Web Analytics Made Easy - StatCounter

Luggage Trolley Tenders

Get complete information related to latest Luggage Trolley Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Luggage Trolley Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Luggage Trolley Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45725018 Due date: 13 Jul, 202613 Jul, 2026 NA
Tender For supply of platform luggage trolley (similar to the specification attached) [ warranty period: 36 months after the date of delivery ] ]

CTN :45514745 Due date: 01 Jul, 202601 Jul, 2026 NA
Tender For corrigendum : cs/rmo/2026/2089-90/steel item - linen trolley with two bucket (50 ltr. each) 8” wheel 4,aproximate weight 10 kg (iron powder coated) oxygen cylinder trolley d type/ 60 cft (iron powder coated) luggage trolley capacity 300-350 kg 4 wheel 8” aproximate weight 20 kg (iron powder coated) double locker narcotic drug cabinet with 2 shelf aproximate weight 20 kg (iron powder coated) 36 x18x15 inch wall mounted iron rack 6 shelf size15x36x72inch slotted angle (iron powder coated) cabinet 6/12 locker size15x36x72inch (iron powder coated) office chair office table computer table revolving chair ware house rack 4 layer(shelves) crc sheet size 200x60x200cm capacity 350kg each layer 3 bucket mopping trolly bmw trolley s.s. with three bucket (30 ltr. each bucket) almirah 5 shelf size15x36x72inch with heavy duty (iron powder coated) hydrolic hand pallet trolley, 3 ton capacity 1150x550 mm fork size spot light with stand for examination procedure ( high intensity led, cri >90 power supply 220-240v ac ,50 hz , low heat genration 01 year warrenty lux meter

Central Government/Public Sector

CTN :45605291 Due date: 17 Jul, 202617 Jul, 2026 NA
Tender For supply of electric tugs for moving material in trolley(1.5 ton capacity) as per reference letter sl. no-5 and vb allocation no-p4275 4 000 502vb 005 000 specification; type towing applications for luggage trolleys motor type electric configuration towbarless domain for airport towing capacity 1,500 kg(3,307 lb) working speed 4.7 km/h(2.9 mph) description; motor24 dc, 600w trekkracht1500 kg ,regulator programmable regarding speed and acceleration maximum speed4.7 km/h, battery exchangable, 24 volt, 22 ah charger external tires full rubber ?250x80 mm weight105 kg frame steel, powder coated width483 mm length876 mm adze height750-1177 mm fold in hight:770 mm [ warranty period: 30 months after the date of delivery] ]

CTN :45582457 Due date: 26 Jun, 202626 Jun, 2026 NA
Tender For supply of tea serving set , entrance mat foot mat , desk organizer pen stand , decorative door curtain , window curtain , sleeping mattress , cycle , wall clock , water drinking dispenser , tiffin carrier milton , food carrier steel , digital wall clock , tea pan , dinner set , induction oven , upholstered chair red cushion chair , blind curtain , stabilizer , steel box 42 x 24 x 18 inch , lock , steel box 43 x 12 x 11 inch , steel box 10 x 10 x 5 inch , heavy duty iron box , flex board 6 x 4 , electric kettle 1 ltr , white bed sheet , carpet 9 x 6

CTN :45484122 Due date: 24 Jun, 202624 Jun, 2026 NA
Tender For supply of dispensing unit , pharmacy refrigerator with controller , luggage trolley , air conditioner , pallets

Central Government/Public Sector

CTN :45470674 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For supply of electric tugs for moving material in trolley(1.5 ton capacity) as per reference letter sl. no-5 and vb allocation no-p4275 4 000 502vb 005 000 specification; type towing applications for luggage trolleys motor type electric configuration towbarless domain for airport towing capacity 1,500 kg(3,307 lb) working speed 4.7 km/h(2.9 mph) description; motor24 dc, 600w trekkracht1500 kg ,regulator programmable regarding speed and acceleration maximum speed4.7 km/h, battery exchangable, 24 volt, 22 ah charger external tires full rubber ?250x80 mm weight105 kg frame steel, powder coated width483 mm length876 mm adze height750-1177 mm fold in hight:770 mm [ warranty period: 30 months after the date of delivery] ]

CTN :45057581 Due date: 04 Jun, 202604 Jun, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot

State Government

CTN :45376132 Due date: 02 Jun, 202602 Jun, 2026 23.84 Lacs
Tender For providing and supplying luggage trolley and security tray for newly construction airport terminal building at nani daman. (2nd call)

CTN :45311746 Due date: 30 May, 202630 May, 2026 NA
Tender For supply of planetary gear box and spares - horizontal foot mounted planetary gear box spares for bagasse elevator make- top gear transmission pvt ltd. model: 3725 hx mounting: foot red ratio: 166.95:1 rated torque: 224424 nm input: solid input power: 55kw/1440 rpm output speed- 8.62 rpm as per drawing no. 110221-2 rev 1 , input shaft coupler, 1st stage, 1st stage ring, 1st stage sun gear shaft, 2nd stage, 2nd stage outer ring, 2nd stage sun gear shaft, motor flange, 2..horizontal foot mounted planetary gear box spares for main bagasse carrier make- top gear transmission pvt ltd. model: 3850 hx mounting: foot red ratio: 154.31:1 rated torque: 285612 nm input: solid input power: 75kw/1440 rpm output speed- 9.33 rpm as per drawing no. 150221-1 rev 0 , input shaft coupler, 1st stage, 1st stage ring, 1st stage sun gear shaft, 2nd stage, 2nd stage outer ring, 2nd stage sun gear shaft, motor flange, 3..gear box for irc no. 3 spares sr. no.-3670hx ratio:- 189:72:1 code no. ffh3670hx189.72408 make-top gear transmission , input shaft coupler, 1st stage, 1st stage ring, 1st stage sun gear shaft, 2nd stage, 2nd stage outer ring, 2nd stage sun gear shaft, motor flange, 4..gear box for irc no. 1 & 2 spares sr.no. hg-24520 mfg year- march 2021 type- p3-24 10202057 ratio: 225/1 ip rpm 1500 oil gr. iso vg 320 make- premium transmission pvt ltd , input shaft coupler, 1st stage, 1st stage ring, 1st stage sun gear shaft, 2nd stage, 2nd stage outer ring, 2nd stage sun gear shaft, motor flange, 5.rbc gear box (complete) make- premium transmission sr.no- hgf-81207 mfg year-16.01.2022 type- sxh3-20 rhb-acw ratio-35.5:1 p2 rpm-1500 wt-290 kg , 6..surplus gear box (complete) make- premium transmission sr.no- hgf-81206 mfg year- 16.01.2022 type- sxh3-16 rhb-acw ratio-35.5:1 p2 rpm-1500 wt-164 kg , 7... bc-01 gear box (complete) make- top gear transmission model- 3725hx ratio- 166.95 code no- ffh3725hx166.9571904 sr.no- 21030145 , 8..rav gear box complete make- radicon type- amd 07-5s kw- 0.75 sr.no- 19/347251 rpm- 1450 actual ratio- 75.121 output torque- 334.0 , 9..batch pan mech. circulator gear box complete. sr. no. hgf-77309 type-vb3sa-250 ratio: - 31.4: 1p1 i/p rom: - 1500, type- helical make-premium transmission. , 10..gear box below complete. sr. no. hgf-77309 type-vb3sa-225 ratio: - 31.4: 1p1 i/p rom: - 1500, make-premium transmission. , 11. planetary gear box complete model: 420horgm sr.no: 21037406 ratio: 1459.84:1 make- top gear transmission , 12. magma mixer planetary gear box complete model: 250horgm sr.no. 210374428 ratio: 87.45:1 make- top gear transmission , 13.. lime preparation tank planetary gear box with motor complete in all respect model: 3280 raio: 92.016:1 make- top gear transmission , 14..raw sugar pugmill planetary gear box with drive complete in all respect model: 280horgm ratio: 358.91:1 make: top gear transmission , 15..slat conveyor u type gear box with motor complete in all respect model: a-337 type- u type ratio: 30:1 make: premium , 16.. sugar bag conveyor u type gear box with motor complete in all respect model: u-500 type: u type ratio: 50 make- premium , 17..sugar bag conveyor u type gear box with motor complete in all respect model: u-600 type: u type ratio: 60 make- premium , 18..sugar bag conveyor u type gear box with motor complete in all respect model: u-400 type: u type ratio: 50 make- premium , 19..sugar bag conveyor u type gear box with motor complete in all respect model: u-800 type: u type ratio: 70 make- premium , 20..sugar elevator planetary gear box (one side rotation) with motor complete in all respect model: 2300hbx ratio: 45:1 make: top gear transmission , 21..fbd elevator planetary gear box (one side rotation) with motor complete in all respect model: 3260hbx ratio: 61.62:1 make: top gear transmission , 22..conveyor belt gear box with motor complete in all respect model: 600 vorxgm ratio: 2856.2 make: top gear transmission

State Government

CTN :45301143 Due date: 30 May, 202630 May, 2026 23.84 Lacs
Tender For providing and supplying luggage trolley and security tray for newly construction airport terminal building at nani daman.
 Loading, Please wait...

Connect us via What's Up