Get complete information related to latest Luggage Scanner Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Luggage Scanner Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Luggage Scanner Tenders.
Tender For lwscz shell kit (a) lscz - one coach set of roof, 2 mm sidewall and end wall for lwscz coaches. 1) sidewall assembly to drg.no. (329) icf/sk3-1-4-091, alt 'b' , col- 1 - 1 no. 2) roof assembly to drg.no. (lwscz) 73916001, alt 'd', col-i - 1 no. 3) end roof assembly to drg.no.(ls) 58116066, alt 'h', col-i - 2 nos. welding pin to drg no 81410012 alt nil to be assembled on roof and sidewall 4) endwall to drg.no. (lslrd) 74115001, alt 'j'-2 nos. the firm shall fulfil the requirement as per icf//md/specn.200, issue status 01, rev 04 with amendment no. 01. the firm shall fulfil the requirement as per icf/md/spec-315, issue status-01, rev.00, amendment no. 01. firm has to supply roof and sidewall without applying etch primer. (b)one coach set of body shell items and partition frames for lwscz2(814) coaches to drg nos, 1. 81410002, alt nil- 1no. 2. 81410005, alt 'e'- 1 no. 3. 58210036, alt 'b'- 2 nos. 4. 67010011, alt 'a'- 2 nos. 5. 58110017, alt 'c'- 2 nos. 6. aag10457, alt nil- 4 nos. 7. aab10338, alt nil-16 nos. 8. 58110015, alt 'a'- 6 nos. 9. 58110016, alt 'a'-3 nos. (c) under frame arrangemnt to drg no. 81411001 alt 'f' the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". c) packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer side down. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly& welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor withcross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : shell kit for memu dmc2 jk 946 a. roof assembly 94416001 000 01, alt 'nil' - 1 no. location of sidewall 94414001 000 01, alt 'nil' - 1 no. end construction pail end 94615001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status 01, rev.0 0with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu dmc2 jk 946 to drawing nos: 1. 94410003 000 01, alt 'a' - 1 no 2. 74510257 000 01, alt 'nil' - 1 no 3. 94410004 000 01, alt 'nil' - 1 no 4. 74510045 000 01, alt 'nil' - 1 no 5. 94410005 000 01, alt 'nil' - 1 no 6. 94410002 000 01, alt 'b' - 1 no. 7. 94410076 000 01, alt 'nil' - 1 no 8. 94410072 000 01, alt 'nil' - 1 no 9. 94410054 000 01, alt 'nil' - 2 nos. c. under frame arrangement 94411001 000 01, alt 'a' - 1no. firm shall fulfill the manufacturing facility as per icf/md/specn-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : supply and installation of 3 phase hog sequence testing kit with 60kva transformer for inspection of lhb ac and non-ac coaches with following specifications. 1) hog sequence testing kit shallbe suitable for input supply of 3 phase, 415v with neutral, 125a four poles mccb shall be provided forinput supply side protection along with suitable rated supply chord (pvc) of length 5 meters. 2) hogsequencetesting kit shall be having output supply provision of 3 phase with neutral, 750v ac with ivcoupler socket. 3) uic jumper coupler shall be having 16 pin male connector to suit conventional powercar socket, the cable length shall be 3 meters. 4) hog sequence testing kit shall be having auto overvoltage shut down facility. 5) hog sequence testing kit shall be having the output capacity of 60kva forpower side and 72 to 110v dc for control side. 6) hog sequence testing kit shall have in built surgeprotection. 7) hog sequence testing kit shall be having 4 polemccb protection at 750v side, withcurrent rating 125a. 750v ac grade not available 690v mccb shall be used. 8) hog sequence testing kitshall be having independent on/off and rest provision for each output. 9) hog sequence testing kitshall be having proper earthing protection. 10) the power circuit and control circuit arrangement shall beloco part of drawing entered in annexure 1. 11) hog sequence testing kit shall be supplied with fourwheels heavy duty trolley two revolving and two fixed one. 12) hog sequence testing kit shall bepowder coated paint of aqua green colour. 13) hog sequence testing kit shall be supplied along withuser manual. 14) demonstration shall be arranged free ofcost at your side. 15) hog sequence testingkit shall be suitably designed at both sides. 16) hog sequence testing kit shall be labeled withnecessary danger/safety precaution instructions wherever necessary. pre approval of drawing & bom to be taken from consignee before supply of item. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : procurement of of spares of patriot make crane for mh asset - seal oil sl, o ring, o ring, o ring, seal oil sl, o ring, o ring, o ring, o ring back up, o ring, o ring back up, o ring, hose assembly, hose assembly, hose assembly, main aux hydraulic pump, boom pump, swing pump, anti 2 block system (for main & aux)-hyd, fleeting sheave, slew system high pr.filter, slew pump, bushing- lever housing, lever arm-dog, retaining plate, brake band assembly, sheave for pendant block boom hoist, pin sheave 31/2" dia 24" long for pendan, actuator stub plate, pin sheave 31/2" dia for main frame, nyloc washer 4" od, nyloc washer 4" od 31/2"id and 1/8" thic, kit directional control valve, main/ aux hydraulic pump, boom hoist & swing pump(a tandem unit), check valve, gear coupling ( pump drive adapter), regulator valve, hydraulic oil cooler, repair kit of 4 way 3 position tandem, repair kit of rp70 pilot operated relief, repair kit of 4 way 3 position tandem, repair kit of 4 way 3 position tandem, joystick valves, hydraulic valves, pilot dump valve, counter balance valve, pressure reducing valve, radiator, engine, hydraulic tank breather, kit suction filter assembly, bushing lever housing, lever brake band, retaining plate, suction filter, hydraulic oil filter, air intake filter, valve main, valve swing, air filter, pilot valve, joystick valves, winch motor, winch motor, engine oil pressure gauge, 2 pos/ 2 way valve, shuttle valve, gauge, kit , return filter assembly, hydraulic oil pressure guage, drive pinion, swing gear box, hydraulic swing motor, hydraulic swing brake, triple section hydraulic pump, boom hoist winch-include luffing pawl), friction plates for boom winch brake, brake discs, u-cup seal, piston back up ring, brake spring, o-ring, back up washer, o-ring, slew hyd.pre.gauge, o-ring/seal kit, o-ring/seal kit, o ring / seal kit, o ring / seal kit, engine foot throttle, gauge, pilot pressure, hoist selector valve, joy stick pressure gauge, slew hyd. pr. gauge, hand pump, air pressure gauge, eng start valve, engine shutdown valve, foot valve, radiator, cable emergency stop, return filter assembly, kit, suction filter assembly, kit, diesel and hydraulic oil tank gasket, air pressure gauge, pilot dump valve, pressure reducing valve, 2 position 2 way valve, shuttle valve, engine oil pressure gauge, engine stop cable, water temp.gauge, magnetic pick up, joy stick, main/ auxiliary, joy stick , boom / slew, clamps for main,aux.& boom wire rope, swing brake, limit switch assembly, wiper motor with arm, blade and switch, anti 2 block system ( main & aux. hoist, compressor safety valve, drain valve, horn switch - push type, selector valve, pilot pressure valve, kit hydraulic directional valve, pilot pressure valve, gauge,hyd control - pressure., hydraulic oil cooler, return filter assembly, kit, suction filter assembly, kit, swing gear box, swing drive pinion, swing brake, joy stick, main/ auxiliary, joy stick , boom / slew, pilot dump valve, pressure reducing valve, 2 position 2 way valve, shuttle valve, engine stop cable