Web Analytics Made Easy - StatCounter

Ldpe Roll Tenders

Get complete information related to latest Ldpe Roll Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ldpe Roll Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ldpe Roll Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :41280516 Due date: 25 Aug, 202525 Aug, 2025 NA
Tender For supply of stainless steel dust bin with fixing and securing arrangement for lhb coaches as per anne xure-a and the drawing enclosed. note:- material specification as per annexure-a and drawings drg no. s wr-ubls-c&w-353,354,355,359,361,362,363,364,365,367 & 368 as enclosed. [ warranty period: 30 m onths after the date of delivery ]

Central Government And Public Sector

CTN :41281135 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of vestibule bellow top complete for gangway of lhb type coaches as per icf drg. no. lwscz ac-2-5- 005, alt-nil or latest with set of bellow securing fasteners to item no 8, 9, & 10 (qty-06 set) conform ing to assy. drg. no. lwsczac-2-5-002. note- (a) packing condition: covered in transparent polythene and packed in suitable length wooden case as shown in icf drg. no. icf/sk-2-5-090 (b) material conforming to rdso spec. no. rdso/2007/cg-05(rev-1) [ warranty period: 30 months after the date of delivery ]

Central Government And Public Sector

CTN :41281295 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of vestibule bellow complete (rh side) for gangway of lhb type coaches as per icf drg. no. l wsczac-2-5-004, alt-nil with set of bellow securing fasteners to item no. 8, 9 & 10 (qty-04 set) conforming to assy. drg. no. lwsczac-2-5-002. note: (a) packing condition: covered in transparent polythene and pac ked in suitable length wooden case as shown in icf drg. no. icf/sk-2-5-090 to avoid deforming of rubber b ellow ring. (b) material conforming to rdso spec. no. rdso/2007/cg-05(rev-1) [ warranty period: 30 m onths after the date of delivery ]

Central Government/Public Sector

CTN :41200832 Due date: 31 Jul, 202531 Jul, 2025 NA
Tender For supply of vestibule bellow complete (lh side) for gangway of lhb type coaches as per icf drg.no . lwsczac-2-5-003, alt-nil with set of bellow securing fasteners to item nos.8,9 &10 (qty-04 set) conf orming to assy. drg. no.lwsczac-2-5-002 alt.f. note:a) packing condition: covered in transparent poly thene and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090 to avoid defo rming of rubber bellow ring. b) material conforming to rdso spec.no. rdso/2007/cg- 05(rev.1). [ wa rranty period: 60 months after the date of delivery ]

Central Government/Public Sector

CTN :41165477 Due date: 31 Jul, 202531 Jul, 2025 NA
Tender For supply of maintenance kit-02 for earthing equipments consisting of following 6 items. (1) housing to rc f drg. no. lw 71233, alt-d, qty-1 no. (2) cover to rcf drg. no. lw 71234, alt-d, qty-1 no. (3) blanking plug to rcf drg. no. lw 71236, alt-nil, qty-1 no. (4) ring oiler to rcf drg. no. lw 71242, alt-c, qty1 no. (5) slip assly. to rcf drg. no. lw 71243, alt-nil, qty-1 no. (6) securing ring to rcf drg. no. lw 71241, alt-a, qty-1 no. material confirming to rcf specification no. edts-101, rev c with corrigendum 8, amendment 3, annex ure 1 [ warranty period: 30 months after the date of delivery ]

CTN :41142791 Due date: 14 Aug, 202514 Aug, 2025 NA
Tender For supply of vestibule bellow top complete for gangway of lhb type coaches as per icf drg. no. l wsczac-2-5-005, alt-nil or latest with bellow securing fasteners item no. 8(qty 04 nos.), item no.9 (q ty 04 nos.), & item no. 10 (qty-04 nos) of drawing. no. lwsczac-2-5-002. note: (a) packing condition : coverd in transparent polythene and packed in suitable length wooden case as shown in icf drg. no. icf/sk-2-5-090 (b) item should be procured from approved venders only. (c) material conforming to r dso spec. no. rdso/2007/cg-05(rev-1) [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40737883 Due date: 31 Jul, 202531 Jul, 2025 NA
Tender For supply of maintenance kit-02 for earthing equipments consisting of following 6 items. (1) housing to rc f drg. no. lw 71233, alt-d, qty-1 no. (2) cover to rcf drg. no. lw 71234, alt-d, qty-1 no. (3) blanking plug to rcf drg. no. lw 71236, alt-nil, qty-1 no. (4) ring oiler to rcf drg. no. lw 71242, alt-c, qty1 no. (5) slip assly. to rcf drg. no. lw 71243, alt-nil, qty-1 no. (6) securing ring to rcf drg. no. lw 71241, alt-a, qty-1 no. material confirming to rcf specification no. edts-101, rev c with corrigendum 8, amendment 3, annex ure 1 [ warranty period: 30 months after the date of delivery ]

CTN :41101150 Due date: 06 Aug, 202506 Aug, 2025 NA
Tender For custom bid for services - defect rectification of acsr 2 (south tower)-defect., in has reported that tracks are not available on display of acsr #2., defect identification., di for the same was undertaken on 13 jun 2025. it was found that the pedestal unit, was required to be replaced to rectify the defect., scope of work to undertake defect rectification., 1. spare part., the required pedestal unit for replacement will be provisioned by in on site. all other, components/ units of acsr #2 should be in place to operationalize the system., 2. manpower., three skilled technicians will be required to undertake the pedestal replacement work., one tower climber also needs to be available on site. the tower climber and two, technicians will be provisioned by hela., 3. material/ machinery., one overhead crane with a loading capacity of one ton lifting to a height of 35 mtrs is, required to undertake the work. the same will be provisioned by in., 4. tools and accessory., the following are required and will be provisioned by hela:-, (a) torque wrench, (b) level indicator, (c) eye hook -02, (d) two 50 mtrs rope, (e) silicon, (f) drill machine, (g) lubricant, (h) slings for lifting, 5. activity to be undertaken., the sequence of events for replacement of pedestal unit will be as tollows:-, (a) disconnect and remove all cables, wave guide ard units from the antennae assembly., (b) fitment of lifting eye hook on antenna and pass lifting slings to the eye hook. dismantle antenna from pedestal unit and keep it on even surface on, the ground with the help of overhead crane. special care is o be undertaken while handling waveguide., (c) hook on the pedestal unit on overhead crane and op an securing bolts, of pedestal unit. lift the pedestal and move to the ground with cap closed of all connectors., (d) hook up new pedestal and lift it to the tower top and w hen aligned with, the position of pedestal plate lower the pedestal on the plate and tight the nut, bolt with level indicator on top of the pedestal to confirm tht the same is at, zero level., (e) lift the antenna to the top of tower and fix it to the pede stal unit., (f) install all units of acsr on top of tower and fix connectors and waveguide to the antenna., (g) switch on power and carry out power checks and fo (hecks., (h) switch on the acsr server and carry out alignment of system to get the tracks appeared on the display., 6. safety., all man working on tower should wear safety belt, safety helmet and safety belt to be, tied on two rigid point at tower top. the man below tower for handlin activity should, wear helmet. the antennae assembly and pedestal unit should be se cured with twopoint safety rope while lifting and lowering the same to avoid any dan age to the man, and material view heavy wind, lifting jerk or swing of the crane sling., .

CTN :41044712 Due date: 01 Aug, 202501 Aug, 2025 NA
Tender For supply of scaffolding material : : - vertical pipe , horizontal pipe , m s scaffolding board size 2465mm x 295m , angular transom sockets , staircase 9 steps 2500 m x 2000m , diagonal bracing tube 2500 mm , hop up bracket 2 board , hop up bracket 3 board , hop up bracket 4 board , toe board 2_5 mm , toe board 1_25 mm , fixed base plate , adjustable base plate , pipe securing double coupler swivel

CTN :41054526 Due date: 02 Aug, 202502 Aug, 2025 NA
Tender For repair, maintenance, and installation of plant/ systems/equipments (version 2) - as per sow; as per sow; service provider-work for augmentation of security accessories and fittings along with refurbishment in qrt room-1 supply & installation of customised double foldable bunk beds with thich pipe and heavy rod along with mattress (size: 6"*2.5"). to be fabricated as per site lay out/ space available. design drawing is to be approved by the buyer prior to production. to the scale autocad/3d view to be generated and approved by buyer. 3 nos, 2 supply & installation of customised 4 seater foldable wall amounted ply with lamination open both sides dining table (4'*2'). suitable back laminate matching with wall d cor is to be applied. the same to be customised based on avaialble space. 1 nos, 3 supply & installation of humidity control device - 1.5 ton, including accessories, stabiliser, mccb, outdoor stand 2 nos, 4 supply & installation of 50" inches cctv led display unit with wall mounted stand alongwith cabling from cctv recording room with required conduit with adequate digging for laying of pvc duct(approximate length 50 rmt) 1 nos, 5 supply of oak armless foladable/stackable plastic chairs (weight bearing capacity - 120 kgs) 4 nos, 6 supply & installation of personnel saniatry and hygienic items for bathroom and washplace based on site-visit. 1 job, 7 customised termite proof gypsum based roof ceiling to reduce heat by creatin an insulated space and minimizing direct sunlight exposure 1 job, 8 supply & installation of customised modular storage rack (6'*3') for qrt weapons, accescories with lock and chain and frontal transparent acryllic sheet, necessary stickering. 1 nos, 9 securing of all electrical cable including false ceiling down lighting, switches, concealed wiring for cctv line, dth, ac, telephone etc) 1 job, 10 supply and installation of exhaust and recirculation system for effective air cycle changing 2 nos 11 supply & installation of roller blinds for windows (06 nos) 150 sqft 12 supply & installation of hangers and metallic stoppers for rifles with plywood plus laminate in the backdrop. 1 job 13 supply & installation of customised wooden locker to keep f/f appliances with frontal transparent acyllic sheet and locking arrangement. 1 job, 14 painting of walls (inside roomk) including material. placement of qrt room tally with necessary illumination 1 job, 15 supply of customised wooden centre table (4'*2') with magazine holder. 1 nos.
 Loading, Please wait...

Connect us via What's Up