Web Analytics Made Easy - StatCounter

Moving Coil Tenders

Get complete information related to latest Moving Coil Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Moving Coil Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Moving Coil Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :42435142 Due date: 12 Nov, 202512 Nov, 2025 NA
Tender For flush type moving coil ammeter with current range 0-1000amps dc having a basic movement of 75mv/5ma to read tr. motor current with 30% ripple type sq-96, full scale deflection 240 deg. suitable for vertical mounting at 45 deg. a mbeint and taut band suspension to facilitate quick damping conforming to is: 1248-83 part-ii rev.2 or latest complete with illuminated dial and vibration proof thick rubber gasket and clamps. the illumination of dial shall be done with leds to work with normal supply voltage of 110v dc with variation from 90v to 130v. (metre shall be supplied without external shunt).

Central Government/Public Sector

CTN :42435937 Due date: 04 Nov, 202504 Nov, 2025 NA
Tender For supply of analog moving coil voltmeter range 0-1000v ac, nw 72

CTN :42439089 Due date: 04 Nov, 202504 Nov, 2025 NA
Tender For supply of hp fuel pump,injector assy,manifold hose,air filter strome,fuel filter,air filter scorpio,oil filter,ignition coil,cd point,loom wiring

CTN :42439165 Due date: 06 Nov, 202506 Nov, 2025 7.50 Lacs
Tender For supply of 103455693 lv7 stln blackout change over,10449063 lv7 maruti cable assy clutch,10439665 lv7 maruti coil assy ignition,10025660 lv7 stln vf light fog,10449055 lv7 maruti pad,10442917 lv7 maruti switch assy change over

CTN :42441014 Due date: 04 Nov, 202504 Nov, 2025 1.50 Lacs
Tender For supply of joint assy universal,coil assy ignition,caliper assy disc brake,motor fuel pump,sensor throttle position

CTN :42441131 Due date: 04 Nov, 202504 Nov, 2025 NA
Tender For supply of brake shoe assy,damper rear wheel,ac pipe,joint assy universal,gasket oil pump,magnet coil,coil ignition,hose hw1sn 6x4300,cam chain kit,pulling electromagnet 13640,sealing kit,suction hose assy

CTN :42442433 Due date: 04 Nov, 202504 Nov, 2025 86.8 Thousand
Tender For supply of harness assy wring eng,coil assy ignition,wheel bearing rear,cable assy control,holder assy rectifier,suspention bush kit,cleanner assy air,switch assy,fog light,bearing assy front,stopper cable,clutch booster assy

CTN :42442659 Due date: 05 Nov, 202505 Nov, 2025 NA
Tender For supply of clutch assy,pressure plate set,pressure release bearing set,clutch master cylinder assy,clutch repair master kit,vaccum cylinder hose head assy,clutch pedal bearing set,clutch top rod assy,synchronizer cone,sychronizer ring,shift slivering,shifter assy,reverse gear bearing,extra gear bearing,connection shifter rail,main shaft oil seal,gear box packing kit,gear box fit assy,gear sleeves assy,the above mentioned gear box remove the gear box assy send to the lathwork rectify the fault replaced the all damaged parts and re-assembled the gear box.,the above mentioned clutch and gear box check to re-fit the veh test the veh on rd trail run test done,ignition switch,starting coil relay with base assy,fuel solenoid switch,30a fuse base assy set,5mm wire,main realy,holding realy,fly wheel sensor,the above break down veh mentioned unserviceable part remove and replace with new parts rectified the fault check and trail run on rd test done,break master cylinder repair wk,lock washer set,vaccum cylinder hose pipe head ass

Central Government/Public Sector

CTN :42032393 Due date: 31 Oct, 202531 Oct, 2025 NA
Tender For corrigendum : supply of moving coil dc ammeter

CTN :42298552 Due date: 01 Nov, 202501 Nov, 2025 NA
Tender For corrigendum : supply of repair of vehical d d - ramp assembly removing the vehicles and taken to the machine shop stripping all parts cleaning the burning oil seats springs o rings change and ramp assembled and tested , exhaust brake full device and over hauling and testing , transfer case mounting bracket , transfer case mounting bolt male and female , rotating switch , hand brake assembly , the above mentioned old parts removing and servicing new parts fitting mechanical charges and full electrical system checking and service , 4x4 assembly removing and checking electrifying fault defective and mechanical defective rectified and 4x4 assembly system operated and testing , clutch booster , above parts removing and fitting electrical system full checking and burned damaged looms and lighting service and testing electrical and mechanical labour charges , brake shoe lining with rivet , brake cylinder wheel cylinder front and rear , brake m cylinder , clutch cylinder , sleeve cylinder , brake drum skimming , brake system full removing the vehicle brake drum skimming after fitting the drum, brake shoe lining fitting and above brake m cylinder , self starter assembly stripping checking armature field coil solenoid bendex brush brush holder damaged armature re-winding , self assembly removing the vehicle stripping checking all parts armature field coil solenoid burned armature re- winding field coil , clutch plate , pressure plate , release bearing , clutch master cylinder , bty cult of switch 24v , ignition switch , fly wheel skimming and service , cabin shock absorber , 4x4 assembly , the vehicle electrical system full checking and burned damaged looms change ignition switch battery cut off switch fitting and full light system service and testing charges , gear box assembly removing the vehicle old clutch plate pressure plate release bearing fly wheel removing and gear box service , exhaust brake system removing and electrical fault rectified and mechanical fault removing and brake system mounting the vehicle and brake tested , ramp assembly repair service with damaged and burned oil seal springs o rings change and ramp assembled and tested , van pump assembly not working repair service with new packing kit and pressure testing , door lock assembly , relay 12v and 24v , door mechanism , the above mentioned all parts removing and new parts fitting and vehicle testing mechanical charges , all electrical system repair service burned looms and relay change full lighting system head lights tail lights indicators cabinets lights checking and service labour charge , rotary switch , ramp assembly repairs and service with damage seal kit spring and o rings , the above mentioned parts removing and new parts fitting
 Loading, Please wait...

Connect us via What's Up