Get complete information related to latest Loop Box Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Loop Box Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Loop Box Tenders.
Tender For corrigendum : urgent rectification of existing loopbox cover by supply and fixing of new loopbox cover for gariahat and parkstreet flyover under hooghly river bridge commissioners
Tender For repair and maintenance of bfl poles by providing water proof looping boxes and joining of cable and raising heights of feeder pillar and joining boxes of flood prone area of 103 and 101 (now 148) bn bsf under shq bsf ferozepur
Tender For installation, testing, commissioning and supply of lcd solar power plant (roof top) for ong rid system, three phase 17kw power with output voltage 415v, complete with solar spv array, module m ounting structure, power conditioning unit (pcu) consisting of maximum power point tracker (mppt), invert er (200v-800v, max output current- 27a) and controls & protections, inter connect cables and switches. sw itching device-igbt, pure sine wave output, ip-65, electric cable for input (pv module to inverter)- 1x4 sq.m m copper cable, lengh-25 mtr, electric cable for output (inverter to net meter)- 3.5x10 sq.mm copper cable , lengh-30mtr, lightning arrester, earthing, danger board, pv module (as per is: 14286) rating- 250-1000wp , no. of pv module- 51 nos., total load on roof- 60 kg per sq.m (max), minimum clearance of structure from roof level- 300mm, suitable to withstand wind pressure of 180km/hr, area required for installation- 180sq. m. installation & testing of the complete system including civil work, designing, cabling work with suitable c lamps & fasteners etc. make- tata power solar, vikram solar, spj solar or similar warranty of solar power pl ant -warranty & guarantee : warranty of pv modules : >/= 25 years from the date of commissioning warra nty of inverter : 8 years from the date of commissioning minimum guarantee for maintaining of output peak watt capacity : >/= 90% at the end of 10 years and >/= 80% at the end of 25 years ]