Get complete information related to latest Magnetic Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Magnetic Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Magnetic Valve Tenders.
Tender For tender for ci valves/ repair of non return valve(nrv) ,pump spare parts & repairs/ bearing ,carriage charges , .labour of pump set opening and fitting. / labour charges ,pump bush steel new / pump bush
Tender For procurement of various spares for fd fans in ahp 210 mw during unit-3 coh at cstps, chandrapur - insertion ring, inner race d35, flexible lovejoy rubber spider, cplng fl lvjy ci with rubber spidr, flexible lovejoy coupling, coupl coupling, valve assy nrv 150 nb, b1 sl fan shaft lock ring metallic, oil remover avas, o ring, blr fd 0 0 si mmer ring ba, blr fdfan 0 0 angular ring, simmer ring for main bearing, blr fd 0 0 ermeto coupling, nut ring dia etc..
Tender For tender for supply of mist eliminator : -mist eliminator box including 6 pass pvc mist eliminators and necessary supports and angle frame as per attached specification and drawing for control building -3 air washer , spray nozzle header bank assembly along with ss spray nozzles as per attached specification and drawing for control building -3 air washer. , suction filter frame as per attached specification and drawing for control building -3 air washer , pump drain line with flanges and fittings as per attached specification sheet for control building -3 air washer , pump suction line with flanges and fittings as per attached specification sheet for control building -3 air washer , pump discharge line with flanges and fittings as per attached specification sheet for control building -3 air washer , pump base frame as per attached specification sheet for control building -3 and control building -4 air washer. , suction gate valve of size 100 nb as per attached specification and drawing for control building -3 and control building -4 air washer , discharge globe valve size 80 nb as per attached specification and drawing for control building -3 and control building -4 air washer. , suction strainer 100 nb as per attached specification and drawing for control building -3 and control building -4 air washer , discharge non return valve -nrv- 80 nb as per attached specification and drawing for control building -3 and control building -4 air washer. , removal of the existing mist eliminator bank , spray nozzle headers , suction filter bank , pump suction and discharge lines , its valves and strainers , drain line and pump base frame and disposal of same to waste disposal facility for control building -3 airwasher. , fabrication , installation , erection of the mist eliminator bank , spray nozzle headers , suction filter bank , pump suction and discharge lines , including installation of the valves and strainers , installation of the drain line and pump base frame for control building -3 air washer , mist eliminator box including 6 pass pvc mist eliminators and necessary supports and angle frame as per attached specification and drawing for control building -4 airwasher. , spray nozzle header bank assembly along with ss spray nozzles as per attached specification and drawing for control building -4 air washer. , suction filter frame as per attached specification and drawing for control building -4 air washer , pump drain line with flanges and fittings as per attached specification sheet for control building -4 air washer. , pump suction line with flanges and fittings as per attached specification sheet for control building -4 air washer , pump discharge line with flanges and fittings as per attached specification sheet for control building -4 air washer. , removal of the existing mist eliminator bank , spray nozzle headers , suction filter bank , pump suction and discharge lines , its valves and strainers , drain line and pump base frame and disposal of same to waste disposal facility for control building -4 air washer. , fabrication , installation , erection of the mist eliminator bank , spray nozzle headers , suction filter bank , pump suction and discharge lines , including installation of the valves and strainers , installation of the drain line and pump base frame for control building -4 air washer