Tender For purchase of sports exercise physiology lap equipments - cardiopulmonary exercise testing system system should be compact can be used in laboratory operation and low maintenance costs and easy servicing. system should be state of the art computerized telemetry breath test analyzer for on-line breath by breath measurement of exercise test of respiratory system to measure following parameter: time, ve, bf(rr), hr, feo2, feco2, peo2, peco2, vo2, vco2, ve/vco2(eqco2), ve/vo2(eqo2), rq(rer), vd/vt, vo2/kg, vo2/kg/hr, met, watt(work), hr, ttot, ti, te, ti/te, ti/ttot, pef, pif, br, vet, sum, tv/te, o2 kinetics, oxygen deficit, oxygen debt parameters and indirect calorimetric. wireless hr recording system, indirect cardiac output by wassermann algorithm system should comply ats and ers guide line and it should be ce certified., iso certified system should have automatic ambient conditions measuring system. system should work under temperature range 0 to 50 celsius. system should have facility for automatic calibration of analyzers. volume transducer calibration with precision calibration syringe. system should meet following technical specification flow rate measurement: measuring headpiece should be either through turbine /dvt/ pneumotach and dead space less then 40 ml, it should not be affected by humidity , flow range +/- 18 l/s and accuracy 2% oxygen analyser : should be either electrochemicalcell/paramagnetic and measurement range 0- 100 %,response time t90 100 ms and accuracy +/-0,04 % and- resolution 0,02 %carbon dioxide analyser : should be ndir (infraredabsorption) and measurement range 0 - 10 %,-response time t90 90 ms , accuracy +/- 0,04 %, andresolution 0,02 % software should support latest windows or latest andin corporate customized predicted normal equations.software should be capable of changing graphics displays during real time testing. system should have facility for automatic treadmill or bicycle ergo meter control. should be supplied with software, standard accessories for operation manual carrying case for field use. system should be supplied with latest data acquisition system, deskjet printer and ups. system should comply en iso 13485:2003, en iso 9001:2000, ec certificate93/42/eec, programmable treadmill running machine with user terminal (display &keyboard) stand- alone and remote control via rs232 running surface: l:170 cm (minimum), w: 65 cm (minimum) maximum possible load: 200 kg (440 lbs) speed range: 0-40 km/h elevation: 25% (14 maximum elevation) motorized adjustment, reverse belt rotation. motor system 3.3 kw, single phase ac motor, maintenance free and brushless power transmission: frequency inverter, poly v- belt, very quiet operation safety system: emergency-off safety stop switch (safety lanyard with actuator, pull cord and clip); potential equalization bolt; transformer for potential-isolation from the mains ambient condition: temperature: +10to +40 degrees c, humidity 30 to 70% display (resolution): lcd display heartrate monitoring: wireless transmitter; the treadmill should be able to interface with well-known compatible metabolic gas analyzer as per standard and custom exercise protocols different programs safety harness-1. indispensable accessory for stress testing, accident prevention and for the general safety of athletes.2. safety arch with different heights and widths to fit all running machines.3. an emergency stop at the crossbar of the safety arch allows automatic stop of the running belt in the moment a fall occurs.4. the harness and chest belt (available in 5 sizes: xxs, s, m, l, xl) secure the subject and prevents falling over to the front.5. chest belt straps do not pinch or restrict the athlete", programmable ergometer functional design and excellent stability, load up to 160kg. easy to use saddle, handle bar and pedals speed independent and dependent power control handle bars are easy to change to suit different tests, rotatable by 360 degrees. mechanical/motor-assisted seat a
Tender For dharapuram municipality supply and delivery of vertical turbine motor 3000lpm x 60m head with pumpset at head works in dharapuram municipality
Tender For installation of one no 90 mtr head complete turbine pump motor set by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Tender For urgent repairing, checking, testing and commissioning of one set 10 cusec capacity vertical turbine pump-motor set no. 01 at s.w. pumping station no. 02 near pumping station no 01 under ndita.
Tender For urgent repairing, checking, testing and commissioning of one set 10 cusec capacity vertical turbine pump-motor set no. 3 at s.w. pumping station no. 01 near nicco park metro station under ndita
Tender For replacing of both the turbine pump of muraidih river side sump with 2000gpm motor set and other miscellaneous job of muraidih patch under amp colliery.
Tender For annual contract for housekeeping and equipments cleaning at pps iii bawana - contract for housekeeping & equipments cleaning at pps-iii bawana for three months, clng entire flr area gt#1&2, dusting wall door window gt#1&2, washing flr gts&around, gt accries coment floor & encloser 1&2, dusting clng structural member gt#1&2, clng ent flr ar gt#1&2 air inl fil house, clng entire flr area sos 1&2 ,jop 1&2, clng entire flr area gcs 1& 2, clng entir road ,drain around gcs 1&2, dusting clng structurl membr gcs 1&2, clng entire flr area of et,pt,gbdpu, dust clng wall door win around pt,gbdpu, generator & gcb flr of unit#1 &2, clng entire flr area of exciaon room1&2, dust clng wall door win of exci room 1&2, cln enti flr area of hydn room 1&2,stg 1, dust cln wall dr wn of hyd rm gt1&2,stg1, clng entire flr area of dmcw & phe room, dust cln wall ,dr wind of dmcw & phe rm, cln enti(gtgt1&2&stgt#1)sat1&2, lt tr ar, clng entire flr area of package ac room, clng entire ground area dsb, dusting wall door window dsb, clng entire ground flr area hrsg i&ii, clng drains & roads around hrsg i&i, washing roads around hrsg i&ii, cln enti flr from gf to 3rd flr bfp bldg, clng drain & road around bfp bldg, cln ent flr ar stg hall bldg, mot&gd flr, dusting clng structural member stg hall, clng entire flr area of control room, dust cln cab wall dr wind of conl room, clng entire flr area of battery room, clng enti flr ar of cable gallery room, clng entire flr area mcc room, dusting clng structural member mcc room, clng entire flr area of nn100 room, clng entire flr area chiller room, clng entire flr area of lp co2 tank, cln toilet near by gas turbine, clng entire flr area comp house, dust clng door window., clng entire flr area of fire pump house, dust clng door window., clng entire areas of cwpp house, clng entire flr area rwr pp house, clng entire flr area gcs, clng entire flr area cooling tower &stai, gf flr i/c staircase upto ff flr, dusting clngs door window ceiling gf, 1st flr flr i/c staircase upto 2nd flr, dusting clng door window ceiling 1st flr, parking place and internal road, clean toilet, clng entire flr area gf, dusting clngs door window ceiling gf, clean toilet, clng gas turbine compartment, clng vent fan & its motor gt#1&2, cln gt accs compartment equipments 1&2, clng eqipts &pipe in so s1&2 ,jop 1&2, cln eqts &pipe gcs1&2(near gas turbine), clean bus duct & its support of gt#1&2, clng generator & gcb of unit#1 &2, clean dg set & fuel tank, cln auxs( pump, motors, pip, v/v etc), cln steam tur1& its associated aux ., clng stg 1 generator, exci encl,bus d, cln stg stm,oil,wt, pips on stgfr,motfr, cln ecw,acw,sos,vacm pp,cep mots ,v/v, clean compressor , pipe, v/v,dryers,tank, clean fire pump, motor, pipe,v/v, clean cw& acw pump, motor, pipe,v/v, clean raw water pump, motor, pipe,v/v, clean gcs (near gail terminal) eqts,v/v, clng lci enclosure from outside, clng entire flr area gt#3&4, dusting wall door window gt#3&4, gt acces compar floor&enclos3&4, washing flr gts&around, dusting clng structural member gt#3&4, cln enti flr area gt#3&4air filter house, clng entire flr area sos 3&4 ,jop 3&4, clng entire flr area gcs 3&4, clng entir road ,drain around gcs 3&4, dusting clng structurl membr gcs 3&4, clng entire flr area of et,pt,gbdpu, dust clng wal dr windo aroud et,pt,gbdpu, generator & gcb flr of unit#3&4, cln entir flr area of exciation room3&4, dust cln wal dor windo of exciat rm 3&4, cln entr flr area of h2 rm 3&4,stg 2, dust cln wal dor of hyd rm gt 3&4,stg 2, cln entr flr area of dmcw & phe room#2, dust cln wall ,dor of dmcw & phe room#2, cln entr road(gtgt3&4, stgt lt trns area, clng entire ground flr area hrsg iii&iv, cln drains & roads around hrsg iii&iv, w