Web Analytics Made Easy - StatCounter

Library Cabinet Tenders

Get complete information related to latest Library Cabinet Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Library Cabinet Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Library Cabinet Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43420223 Due date: 23 Jan, 202623 Jan, 2026 NA
Tender For tender for supply of t/c speed sensor , flange with coupling , cross piece , male plug , oil pump casing , oil pump special nut , plug , flange , tightening ring , cover , alu shim , return line to cr case , pipe clamp , elastic mountings tsc t140 by 70 d , gasket , o-ring , o ring-an33 nse6 5 21a7 , fuel feed pump cw engine , limit switch box , rubber compensating sleeve dn40 pn16 lf130 , rubber compensating sleeve dn80 pn16 lf130 , pipe , temperature sensor , turbocharger speed tranmitter , sleeve flexmaster gm10006-20 nbr , tab washer dn 12 , gasket , piston ring , o ring , gasket , equipped cylinder head , o , o ring 5 589 viton 20312 , peak pressure indicator , spherical bearing ge505w , inlet thermostatic valve , fw level switch , immersion heater , over speed solenoid valve , pressure gauge , spring washer packing , sealing ring , hex headed screw , hex headed screw , locking plate , cap nut , main bearing assly , bearing , eccentric shaft , gov driving gear pinion , ball bearing box , pair of bevel gears , bevel pinion , shim , safety valve in oil cct assly , water outlet part , duct , bs ring , joint , o ring no 87 21a7 , flexmast couplpipe 88 9mm o d , joint , joint dn 150 , bolt m16x110l 8.8 with 2mm loc , injector pump pin , locking bolt m14-60 by 29 u 10.9 , water pump pinion , oil seal , internal circlip , shim , mech.seal for balmo f.f.pump , seal-balmo fuel feed pump , flexmast conn gm10006-038 38 od , flow switch for l o priming safe , joint press seal p 18 26x18 , safety valve , gasket , set of gasket for filter hyd , set of full flow filtering elements , servo booster for pga 12 governor , temp sensor exhaust , fuel feed pump ccw engine , set of oil seal 19x30x7 for aroto g15sp ffp , fuel feed pump-aroto-g15sp-fr ccw eng , drive rotor , driven rotor , packing at both end , mechanical seal , 25 pin socket insert plug jaeger , injector assembly , sleeve dn80 , pn16 , lub oil thermostatic valve range 63 by 71 deg c , thermostat element , shim injection pump , o ring , expansion bellow , air staring vale , hose pipe mod 16 sae 100r5 l 220mm , flexible hose , rubber compensating sleeve dn65 pn16 lf 130 , ruber compensating sleeve dn150 pn16 lf130 , air distributor , loctite 648 , fuel clogging indicatior , sensor ref 19127sc , sensor ref 1950sc , switch for manual stop xck j265 , proximite detector mod 9984 2102 , breaker switch type zckj2 , starting air valve , 2 way pneumatic valve , o ring , disc spring dia 25 dia 12 5 1.5 , inner star for tacoma opvs , duplex fuel filter , filter element for 2-stage marin engine , injector calibration pump , temperature regulating pn40dn100 , pneumatic stop valve , pressure regulating valve , pressure switch , thermometer 0-100 , temp.sensor mbt4 s 90 m18 1 5-ef3 , thermostat element for naval opv , seal kit , circulation heater element for ktmi opv , thermostat for circulation heater for ktmi opv , fuel filter element for filter type 20251261751032 , over speed air lowpresure switch raing bar , lop gear , non return valve , screw plug , packing perform , hydropneumatic pump with hoses , stud , circlip external 65mm , circlip external 90 mm , core plug hex.head , rocker arm equipped , contact aux , o ring , cup plug , exhaust gasket , anode , thermometric duct , inner star

Central Government/Public Sector

CTN :43028816 Due date: 22 Jan, 202622 Jan, 2026 12.00 Crore
Tender For corrigendum : supply of orv sagar nidhi ship modifications for integration of lars 80swl : - as per deliverables stage 1 indicated at scc , receipt of new lars from niot oem and safe storage at shipyard premises as specified in the scope of work, stage 2 point f , removal of the existing a frame onboard ship incl. of two hyd. cylinders, pistons, foundation and existing deep sea winch. handing over the two items to niot nominated contractor with full docs , modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class irs and dnv in dry dock , completion of intgr of lars by successfully completing of inst comm and hat of new lars onboard ship alongwith oem necessary support for sat will be carried out by niot and oem , cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 tons , all risk insurance for new lars and from date of receipt at shipyard till successful completion of hat and sat all risk insurance for the ship, people, niot property during drydock period as per nit

Central Government/Public Sector

CTN :43379989 Due date: 14 Jan, 202614 Jan, 2026 NA
Tender For custom bid for services - operational enabling activities in chp of cob#1-5 complex; 1) section operational activities in tippler for running shifts scope of job involves 1. wagons are to be placed in md1 (for tippler#1) and md2 (for tippler#2) t hrough a capstan winch (maximum 7 wagons) by means of hook fixing, deco upling, and winch operation, after placement of wagons by the traffic dep artment, for unloading in both tippler#1 and tippler#2. 2. after tippling, the empty wagons shall be shifted to a safe distance fro m tippler#1 and tippler#2 with the help of the empty side winch. 3. the first empty wagon on the empty side shall be decoupled and then co upled with the subsequent empty wagon pushed from both tippler#1 and ti ppler#2. the process of decoupling and coupling with the subsequent wag on shall continue until the completion of wagon unloading in both tipplers. 4. checking and cleaning of all underground equipments like (raf1 &raf2), belt conveyors, chutes and pitpumps at the beginning of each shift and per iodically to avoid any breakdowns. 5. periodical checking and cleaning of chutes during unloading from tippl er section to coal yard. 6. gate changing and diversion of belt routes as rquired for operation up to coal yard. 7. sample collection for labaratory purpose as per instruction of executi ng officer/chargeman. unit of measurement is "each". each is defined as the scope of job mentione d done in tippler section of old coal handling plant of coke ovens in a day, 2) scope of job involves 1. checking and cleaning of all belt conveyors, chutes, weigh feeders, and pit pumps of the blending section in both mt and expansion side shall be ca rried out at the beginning of each shift and periodically during the shift t o avoid chute jamming and ensure proper coal feeding to the service bunke 5 / 25 rs. 2. close monitoring of the discharge from weigh feeders shall be ensured as per the prescribed blend ratio, and air blasters shall be operated imme diately in case any weigh feeder is not discharging. 3. blending has to be stopped if any of the weigh feeders is not dischargin g even after operating air blasters and the same to be informed to concer ned shift incharge. 4. checking and cleaning of all belt conveyors, chutes and trolleys of all the service bunkers at the beginning of shift and periodically. 5. operation of trolleys of the service bunkers and communicate with elbd s after positioning of trolley for coal feeding. 6. gate changing and diversion of belt routes of service bunker s as rquir ed for operation. unit of measurement is "each". each is defined as the scope of job mentione d done in blending section in mt & expansides of old coal handling plant o f coke ovens in a day. the jobs are continuous in nature and shall be carried out round-thecloc k in three running shifts (a,b &c) the tenderer shall take up all works whi ch are specifically mentioned as per requirement in special terms and cond itions and also all facilitating activities which are necessary to maintain and ensure normal production..
 Loading, Please wait...

Connect us via What's Up