Tender For supply of ss tower bolt, size 150 mm as per is 15833:2009 used for sg coach panel doors. [ warranty period: 30 months after the date of delivery ]
Tender For supply of transformer oil cooler blower motor - three phase two speed 3-phase induction motor s uitable and compatible with abb make transformer (1250kv a) used in medha make 3phase emu mot or coach as per rdso specifications no. rdso/pe/spec/emu/0163-2012 (rev-1) type 4bs 90l 2/4, kw :1.6/0.25, voltage:415 +/- 10%, hz: 50, dual speed:2880/1455 rpm, amps:3.55/0.93, amb. temp:-5 +55 (deg c), ip 66, insulation class h. make: abb, isgev, italy or hitachi or similar. [ warranty pe riod: 30 months after the date of delivery ]
Tender For supply of fabrication and fitment of ms round jali for s trap in lhb coach (90mm to 94mm) [ warrant y period: 30 months after the date of delivery ]
Tender For supply of fabrication and fitment of ms round jali for s trap in icf coach (140mm to 144mm) [ warra nty period: 30 months after the date of delivery ]
Tender For supply of e.p. magnet valve complete for ep brake unit type ld-2 of memu motor coach wsf part no.c-75117/3. make:-wsf/kolkata. [ warranty period: 30 months after the date of delivery ]
Tender For providing of repair and overhauling service - supply of mt spares; maruti gypsy/mahindra bolero/sml/tata coach/tata xenon; yes; buyer premises - regulator assy, door opener handle right side, speedo cable, door glass regulator, wheel box for wiper, gear mounting bolt, bolt with nut 2 1/2 d-8mm, door glass (r) regulator, wiper arm with blade, fixing bolt, fog lamp assy, eyelet female
Tender For supply of securing cup dia 160 x 40mm as per drawing: emu/m-0-2-007 alt 'n' for motor coach & hcc. material and specification as per drawing [ warranty period: 30 months after the date of delivery ]
Tender For supply of end wall assembly for lhb gs & scn (amrit bharat ) coaches note:-(1)in dra wings "mig welding (131) is to be read as tig welding (141)" as per design letter no. md4 6231 dated 16.03.2024. (2)firm shall collect all latest/final drawings before manufactu ring. there may be minor modification in design., as per drawing: 75415001 alt. 'br1', packing instruction: 1. the supplier shall pack the end wall in a suitably designed returnable fixt ure in such a way that end wall shall not get scratched, damaged, twisted during tra nsportation, storage and lifting and to avoid scratches on outer surface. it should b e seperated by suitable environment friendly blocks to avaoid rubbing of two endwall surfaces . it should have standard clamping /fastening mechanism so that it can be ope ned easily. it should have firm's identification mark. 2. first returanable fixture along with end wall be retained by rcf & this fixture shall be exchanged in the second lot su pply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated havi ng sufficient strenght to bear approximate 2 tonne load in static & moving condition o f two coach sets of end wall. 4. the fixture /frame/pallet should be designed so that t he packed end wall preferably remain in vertical position to minimize surface area. 5. it should also be suitable for storage of end wallunder open sky. [ warranty period: 30 m onths after the date of delivery ]
Tender For supply of one coach set of air spring assembly for train-18 bogies. each coach set wi ll consists of four air spring assembly.firm's offer: same as above with resistoflex drawin g no. 09082960, as per drawing: train 18 001452_1, packing instruction: as per standard packin g. it should be ensured that item should not rub during transportation. the item shou ld be packed with adequate strength. transit damage , if any , shall be at the cost of s upplier. [ warranty period: 72 months after the date of delivery ]