Get complete information related to latest Mixer Dryer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Mixer Dryer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Mixer Dryer Tenders.
Tender For supply of xlpe cable for working voltages up to and including 1.1 kv as per is 7098 (part 1),fixed clean agent gas based fire suppression system
Tender For corrigendum : tender for supply of refilling of fire suppression system novec make : : -supply and refilling of ul listed fk-5-1-12 novec 1230 gas , valve testing and o ring change , hydro pressure testing of 80 ltr cylinder , system dismantling , reinstallation and spare cylinder charges for back up including freight
Tender For construction of additional qtrs for staff/officers of reserve bank of india at char imli, bhopal, mp in epc mode-iii. sh:- construction of 72 nos. grade a qtrs (splus9), 10 nos. grade d&e&1 no. grade f qtrs. (splus7). 1 no. rd bunglow(gplus1), 28 nos. class-iii qtrs(splus7) facility block (gplus4), swimming pool, 33kv electrical sub station & building, 2 nos. gate & security blocks i/c internal & external w/s, s/i, e/i and development works & bulk services of roads, footpath, drains, retaining walls, ug sump & pump room, sewage treatment plant, upgradation of main campus boundary wall, cctv system, networking, dg set, fire fighting system, fire alarm system, street lighting, lifts, ev charging, owc, domestic & flushing water pumping system, solar pv system, boom barrier, gas suppression system, signages, ups, mechanical ventilation and pressurization system, bms, horticulture work, site office, barricading construction site i/c demolishing of existing residential d block and temporary structure. (package-1)
Tender For corrigendum : design, supply, erection, testing, commissioning of co2 gas fire suppression system of stage-1 and 4 ps.refilling the co2 cylinders with complete overhauling of fire alarm system, supply of detectors,testing,commissioning of co2 gfss for stage-ii ps