Tender For tender for supply of supply installation , testing and commissioning of high-speed network desktop scanner 2-sided scan up to 80 images per minute 80 sheet automatic document feeder (adf) , supply installation , testing and commissioning of brother cartridge black high capacity toner cartridge , up to 3 , 000 pages. declared yield in accordance with iso/iec 19752. , supply installation , testing and commissioning of dual drive go type-c 128gb , otg , upto 400mb/s , usb3.2_gen_1 pendrive , navagio bay , 5y warranty , supply installation , testing and commissioning of smart tank all-in-one wifi colour printer , supply installation , testing and commissioning of 1tb portable ssd , 800mb/s r , usb 3.2 gen 2 , rugged ssd with upto 2 meter drop protection , type-c to type-a cable , pc & mac compatible , external ssd , supply installation , testing and commissioning of 1tb external hdd - usb 3.0 for windows and mac with 3 yr data recovery services , portable hard drive , supply installation , testing and commissioning of dual drive go type-c 64gb , otg , upto 300mb/s , usb3.2_gen_1 pendrive , supply installation , testing and commissioning of nano wireless usb keyboard and mouse set , 12 function keys 2.4ghz wireless , 1000dpi , spill-resistant design , pc/mac , black , supply installation , testing and commissioning of 21.5 inch full hd va panel monitor 120hz refresh 1ms vrb adaptivesync srgb 99% flicker-less & bluelightshield zeroframe hdmi + vga tilt adjustable eye care black , supply installation , testing and commissioning of 2tb external hdd - usb 3.0 for windows and mac with 3 yr data recovery services , portable hard drive , supply installation , testing and commissioning of sata 250gb , up to 545mb/s , 2.5 inch/7 mm , 3y warranty , internal solid state drive (ssd) , supply installation , testing and commissioning of pebble 2.0 usb-powered desktop speakers with far-field drivers and passive radiators for pcs and laptops (black) , supply installation , testing and commissioning of wireless mouse - for small to medium sized hands , 2-year battery , silent clicks , customisable side buttons , bluetooth -graphite , supply installation , testing and commissioning of gold prime mechanical wired keyboard dustproof key switches guaranteed 50 million keystrokes 1.5 meter usb cable , usb gold keyboard (black) , supply installation , testing and commissioning of 4k ptz elite 12x camera 4k 3840x2160 60fps 12x optical zoom 16x digital zoom 80x field of view yuv h.264 mjpeg usb , 3g sdi , hdmi , rj45 , rs232 ai trackin , supply installation , testing and commissioning of wifi auto duplex laser printera4 print speed up to 30 ppm black wifi , airprint , mopria , wifi direct , lan , usb 2.0 auto 2-sided duplex printing , 35 sheets auto-document feeder adf , 2-line lcd , 2 in 1 id copy , 32 mb memory , 250 sheets paper tray full capacity toner included. yield up to 2600 pages black with 2 year addition onsite warranty , supply installation , testing and commissioning of 27 inch ips full hd backlit led monitor 144hz refresh rate , 1ms vrb , amd freesync 99% srgb 1 x vga 1 x hdmi with inbox hdmi cable i zero frame design eye care , supply installation , testing and commissioning of 23.8 inch ips full hd backlit led monitor 144hz refresh rate , 1ms vrb response time , amd freesync 1 x vga 1 x hdmi with inbox hdmi cable zero frame design eye care , supply installation , testing and commissioning of 4k 1x2 hdmi duplicator splitter by orei - with scaler 2 ports with full ultra hd , hdcp 2.2 , 4k at 60hz 4 - 4- 4 1080p & 3d supports edid control - uhd-pro102 , supply installation , testing and commissioning of combo wireless mechanical keyboard & mouse , supply installation , testing and commissioning of ac1300 usb wifi adapter (archer t3u) - 2.4g/5g dual band mini wireless network adapter for pc desktop , mu-mimo wi-fi dongle , usb 3.0 , supports windows 11 , 10 , 8.1 , 8 , 7 , xp/mac os 10.15 & earlier , supply installation , te
Tender For corrigendum : maint of rota side wagon tippler e e -repl of main rails and raising of rails , tightening, repl. of all bolts, clits , repl,re fixing of bushes , repl of spur gear assembly , repl of rack pinion , oh of reduction gear box , replacement of sector gear , alignment, grouting of tippling base rollers , repl,repairing of hopper grill , alignment of tipplers , repl,repairing of outboard stool , dismantling,repl of top pivot housing , repl of wooden block , matching of teeth of sector gear , re-fixing lock lever , repl of top stop locking gears assly , side beam fixing of tippler , alignment of motors of wagon tippler , servicing of spray line valve size 4 inch , servicing of spray line valve size 3 inch , servicing of spray line valve size 2 inch , oh of overhead spray pumps , servicing of spray nozzles , lifting, proper fixing of vf tray , changing, fixing of side packing , to provide the patches , repl of plates of vf tray, chutes , removal of foreign , fillings oil in gear box , servocoating,tightening, repl of damaged bolts , greasing of all the nipple point , repl of break shoe liner , repl of main rail beam of wagon tippler , provision of backup in main rail beam , work on central platform , repairing of main rail beam , repairing of rollers of coal spill plates , fab, erection of back support of vf mouth chute , fab., installing of vf tray supports , repl of coal spill plate , repairing of pit platform of main rail beam , repl of damaged beam of vf , repairing of counter balance beam , repairing of mdu base structure , repairing of damaged split spur gear , fab., of mouth piece of vf , erection of new fabricated mouth piece of vf , oh of hoisting system , oh of hopper spray pump, line , provision of hopper liners, in coal hopper of vf , fab. erection of coal hopper partition stool , raising and re-fixing of mouth piece of coal liner chute of vf , repl of back,side plate of mouth piece , to attend the coal leakage from top mouth piece , re-fixing,repositioning of side and back supports , repairing,reposition of side guards of mouth piece , repl of buffer block and buffer pads of counter balance beam , repl of brake drum of thruster brake assly , repl of input,output,intermediate pinion of gear box , fab. and erection of counter balance beam , repairing of wagon tippler plate form by cutting and welding , removing the fallen loaded wagon in pit , inserting the side beam pins in bracket , dismantling,removing the broken shafts of wagon tippler , installation of drive and adjacent intermediate shaft , cutting, fabricated and installation of resting outer rail beam bottom plate