the man below tower for handlin activity should, wear helmet. the antennae assembly and pedestal unit should be se cured with twopoint safety rope while lifting and lowering the same to avoid any dan age to the man, and material view heavy wind, lifting jerk or swing of the crane sling., .