Web Analytics Made Easy - StatCounter

Material Handling Work Tenders

Get complete information related to latest Material Handling Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Material Handling Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Material Handling Work Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :40534153 Due date: 09 Jun, 202509 Jun, 2025 16.93 Lacs
Tender For repairs to jere hamam and langer khana area at fatehpur sikri, agra -supply of materials - supply of 1st quality well burnt unslaked lime in a sealed air tight bags including transportation lead, lift & stacking at site. (packing in bags 25kg & 50 kgs) (rate including g.s.t.), supply of fine crushed brick surkhi obtained from 1st class well burnt bricks including transportation lead, lift & stacking at site for measurement. (rate including g.s.t.), supply of sieved coarse sand (screened) free from lumps, dust, silt & organic impurities. including transportation lead, lift & stacking at site for measurement. (rate including g.s.t.), belgiri (rate including g.s.t.)., gum babool (rate including g.s.t.)., gur (rate including g.s.t.)., r.r. stone nominal size (rate including g.s.t.), red sand stone 65mm thick (bansi paharpur qurry).(rate including g.s.t.)., brick ballast of lakhori brick/ 1st class brick 40mm size (rate including g.s.t.), water proofing compound (rate including g.s.t.)., clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (rate including g.s.t.), earth work in excavation by manual means in foundation trenches, including dressing of sides and ramming of bottoms, getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (rate including g.s.t.), taking out of angle iron frame 40x40x6 mm having 12mm square bar with spikes 1.25mtr high and hold fast by manual labour and stacking within 50 meters lead etc. complete in all respect. (rate including g.s.t.), taking out stone masonry manually bit by bit without disturbing to the adjoining structure including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge : in cement mortar. (rate including g.s.t.), random rubble stone masonry with hard stone in super structure in cement mortar 1:6 (1cement 6 c. sand) including pointing, t&p, scaffolding etc. complete. (rate including g.s.t.), cr stone masonry with 70% available stone and 30% new stone in super structure and plinth with cement mortar 1:6 (1 cement: 6 coarse sand), pointing, scaffolding etc. (rate including g.s.t.), providing and laying in position cement concrete of specified grade 1:2:4 (1 cement: 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size). (rate including g.s.t.), pdg. 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 (1 cement : 5 c.sand) and a top layer 6mm thick cement plaster 1:3 (1cement : 3 c.sand) finished rough with sponge. (rate including g.s.t.), repairing of old existing grills in boundary wall including supply of required materials, welding, fabricating & labour etc. complete. (rate including g.s.t.), providing & fixing m.s. gates of required pattern with angle iron frames (50x50x6)mm size graded with 10 cm c/c sq. bars 16mm size pointed at the top extra with same curved bar and each frame having gusset plate 6mm thick at corners & center and provision for hinges and locking arrangement with supply of r.s. joist (200x100x5.7)mm section for hanging m.s. gate including nut bolts, cutting fabricating welding etc. complete. (rate including g.s.t.), providing & fixing m.s. grill of required pattern with angle iron frames (40x40x6) mm size graded with square bars 12mm size 10 cm c/c pointed at the top with extra curved bar and each frame with (40x40x6)mm. size horizontal hold fast welded with lower posts and fixing angle iron vertical post (50x50x6)mm size and nut bolts including cutting fabricating welding etc. complete. (rate including g.s.t.), coursed rubble masonry with hard stone (first or second sort) in facing up to 22.50 cm thick random rubble masonry in back side in superstructure above p

Central Government/Public Sector

CTN :40533434 Due date: 09 Jun, 202509 Jun, 2025 NA
Tender For material management and materials handling works at 2x660 mw mahagenco koradi project nagpur district maharashtra india

Central Government/Public Sector

CTN :40555813 Due date: 10 Jun, 202510 Jun, 2025 NA
Tender For providing of custom bid for services - store material handling work in stm dept

Central Government/Public Sector

CTN :40556935 Due date: 21 Jun, 202521 Jun, 2025 NA
Tender For providing of custom bid for services - job contract for material handling work, mixing, blending of raw materials, shifting of files, office furniture & fixture and other materials, small equipment from various laboratories/ departments of rdcis, sail, ranchi for..

Central Government/Public Sector

CTN :40533827 Due date: 10 Jun, 202510 Jun, 2025 1.88 Lacs
Tender For various material handling work including 2 nos. of bed -plate fabrication , reinstalling of damaged 8 inch and 6 inch pipe (vertical range) and bend and short piece refabricating work at adic, kusunda area

Central Government/Public Sector

CTN :40248539 Due date: 04 Jun, 202504 Jun, 2025 NA
Tender For corrigendum : material management and materials handling works at 2x660mw dvc raghunathpur rtps phase ii west bengal india

Central Government/Public Sector

CTN :40501377 Due date: 09 Jun, 202509 Jun, 2025 2.13 Lacs
Tender For cleaning, loading and unloading and material handling works including cleaning of operator cabin of 1 no. p and h-1900al shovel of khadia project for a period of 313 days.
 Loading, Please wait...

Connect us via What's Up