Get complete information related to latest Nylon Newar Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Nylon Newar Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Nylon Newar Tenders.
Tender For corrigendum : repair to steel furniture including painting and conversion of gi charpoy with nylonnewar to hard bed at kalimpong and sherwani mil stn under ge 867 ews
Tender For various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged guide rollers as
Tender For corrigendum : supply of goods, tools & equipmentforan international standard itotin mechanic motor vehicle (mmv) tradeat iti tarsali, gujarat, india (package 3: mmv trade) - alternator assembly used for lmv working condition demonstration kit , starter motor assembly used for lmv working condition demonstration kit , electronic engine control module , fuel pump for mpfi working condition demonstration kit , inline fuel injection pump and rotor type fuel injection pump , demonstration board of 2wheeler ignition system. , demonstration board of electronic ignition system. , working condition of petrol mpfi engine assembly with fault simulation board , mpfi petrol engine with swiveling stand along with special tools for dismantling and assembling , demonstration board of mpfi system , ultrasonic injection cleaning equipment , working model of power windows , petrol engine motorcycle/scooter along with special tools and accessories , four stroke multi cylinder diesel engine in working condition , four stroke four cylinder crdi diesel engine in working condition , functional/experiment model of different type of sensors. , auto electrical test bench , cut section model of mock layout of a motor car -electrical system - working model , cut section working model of single plate clutch assembly. , cut section working model of diaphragm clutch assembly. , cut section working model of centrifugal clutch assembly. , front axle ( rezeppa joint) with stand for dismantling and assembly , rear axle with stand for dismantling and assembly , cut section model of synchronous gear box working , cut section model of sliding mesh gearbox working , cut section model of constant mesh gearbox working , full floating axle and semi- floating axle assembly , cut section working model of automatic transmission gear box , steering assembly - , 1. rack& pinion, , 2. worm& roller , 3. recirculating ball , 4. power steering , wheel alignment set up instrument-computerized , brake testing equipment (to test efficiency of vehicle where motion after braking is plotted) , motor vehicle in running condition (diesel heavy) with hydraulic power steering , light motor vehicle diesel crdi with electronic power steering and car a/c , engine dynamometer , four stroke multi cylinder engine mpfi petrol with cng kit set up in running condition , four cylinder four stroke diesel engine test rig with rope brake dynamometer , exhaust gas analyzer - diesel , training setup for adas systems , 4-wheel alignment set & hoist with advanced driver assistance systems (adas) complete frame targets , steel toolbox with lock and key (folding type) , punch letter , outside micrometer (0 25) , outside micrometer (25 50) , outside micrometer (50-75) , outside micrometer (75-100) , inside micrometer (25-50) , depth micrometer (0-25) , thread micrometer , adjustable micrometer sprit level to measure flatness, indication and taper with prismatic measuring base , vernier caliper , digital vernier caliper , vernier depth gauge , vernier bevel protractor, least count 5minutes , telescope gauge , dial test indicator plunger type (complete with clamping devices and stand) , universal surface gauge , cylinder bore gauge , compression testing gauge suitable for petrol engine. , vacuum gauge , granite surface plate , work bench , spanners socket with speed handle, t-bar, ratchet and universal , magneto spanner set , cylinder ridge cutter , vice grip pliers , torque wrenches , pneumatic tools set , car jet washer , pipe flaring tool , pipe cutting tool , universal puller for removing pulleys, bearings , stud extractor set of 3 , stud remover with socket handle , paraffin pressure gun , hand reamers adjustable , straight edge gauge , straight edge gauge , ladle , electric soldering iron , wire gauge (metric) , digital multi meter, 3 % digit (min), diode test mode and continuity mode, , growler , hydrometer , battery analyzer with printer , carburetor - solex, mikuni for dismantling a
Tender For supply of other section , m and l for two coats of synthetic enamel paint over a coat of red oxide primer on new steel surfaces width or girth exc 10 cm including preparation of surfaces all as specified and as directed. , m and l for three coats of white washing on new plaster and unplaster of wall surfaces including preparation of wall surfaces complete all as specified and as directed. , s and f steel stainer for sewage sumps of different pores as specified and directed by engineer in charge , suppy of stand by non clogging pump of 5hp 1520 lpm with all accessories and fittings as specified and directed by engr in charge , heavy duty double tank type chemical dosing system consist of service tank 150 ltrs capacity with dosing system plunger type , s and f gi strip 25x4mm as earthing lead bolts nuts checknuts and washers all as specified and directed , material and labour for earthing complete with galvanized steel plate electrodes of size 600mm x 600mm x 6mm thick , pumping out sewage water from the existing sumps of sewage plant pump house with the help of non clogging of pump any kind capacity of pump set not less than 2160 lpm , lifting the non clogging pump set electrically operated by 15hp 20 hp 3 phase motor incl column pipe line shaft etc , dismantling of non clogging submersible pump of capacity 15hp 20 hp for comprerhensive maintenance and if required taking out burnout old winding from the stator , lowering complete the non clogging pumping set and reflixing the motor carefully including connection and testing , pumping out sewage water from the existing sumps tanks of stps mbbr technology with the help of non clogging , cleaning of 1.2 mld sewage treatment plant after pumping out sewage water from the existing sumps , lifting the non clogging submersible pump set electrically operated by 3.7 hp 3 phase motor incl column pipe line , dismantling of non clogging submersible pump of capacity 3.7 hp and taking out burnout winding from the stator of motor and rewinding with pvc copper wire , dismantling of electric sewage induction motor 3.0 hp ac 3 phase 415 volts from site after disconnecting from pump , dismantling non clogging pump set of centrifugal type 3.0 hp induction motor ac 3 phase 415 volts , dismantling of electric induction blower motor 5.0 hp ac 3 phase 415 volts for comprehensive maintenance from site after disconnecting , dismantling of electric induction blower motor 30.0 hp ac 3 phase 415 volts for comprehensive maintenace from site after disconnecting from blower electric connection , material and labour for pcc 1 3 6 type c2 using 40mm graded stone aggregate for foundation etc , m and l for taking out comprehensive maintenance of existing unserviceable air blower of any make of capacity 125 cubic hr to 188 cubic hr with taking out of electric cable , supply only gear oil ep 90 complete all as specified and as directed by engineer in charge. , supply only air filter suitable for existing one complete all as specified and as directed by engineer in charge. , supply only belt as per existing model complete all as specified and as directed by engineer in charge. , supply only bearing as per existing complete all as specified and as directed by engineer in charge. , supply only set of rotor with hub as per existing model complete all as specified and as directed by engineer in charge. , m and l for finding out defect of stps panel and taking out burnt interconnection wiring including u.s and serviceable component for re use including rewiring of panel , supply and fix in repairs flexible flat pvc copper couductor stranded submersible cable cores 1100 volt grade 4 sqmm 3 bid details/ 2 / 41 core , supply and fix in repairs flexible flat pvc insulated pvc couductor stranded submersible cable cores 1100 volt grade 10 sqmm 3 core , s and f round strand steel wire rope dia 12 mm and connected clamp nut bolts fixed complete all as specified and as directed by engineer in charge. , s and f submersible pump ful