Get complete information related to latest Lever Arm Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lever Arm Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lever Arm Tenders.
Tender For supply of connecting lever assly. to m/s. escorts drg. no. 3kb 4325( consisting of 07 items) of m/s escorts make parking brake system of emus/memus, m/s escorts drg./pt.no. and qty. required per set are mentioned as follows;- (1) desc.- lever-m/s escorts drg./pt. no.-3 kb 4322-qty./set 1 no. (2) leverarm- 4 kb 4323-2 nos. (3) pin-4 kb 4324- 1 no. (4) link- 4 kb 4321-2 nos. (5) split pin 5x 32- is:549 -4 nos. (6) plain washer 22 is: 2016-6 nos. (7) pin -4 kb 4374-1 no. escorts drg. no. 3kb4325 spec:escorts drg.no. 3kb4325. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of multimeter htc , screw driver set small all types bits , tweezer , wire cutter , nylone brush kit , wire stripper , cutting pliers , components box , allen key set with steel handle , soldering flux liquid , soldering soft wire , de- soldering wiek , soldering station 60w , electric screw driver cordless , glue gun with glue sticks , pcb holder adjustable , spanner set 6.22 mm , tip cleaner soldering iron
Tender For supply of bricks , sand , agg 20mm , agg 10mm , agg 63mm , coarse sand , cement , binding wire tata , white cement jk , wire brush , enamel paint gloss r y b g bk wh 6 ltr each , enamel paint matt r y b g bk wh 6 ltr each , turpentine oil , cotton waste , poster colour 12 shade , water tube colour 12 shade , glass marking pencil , distemper white , wall putty , emery paper 200 320 and 400 nos 25 each , stainer wall nut rose wood oak yellow red brown teak , washing thinner , touchwood 4 ltr pack , stain powder r br y bk 1 kg each , writing brush round 0 to 12 no , writing brush flat 0 to 12 no , water painting brush 0 to 12 no , oil painting brush 0 to 12 no , mixing plate tray , distemper brush , roller brush , putty blade , paint brush 1 inch , paint brush 2 inch , paint brush 4 inch , glass glue locitte , glass 2mm , glass 8mm , glass sanding disc , masking tape , acrylic putty , wall primer , canvas board 16 inch x 12 inch fine grain , universal stainer r y b g 1 btl each , diamond glazer , malmal cloth , duco primer , duco paint gloss r y b g bk wh 6 ltr each , duco paint matt r y b g bk wh 6 ltr each , duco thinner , pgi sheet 8 ft x4 ft x 24g , gi wire 2mm , gi wire 4mm , ms flat 1 pt 5 inch x 1 pt 5 inch x 5mm , ms flat 1 inch x 1 inch x 5mm , ms flat 2 inch x 1 inch x 5mm , ms square pipe 1 inch x1 inch x3mm , ms round pipe 1 inch x 3mm , ms rod 25mm , ms round bar 10mm , ms angle iron 25x25x3mm , ms angle iron 35x35x3mm , ms sheet 6 ft x 3 ft x 3mm , aluminium plate 3 ft x 4 ft , ms flat 2 inch x 5mm , gi pipe 3 by 4 inch , gi rivet no 8 500 gm , gi rivet no 10 500 gm , gi rivet no 12 500 gm , distilled water , u clip 6 mm , u clip 7 mm , u clip 9 mm , rawlplug 1 pt 5 , casing capping 25mm , extension board 15 amp modular , 3 pin top 15 amp , capacitor 42 mfd , fire fighting foam chemical 1 by 2 ltr btl , timber teak 10 ft x 2 inch x 2 inch cft 5 , timber sheesham 8 inch x 6 inch x 1 inch , plywood 8 ft x 4 ft x12mm , plywood 8 ft x 4 ft x 19mm , cnc bit flat bottom straight flutes bit 2 3 4 6 mm 5 each , cnc bit ball nose bit round tip 2 3 4 6mm 5 each , welding rod no 10 , cutting disc 14 inch , grinding disc 4 inch , grinding disc 8 inch , cutting disc 4 inch , aluminium filer rod 1 by 8 inch , brass rod 1 by 6 inch , copper rod 1 by 16 inch , brazing flux 1 kg pkt , acetylene gas , oxygen gas , co2 gas , nitrogen gas , soft coal , hack saw blade 12 inch , drill bit all size 2 to 13 mm bosch , power hacksaw blade 18 inch , black screw 3 by 4 inch 500 pc , black screw 1 inch 500 pc , black screw 2 inch 500 pc , sanding disc 4 inch , tile cutter blade 4 inch , tile cutter blade 121 by 141 bosch gdc , marbal grinding disc size 0 1 2 3 60 80 120 2 each size , marble polishing disc , silicon sealant with gun 250ml , pu expanding foam sealant with gun 250ml , spray paint gun , chain saw blade 18 inch , chain saw blade 16 inch , hand gloves , welding holder , hacksaw frame , duracell bty 1 pt 5v ultra
Tender For corrigendum : supply of optical consumable items - kinematic mirror holder, high resolution micro positioner, high resolution micropositioner, high resolution micropositioner, high resolution micropositioner, sh05r optical shutter, isolated probe tip holder (4.75 inches)
Tender For supply, delivery, installation of one number dismantling joint along with replacement of worn out spare parts, testing and commissioning of 750 mm dia. pdv and other allied works of pump unit no. 5 at cwps-ii, grww. - supply, delivery, installation, testing andcommissioning of 700 mm dia ms dismantling joints., dismantling counter weight, lever, arm, hydraulic unit etc. and all other components of the hydraulic system one by one of 750 mm dia. pump discharge valve parts by parts sequentially and cautiously as per direction of the engineer-in-charge (eic) at grww., dismantling the 750 mm dia. pdv from the existing pipe-bay, installatio/fitting-fixing of barrel-piece/flange and lifting & keeping the same on the working platform sequentially and cautiously as per diretion of the eic at grww., to and fro transportation charges of 750 mm dia. pdv from grww to workshop including loading and unloading.., dismantling all the components of 750 mm dia. pdv parts by parts sequentially and cautiously as per direction of the eic at grww/workshop., supply, delivery and fitting-fixing of drive shaft of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of valve seal of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of seat ring (ss 410) of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of seat ring (epdm rubber) of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of stub bearing bush of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of drive bearing bush of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of clamping ring of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of end cover of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of o ring of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of shaft pin of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of allen screw of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., supply,delivery and fitting-fixing of gland plate of 750 mm dia. pdv sequentially and cautiously as per sample and direction of the eic at grww., supply, delivery and fitting-fixing of shaft key of 750 mm dia pdv sequentially and cautiously as per sample and direction of the eic at grww., repairing the damaged portion of the hole for holding the bearing of 750 mm dia. pdv by deposting metal, boring, machining, grinding etc., all complete, as per original shape and size and direction of eic at grww.., re-aasembling all the components of 750 mm dia. pdv parts by parts sequentially and cautiously as per direction of eic at grww., performing of necessary hydro-testing of the disc and body of 750 mm dia. pdv as per direction of eic at grww., lowering from the working-bay, installation, fitting-fixing of 750 mm dia. pdv in the existing pipe-bay removing the existing barrel-piece/flanges as per direction of the eic at grww., re-assembling and re-fitting all the components of the hydraulic system like counter weight, lever, arm, hydraulic unit etc. with the existing 750 mm dia. pdv installed in the pipe-bay parts by parts sequentially and cautiously as per direction of the eic at grww., test run, operation and commissioning of the entire system of 750 mm dia. pdv as per direction of the eic at grww.