Tender For running maintenance of plc system - running preventive and breakdown maintenance of plc control system with electrical drives all control and instrumentation system of ash handling , replacement new erection of impulse line , replacement new erection of instrument fitting adopter nut tails elbow connector etc , overhauling b 501 and b 601 ss cock valve , overhauling repairing of junction boxes , servicing recalibration erection of fuzi yokogava rosemount etc transmitters , overhauling and recalibration new erection of digital indicators , overhauling and recalibration erection of flow meter conductivity meter , complete overhauling erection of level switches , replacement of pressure switch gauge vibration switch , removal testing erection commissioning calibration of temp gauges switches thermocouple , replacement erection overhauling cleaning of union isolating valveforged body valve , blowing of tapping points of different pressure transmitters switches , fabrication repairing of instruments plateform , laying patrolling of instrumentation cable , servicing and maintenance of air conditioner , cleaning of control room plc system , repairing of ups , service replacement of faulty butterfly valves along with act , servicing replacement of faulty diaphragm type valves , changing spindle gland of root valves , cleaning blowing by air of impulse lines , attend leakage from steam water air line , replace gauges switches of pressure temp , testing caliberation of pressure gauges , testing calibration of pressure switches , testing calibration of temp gauges , testing calibration of temp switches , replacement of thermocouples , cleaning servicing of terminal block in compressor house swas system , changing of ss root valves , servicing of 10mm hp lp 3way manifold valves , replace of 10mm hp lp 3way mfold valves , removal choking replace of impulse line , erection replacement of pvc armored compensate cable , replacement of universal digital indicator , servicing replacement of faulty 4way valve with actuator , replacement remounting of smps 24 v dc , dismantling replacement of combination timerof compressor , servicing of sampling cooler dhx18 sco2 , servicing of sampling cooler dhx12 sco2 , servicing of sampling cooler dhx06 sco1 , miscellaneous mechanical febrication , maintenance of actuator of butterfly valve , maintenance and upkeep of terminal box of motor of actuators in cw pump , maintenance re erection of butterfly valve actuator motor , revisioning and upkeep of marp dcs panel , revisioning testing of various type of switches of local control panel , maintenance revisioning upkeep and testing of 415 v power supply module , maintenance upkeep and repair of junction box of butterfly valve , servicing of mov motors actuators and limit switch assembly , checking cleaning and cable dressing mov motor , overhauling cleaning reconditioning of various size batteries , load test once in six months for various size battery of ups installed for 5x200mw , replacement of damaged switches mcb in acdb panel , cleaning painting of the wooden battery stands , maintenance of window type split type ac , gas charging of ac , rewinding of burnt fan motor
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit; gas manifold system of cnc gas cutting machine; as per nit
Tender For supply of 200 wl capacity compressed bio gas/ natural gas (cbg/cng) cascade composing of 4 gas cylinders to hold compressed biogas at a pressure of 250 bar confirming to is 7285 (part-ii): 2018 (reaffirmed 2022) with frame, pipe connections secured to inlet manifold & valve and as per the specification attached. test certificate issued by petroleum and explosives safety organization (peso) approved manufacturer duly signed by the peso approved competent inspector shall be supplied along with the product. [ warranty period: 12 months after the date of delivery ] ]
Tender For supply of refrigerant recovery unit consisting of 1) gas recovery machine with oil separator suitable for r134a and other category iii refrigerants working in 230 v ac, 50hz, 0.75 hp motor, 1450 rpm, oil-less, air-cooled, piston style compressor, with automatic safety shut off at 38.5 bar (min), recovery rate (liquid) not less than 1.6 kgs / min equivalent to value make model no. vrr12l-os - 1 no. 2 ) empty cylinder 10 kg - 1 no. 3) double gauge manifold - 1 no. make acceptable -appion, robinair, inficon, value [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of stainless steel work table , salamander , food processor , four burner cooking range with exhaust hood, griller and oven , four door refrigerator , two deck oven , stainless steel storage shelves , stainless steel table , stainless steel tandoor gas operated , griddle plate with stand , potato peeler - 10 kg capacity , wet grinder , vegetable cuting machine , high pressure three burner cooking range , tilting pan , stainless steel work table with marble top , three deck electrical oven , planetary mixer - table top model , prooving chamber , ss cooling racks , demonstration table with granite-marble top , ss sink with drain board with backsplash , ice cube machine , cocktail station , high speed mixer blender , bottle stand , wash basin with box stand , chambermaids trolley , floor signs , luggage cart , prestocine exchange rate board , industrial kitchen chimney - exhaust hood , manifold 4plus4 lpg gas line for kitchen * /bid number : gem/2026/b/7701273 + /dated: 23-06-2026 ' ' / bid document 1 / 35
Tender For supply, installation, testing and commissioning of co2, n2 and o2 gas manifold pipeline work in vddc lab thsti ncr biotech science cluster fbd
Tender For corrigendum : design,engineering,supply,instalation,commissioning and maintenance of lpg gas bank system and supply of lpg in cylinders - tender for supply, installation, commissioning & maintenance of lpg (422-450kg lpg manifold) gas banking system, conversion of diesel fired burnder in fbd to lpg/ diesel burner system on turnkey basis and supply of lpg cylinders for two years