Tender For provision of project managementconsultancyservices for office accommodation cum training building and residential accommodation for nadfm pune
Tender For consultancyservices for feasibility study and preparation of detailed project report for development elevated corridor part of the high-speed corridor from surat-sachin-navsari road km 13/4 to 21/4 under surat r&b division no.1, surat gujarat
Tender For consultancyservices for preparation of feasibility report and detailed project report for construction of greenfield 4 lane of shimla near tara devi to shalaghat near village kolaka section of nh-205 old nh-88 from km 0.000 to km 28.800 tentative le
Tender For corrigendum : consultancyservices for preparation of detailed project report (dpr) for construction of gola ring road in the state of uttar pradesh.
Tender For work of preparation of detailed cum detailed project report for re-designing of sewerage network of sector-9, jhajjar including design calculation, preparation of bill of quantities, preparation of layout plan of proposed sewerage line, cross section
Tender For corrigendum : selection of consultant for preparation of detailed project report for development of tourist destinations and restoration of mining affected area with karnataka mine environment restoration corporation under cepmiz scheme construction of natural treatment yoga and dhyana centre at sanganakallu bellary
Tender For consultancyservices for preparation of detailed project report and pre-construction activities for melli to singtam section of nh 210 in the state of sikkim
Tender For rfp for selection of consultant for preparation of alternative analysis report and detailed project report for transit corridors in ranchi jharkhand
Tender For block level survey for the command area of uduthorehalla reservoir project canal with rs maps to show the area proposed for the fic network to mark the field channels on the rs maps which shall correlate on the ground profile the fics shall be preferably along the boundaries as per the field conditions in the alignments suitable cross drainage and structural works are to be proposed at required the position and designed preparation of estimates for fics collection of documents like rtc etc with detailed drawings and designs comprehensive report l sections of fic and preparation of autocad maps joining map and individual sketches and superimposing of sketches on the rs map etc