Get complete information related to latest Mserw Pipe Laying Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Mserw Pipe Laying Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Mserw Pipe Laying Tenders.
Tender For corrigendum : work contract for availing supervision services for inspection of spring hammers and support of power cycle piping systems in tg area at 2x660 mw, sstpp, mppgcl, dongalia.
Tender For procurement of non shrink grouting cement conbxtra gp2 or equivalent in connection with piping work of piping for 5th stream alumina refinery at damanjodi odisha and related facilities at vishakhapatnam port
Tender For providing of facility management services - lumpsum based - industrial; o&m of mechanical work, piping and structural welding work; consumables to be provided by buyer
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl
Tender For corrigendum : supply, installation, testing and commissioning including trial run of six 6 nos. dry installed non clog centrifugal submersible flood proof pump of capacity 20 cusec 2040 m3/hr with allied electro-mechanical work, piping, valves, illumination
Tender For corrigendum : work of removal & application of thermal insulation of turbine and steam piping for unit no 4, 5, 6 & 7 at wtps on as and when required basis
Tender For corrigendum : work of application of thermal insulation & aluminum cladding of various ducts, piping, valves and water wall for boiler unit 3 & 4 on as & when required basis.
Tender For corrigendum : supply of sealsystem - seal system for plan 53b , interconnecting piping and cables , nitrogen charging kit , barrier fluid charging trolly , spreader lifting beam , mandatory spare , site work , supervision charges , overtime working days , overtime weely off days , training charge