Tender For supply of siren 24v for als amb , cable lifting pipe for tatra , wiper gear set for tata 2.5 ton , wiper arm army bus , tandem master cyl for tata 2.5 ton , pressure plate for als , door lock front for als amb , door lock rear for als amb , rep kit for tata 2.5 ton
Tender For supply of clutch plate , pressure plate , bearing , pressure pipe , clutch plate with bearing , head light , suspension kit , water bottle , relay , combination switch , gear lever joint , oil seal , minor rep kit for master cyl , cabin lifting hyd pipe , wheel disk with bearing , field coil , cyl head kit
Tender For supply of air compressor , speedometer cable , gear shift booster , cabin lifting pump , poly v belt fan drive , coupling , belt drive , anti frz premix , field coil , bush set , pinion differential , bush set for air compressor
Tender For supply of oil lifting pump motor set similar to groz make model-part no opm/220/hf or as p er specifications-(1) heavy duty high flow gear pump mechanism assembled with electric motor-220vac, 5 0hz, (2) 1/2 to 2 hp, (3) pressure-60 to 100 psi, (4) flow rate- 25 to 40 lpm, (5) suction & delivery pipe siz e-3/4 inch to 1 inch, (6) oil control gun with delivery pipe length 8 to 10 feet, (7) water resistant, (8) duty cycle (minimum)-30 minutes. (9) pump motor should be suitable for lube oil drainage from locomotives and filling same lube oil. [ warranty period: 30 months after the date of delivery ]
Tender For supply of single head surface polishing machines suitable for square pipe and rod. specifications of machine as per pdf uploaded. , roller conveyor of 5 meters at entry and exit , roller conveyor of 1 meters at entry and exit , main motor 5hp , conveyor motor with gear box 0.5hp , head up and down motor with gear box 0.5hp , tools kit , 5 pin plug and socket , lifting jack
Tender For purchase of diffrent mt equpment for repairing/maintaince of mt vehs - engine over hauling & servicing charges of maruti gypsy veh ba no 088100439m , replacement of hood light accessories, interior fan, copper bush, fuel pump and servicing charges of veh ba no 05e016991x school bus replacement of pressure gang, ecm and box cover, bty master switch, cabin lock accessories, reverse light switch, right side window screen beading, 4 x 4 operating valve, pressure pipe, fuel tank mounting belt of veh ba no 11p030667k als , replacement of knuckle bearing, knuckle bearing copper, knuckle bearing bush, bearing kit, ignition switch assembly, accelerator cable & b booster assembly of veh ba no 09c086837y 2.5 ton tata , replacement of road spring accessories left & right, axel seal, hub oil seal, release bearing, ac gas refilling, front left/right road spring accessories, left side axel fuel punched, gear shifting hard, ac not cooling, steering gear box access play, seat belt cover & wheel disk qty-04 of veh ba no 14b114892k maruti gypsy , whole body painting & replacement of ac belt tensioner of veh ba no 11b109346a maruti sx4 , replacement of air compressor pipe, pneumatic valve, master switch, lifting pump cabin, loom set alternator, front glass winch & servicing charges of veh ba no 99e14246w , replacement of suspension bush set, tie rod end & ac refilling of veh ba no 10b104857a staff car
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu