Tender For providing of goods transportation service - monthly based service - outside city within state; construction material, household/office, machinery & equipment; open body lcv truck
Tender For corrigendum : electro-mechanical works of 3x100 mw lakhwar mpp which includes detailed design & engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, transportation, insurance till commissioning, delivery at site, site storage and preservation, erection, testing and commissioning, performance testing, field acceptance testing, training of employer s personnel, handing over and guarantee of two years for the electro-mechanical equipment & systems , on epc (engineering, procurement & construction) basis.
Tender For transportation and shifting (manual and/or mechanical) of all types of telecom materials like underground cable, of cable, plb, equipment, drums, office furniture etc. loading/unloading and stacking/unstacking of telecom materials
Tender For e-tender for bi-annual contract for the work of loading, transportation & unloading of various capacity substation equipment under hvdc indoor division, chandrapur, msetcl, as and when required basis for the f.y. 2025–26 (excluding transportation of converter transformer & smoothing reactors & its accessories). estimates cost:- limited to rs. 10,00,000/- (inclusive of all taxes)
Tender For corrigendum : supply, design, engineering, manufacture, fabrication, testing at manufacturers works of equipment and materials, loading, transportation and delivery, unloading of 04 nos. 132/33 kv, three phase power transformers baijnath and dharamshala
Tender For providing of goods transportation service - monthly based service - outside city within state; machinery & equipment; 1 mt muv for p.way and no p.way metriral with sitting capacittyt of 4/6 persons 4 strokes 4,cylinders engine
Tender For corrigendum : drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 604.877 lbcm of in-situ ob (which includes 4.323 lbcm of top soil, 12.212 lbcm of sub soil, 2.866 lbcm of bc soil, 567.257 lbcm of hard ob and 18.219 lbcm of coal) and re-handling of 1.491 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 4000 dozer hours and 1,94,000 rmt of drilling at srp oc-ii expansion project mine, srirampur area during a period of 36 months.