Tender For supply of set of ermeto fittings for air brake of lhb gs coaches., as per drawing mplefgslhbfur version 6, as per rcf set list attached. [ warranty period: 48 months after the date of delivery ] ]
Tender For supply of set of progressive ring and union nut required for single ferrule fittings in lhb coaches. 1. progressive ring conforming to ermeto dpr22lx or equivalent and to rcf drawing no. lw36189, item-26, alt.- g/nil. qty.- 01 nos/set. 2. union nut conforming to ermeto m22lcfx or equivalent and to rcf drawing no. lw36189, item-27, alt.- g/nil. qty.- 01 nos/set. 3. progressive ring conforming to ermeto or equivalent (for equal elbow w18lcf to rcf drawing no. lw36136, item-56,alt.- c/nil). qty.- 01 nos/set. 4. union nut conforming to ermeto or equivalent (for equal elbow w18lcf to rcf drawing no. lw36136, item-56,alt.- c/nil). qty.- 01 nos/set. 5. progressive ring conforming to ermeto or equivalent (for equal tee t28lcf to rcf drawing no. lw36136, item-50,alt.- c/nil). qty.- 01 nos/set. 6. union nut conforming to ermeto or equivalent (for equal tee t28lcf to rcf drawing no. lw36136, item-50,alt.- c/nil). qty.- 01 nos/set. 7. progressive ring conforming to ermeto or equivalent (for equal tee t10lcf to rcf drawing no. lw36136, item-53,alt.- c/nil). qty.- 01 nos/set. 8. union nut conforming to ermeto or equivalent (for equal tee t10lcf to rcf drawing no. lw36136, item-53,alt.- c/nil). qty.- 01 nos/set. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of pipe fittings. drawing no. : m/s ermeto part no. sv10lcf or equivalent. matl.& specn : as per drawing / part no. [ warranty period: 36 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variationpermitted: max 8 lacs ] ]
Tender For supply of set of ermeto fittings for plumbing of ra coaches., as per drawing: mplefraplubfur version 2, packing instruction: set of ermeto fittings:- each item of the set should be packed individually after covering the threaded portion with suitable cap to preventthread damange in bio-degradeable polythene packet invariably clearly mentioned the part no. of the item on it. all the items of set then collectivelly packed in card board box of sufficent strength, further tied with suitable no. of nylon strips. a well protected list should be pasted on each box bearing purchase order no, pl no., description, drg./spec./part no., qty., firm's name & address, date of despatch etc. the transit damangeif any shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery] ]
Tender For supply of set of ermeto fittings for air brake of lhb coaches. as per drawing : mpleflhbfur version 6 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of heavy duty pneumatic piping arrangement with fiba for rcf bogie fitted air spring in secondary suspension ss fittings as per drg. no.: lw36189. material supply as per drg./part no. material details are as follows: (1) street elbow, icf/std 3-5-032, item no.: 2, (qty.: 4 nos.) (2) female elbow connector, icf/std 3-5-021, item no.: 2, (qty.: 2 nos.) (3) hex nipple, icf/std 3-5-016, item no.: 4, (qty.: 5 nos.) (4) male connector, icf/std 3-5-016, item no.: 4, (qty.: 3 nos.) (5) stand pipe elbow, ermeto evw22lomdcf, (qty.: 1 nos.) (6) male stud connector, ge22lr3/4kegcf, (qty.: 1 nos.) (7) ss304 22 mm od, 2.5 mm thick, 2.5 mtr tube pipe. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of ermeto fittings for air brake of lhb gs coaches., as per drawing mplefgslhbfur version 6, as per rcf set list attached. [ warranty period: 48 months after the date of delivery ]
Tender For supply of set of ermeto fittings for air brake of lhb gs coaches., as per drawing: mplefgslhbfur version 7, packing instruction: set of ermeto fittings:- each item of the set should be packed individually after covering the threaded portion with suitable cap to prevent thread damange in bio-degradeable polythene packet invariably clearlymentioned the part no. of the item on it. all the items of set then collectivelly packed in card board box of sufficent strength, further tied with suitable no. of nylon strips. a well protected list should be pasted on each box bearing purchase order no, pl no., description, drg./spec./part no., qty., firm's name & address, date of despatch etc. the transit damange if any shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of ermeto fittings for air brake of lhb coaches., as per rcf list : mpleflhbfur version 6, packing instruction: set of ermeto fittings:- each item of the set should be packed individually after covering the threaded portion with suitable cap to prevent thread damange in bio-degradeable polythene packet invariably clearly mentioned the part no. of the item on it. all the items of set then collectivelly packed in card board box of sufficent strength, further tied with suitable no. of nylon strips. a well protected list should be pasted on each box bearing purchase order no, pl no., description, drg./spec./part no., qty., firm's name & address, date of despatch etc. the transit damange if any shall be at the cost of supplier. [ warranty period: 30 months after the date of delivery ]