CTN :45413511
12 Jun, 2026
NA
Tender For corrigendum : tender for supply of equipment material design erection testing commissioning for sop to ms shyam indus pvt cted">ltd co prittam singh at vill baghni by prov 1104kv 25kva sstn aw 3ph
cted">lt line in vill baghni in e se
ction bhadwar under esd hpsebl nurpur. t - 25 kva trsanformer, prov. distribution transformer (ordinary), 11/0.4 kv, 25 kva ., prov. steel tubular poles (9 m, working load > 200 kgf/m ) ., prov. muffs with concerete filling, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for incomer line, prov. ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov. x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & go switch, prov. transformer bed, be
cted">lting & knee bracing, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for transformer bed, prov. x-arm [channel iron (100x50x6 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (35x35x5 mm), length : (460 ) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov. transformer
cted">lt distribution box and go switch fixing assembly, prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov. go switch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov. go ab switch unit (11kv, 400a, 25 ka ) tripple pole o/d type, prov. d.o fuse unit, prov. lighting arrester, 9 kv station class (porcelain type), prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), prov. stay set complete, prov. stay wire (7/3.15 mm) (6.0 kg per stay set), prov. pipe earthing set, prov.
cted">lt distribution panel box with mccb(160a, 10ka, 4p, 1no) & sfu(32a, 5no, rewirable), prov. half clamp (m.s. flat 50x6 mm), prov. full clamps (m.s. flat 50x6 mm), prov. nuts and bo
cted">lts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. aluminium thimble, prov. copper thimble 35 amp, prov. danger plate, prov. barbed wire, prov.
cted">lt cable (3.5 core) 50 mm , prov. energy
meter 3- , 4 wire
ct operated static tri-ve
ctor
meter with box(
ct-100a), prov. aluminum paint., prov. 6/1/3.35, 50mm ., prov. constru
ction of foundation of transformer, ere
ction of 25 kva s/stn. i.e. digging of pit for pole & earthing two no. poles & 3 nos. for earth drilling of holes in x-arms, preparation of plateform str. members c.i., a.l. i.e. x-arms & k.b. set, erre
ction of d/p, concreating of rcc muff erre
ction of plateform, erre
ction of x-arms, d.o., l.a., mccb, switch
cted">lt box, energy
meter, erre
ction of transformer, earthing conne
ction to g.o. switch, transformer l.a. etc., erre
ction of stay set, jumper, pipe earthing 3 nos set, l.t. cable, barbed wire and painting complete in all respe
ct., transportation charges @10490/-, prov. transportation charges & mannual carriage of 25 kva pole mounted distribution s/stn. (line length 0.500km), ere
ction of 3- ph.
cted">lt line, prov. aaac (7/3.15 50mm ) { neutral condu
ctor including 1% (sag, jumpering and wastage}, prov. steel tubular poles (8 m, working load > 200 kgf/m )., prov. muffs with concerete filling, prov. shackle insulator with d-iron, prov.
cted">lt stay set i/c egg insulator., prov. nuts and bo
cted">lts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. stay wire, prov. g.i wire no 8swg, ere
ction of 8 mtr. st pole single stru
cture i.e. digging of pit, fixing of insulator, x-arms, k.b. set, top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respe
ct., sagging of condu
ctor i.e. laying, stringing and sagging & binding with insulator (single wire per km)., sagging of g.i i.e. laying, stringing and sagging & binding with insulator (single wire per km)., ere
ction of stay