Tender For supply of 25vkpc006 c c - brush bracket assembly for 19 kw motor , fan , sw temp gauges , sight glass part no. 06001 avail.as com.as.kit-item-209 , set shut-off valve nw38 part no. 08398 , set of gaskets for condenser 20tr ac plant for ekm submarine , tube for evaporator for 20 tr ac plant for ekm submarine , 3 way isolation valve for pressure gauges , refrigerant piping fittings 20tr ac plant for ekm submarine , rear outer bearing cover , sw pressure gauges , temperature gauge 100 dial -30 to 50 deg c , starter cum control panel for20tr ac plant for ekm submarine , terminal connectors with din rail 35 wago 6 sq mm 282-101 , synthetic ref oil savsyn2068 , gasket cover window he side , gasket cover window filter side , gasket cover top hsg dist. block , gasket cover top hsg manifold block , nut hex m24x3 , bolt hex std m20x2.5x120l , fan , compressor discharge temp gauge , compressor suction temp gauge , mccb merlin gerin 160 a 4 pole ns160n 4p30640 coil 24v dc , starter card elmot for 45 kw dc panel , terminal block for 5.5 kw motor , core for filter drier , rubber bellows for sw pump discharge , rubber bellows for sw pump suction , shaft for sw pump , mechanical seal for sw pump , pressure gauge 65 dial -1 to 15 kg-cm2 for r134a , oil seperator danfoss oub 4 for 2 x 2.1 tr ref plant , sea water pump be pump a3610m for 2 x 2.1 tr ref plant , solenoid valve danfoss evrs3-24 vdc coil , thermo exp valve sporian w je-80 jc charge 1-5-8x1-5-8inch ods , rotor setl/d 1.45 part no. n0900408030 , metaflex coupling for compressor for 144 tr ac plant , valve check type 125 nb wafer type , core for filter drier sporian rc10098 , thermostatic expansion valve danfoss teat 85-33 , shock mount irmra akcc-400e , valve plate assembly part no-08436 , set shaft seal part no 08008 , set oil pump part no 08044 , set piston dia 70 part no 08035 , set gaskets part no 08072 , set connecting rod part no 08307 , set oilsump heat 80w 220-240v part no 08425 , set capacity regulator 24 v dc , set of v belts , oil separator danfoss oub 4 for 2 x 2.1 tr refrigeration pla , valve angle type 1-2inchntp(m) x 1-2inch flare , safety valve 1-2inchnpt m set pressure 12.5 kg-cm2 r134a , valve angle type 1-4inch ntp m x 1-4inch flare , thermostatic exp valve gfe-1-2jc charge 1-4inch x 1-2inch flare , thermostatic exp valve gfe-1.1-2jc charge 1-4inch x 1-2inch flare , vibration eliminator 5-8inch ods , vibration eliminator 1-1-8inch ods , temp switch danfoss rt34-25 to 15 deg c , hrc fuse link ge ns4 4a with nh type fuse base , control transformer tape wound 415 v/110 v 150 va , filer drier core , safety valve condenser , liquid injection solenoid valves , hex head screw m6x125l , lp-op cutout mp55r r12-r22 , horizontal shell and tube type condensor , brazed plates type direct expension r134a evaporator , safety relief valve for condensor , thermostatic expansion valve , open end spaner set , temperature transducer , compressure suction pressure gauge , compressore discharge pressure gauge , element complete with o ring , pump trailing pompe pollard type 100 pr-60-100 c-g-n , direction of control valve with manual override
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For supply of b veh spares d d - fuel filter cum water separator , assy of door shell lh , oil separator , glow box lock assy , repair kit msp 3 40 quadruple sys , relay solid state , stop light switch , s a fuel hose , fog lamp switch , gauge pressure oil indicator , jublee clip , clamp
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f