Get complete information related to latest Loading Arm Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Loading Arm Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Loading Arm Tenders.
Tender For corrigendum : daiviya apda work under edsd- rura - carriage of various size pcc poles from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work., carriage of various size st poles (9 mtr /11mtr/ 13mtr ) from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work., carriage of line material viz. weasel/rabbit/racoon /dog conductor, g.i. earth wire, cross arm, angle, channel, cable boxes, static meter insulators, clamps and other line material from store center or from any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work., erection of p.c.c double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., grouting of p.c.c double pole the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement., erection of p.c.c single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., grouting of p.c.c single pole. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement., erection of s.t.p single pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., grouting of s.t.p single pole. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement., erection of s.t.p double pole including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work., grouting of s.t.p double pole. the support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement., renozzling of damaged stay set as per respo manual and also including the cost of all grouting material, labour, t & p etc. required for proper completion of work., dismentling of rusted weasal/racoon /dog conductor wire and g.i wire & safe carriage of scrap material back to store as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work., laying, sagging, stringing, binding and jumpering etc. of weasal/dog/rabbit conductor in new erected pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for prope
Tender For m and r work under edd- rania -loading 8.5 m long pcc pole from electricity storage centre jainpur on own vehicle and taking it to work site and unloading it safely through unpaved road. a loading 11 m stp pole from electricity storage centre jainpur on own vehicle and taking it to work site and unloading it safely through unpaved road. a transport of electric line material like conductor, clamp, nut-bolt wire, lt cable, stonepad, station set, xlpe, abc etc. to the specified place by own vehicle for an estimated distance of 75 km through unpaved road. a digging pit at the place of broken/damaged poles and installing pcc poles by tying all accessories like cross arm, disc, pin insulator etc. and fitting earthing rod. a tying all accessories as per requirement in the long span in the middle of the already constructed line. the work of re-energizing by installing additional pcc/stp poles as per the prescribed standard/specification of response link. a the work of re-energizing by installing additional pcc/stp poles as per the prescribed standard/specification of response link while tying all the accessories as per requirement in the middle long span of the already constructed line. a installation of new section double pole in place of broken/damaged double pole. a grouting work of pcc/stp poles as per respo standard. supplying cement, ballast, gravel in the ratio of 1:2:4. repairing section double pole. tightening damaged stays by renosing. tightening the white wires of 33 kv line, each wire and tightening the white wires of lt and 11 kv line, each wire. straightening the skewed poles of 33 kv line/11 kv line/lt line as per respo standard and tying all accessories and erecting them correctly. giving clearance by trimming the trees of 33/11 kv and lt line. spreading the acsr vessel conductor in 33/11 kv line and tying stringing and sagging insulators in all the three phases and jumpering and earthing each wire. replacing damaged cross arm.
Tender For supply of 5 mtr. long gi octagonal pole with internal & external surface of the pole shall be h ot dip galvanized to 65 micron det, hot dip galvanized in single dip as per bs en iso 1461. the pole shall be continuously tapered with top dia 70mm (a/f), bottom dia 130mm (a/f) & minimum sheet thickness 3m m with inbuilt junction box i.e. flush door & base plate size minimum 200 mm x 200 mmx 12 mm with dou ble arm bracket of size 1000 mm each & standard arm cap and cable terminal board for internal connectio n of cable. the poles shall be designed as per bsen 40-3-3:2003 with latest amendment to withstand the m aximum wind speed as per is 875 for the actual loading of the fixtures. bolt size (no. x dia) - 4 x 16 mm, pc d - 200 mm, bolt length -450 mm & projected bolt length -80 mm. category reference:- bajaj bop-5030 [ w arranty period: 30 months after the date of delivery ]
Tender For corrigendum : e tender for carrying out various types of mechanical maintenance works pertainig to marine loadingarms at both bd i and bd iii totally 11 nos.
Tender For corrigendum : for running contract for hon,ble sansad nidhi/vidhayak nidhi and other deposit works under edd-budaun (semi turnkey). - cartage of following material from store center nawada, budaun to je store/je store to site of work including loading & unloading at both ends maximum distance up to 30 km., a) pcc pole 8.5 mrt long/st pole 11 mtr long., b) 11 kv xlpe cable of 3x70/3x120/3x185/3x300 sq.mm., c) 250/400 kva t/f., d) 11 kv ct/pt unit of different size, e) 11 kv jointing kit of different size, f) 11 kv pilfer proof cubical of different size, g) lt abc cable of size 1x16, 3x50, 3x95, 3x120 sq.mm., cartage of line material (11 kv pin insulator, disc insulator, stay set, cross arm, gi wire, earthing rod, ms channel, ms angle, etc) from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 30 km., cartage of 10 kva & 25 kva transformer from store centre to site of work including loading & unloading at both site, the work of safe carriage 11 kv o/g vcb store center nawada budaun to work of site distance up to 0 to 30 km including safe loading & unloading., cartage of 63 kva to 100 kva transformer from store centre to site of work including loading & unloading at both site., earthing of each 11 kv line pole & t/f properly after drive of electrodes if size 20mmx250mm and connection the earthing point with gi wire., erection of pcc pole 8.5 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of soil including back filling of the pole with proper ramming after completion of work., erection of stp pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of soil including back filling of the pole with proper ramming after completion of work., fabrication and fixing of all 11 kv h.t/l.t. line accessories., erection of double pole on pcc pole 8.5 mtr/stp 11 mtr. long after digging of pit of required size including fabrication and fixing of top channel, droper channel & base channel alongwith, fixing all 11 kv accessories, fuse set 11 kv pin insulators and making connection properly., construction of new plinth for 250/400 kva as per uppcl norms, mounting of 250/400 kva t/f on plinth as per uppcl norms, providing and fixing wiremess fencing for 250/400 kva, erection/installation of following of vcb o/g in consumers site and cable joint of the panel to including earthing, grouting, anchor bolt of panel of making/repairing of pocket for cable to insert in panel form trench and fixing taping of busbar with wiring for ac,dc connection including providing ac and dc supply., chemical earthing for 250/400 kva t/f neutral and body complete, chemical earthing for vcb o/g, mounting of 10 & 25 kva t/f with proper jumping of ht side and fixing of cable on lt. side of t/f making connection properly., mounting of 63 & 100 kva t/f with proper jumping of ht side and fixing of cable on lt. side of t/f making connection properly., mounting of ct/pt unit with proper jumping of ht side and fixing of cable on lt. side of meter cubical properly, fixing of meter cubical as per uppcl norms, making a section pole to exist pole after fabrication & fixing of t channel fixing of all 11 kv accessories., erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming., laying lifting stringing of proper sagging of acsr weasel/rabbit/dog conductor for 3 phase, 3 wire 11 kv line including binding & jumpering properly., laying lifting stringing of proper sagging of 11 kv xlpe cable of 3x70, 3x120, 3x185, 3x300 sq.mm., laying of underground 11 kv xlpe cable of 3x70, 3x120, 3x185, 3x300 sq.mm. sizes with open trench by brick & sand as per uppcl norms., filling the 11 kv jointing kit (joint kit providing by c
Tender For corrigendum : supply of unloading and loadingarms for lpg plant - supply of unloadingarms , supply ofloadingarms , supply of spares , site visit charges , brake wire