Get complete information related to latest Off Loading Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Off Loading Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Off Loading Tenders.
Tender For providing of goods transportation service - monthly based service - outside state; railways trd material and staff; 4mt loading capacity,goods transportation service - monthly based service - outside state; railways trd material and staff; 4mt loading capacity
Tender For providing of handling ,transport and other mining services - percentage quote based - handling & transport service, loading and transportation of coal at nigahi project
Tender For offloading work to outside agency towards providing day to day backup support manpower for store related works in different sections of excavation department at dudhichua project
Tender For corrigendum : providing of handling ,transport and other mining services - percentage quote based - handling & transport service, ob removal, coal extraction, composite work ob removal, loading and transportation of coal , extraction of coal by surface miner at porda chimtapan..
Tender For providing of handling ,transport and other mining services - percentage quote based - coal extraction, handling service, transport service, loading & transportation by cpl and tippers for 6.00 l. te. coal karo ocp to dhori / amlo railway siding of b&k area for a ..
Tender For ttps ?? mech.ii - tm ii - overhauling of various size of valves in instrument and service air compressors & air drier plant system of unit iv & v during annual overhaul 2025-26note: prospective bidders may get the specification free of cost by down loading from tangedco website
Tender For providing of handling ,transport and other mining services - percentage quote based - handling service, transport service, handling & transport service, loading of 84,000 te of coal into tippers by mechanised means at coal stock and transportation and unloading o..
Tender For mgsy/25-26/araria/01 - panchayat pipra vijayavar nuna nadi me high level rcc pul ka nirman karya, h.l. bridge work, foundation, excavation for structures, earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material., i) upto 3m depth, providing and constructing temporary earth island (assuming depth of water 1.0 m and height of island to be 1.25 m including royality for earth, providing and constructing one span service road to reach island location from one pier location to another pier location including royality for earth, providing and laying cutting edge of mild steel weighing 40kg per metre for well foundation complete as per drawing and technical specification., plain / reinforced cement concrete in well foundation complete as per drawing and technical specification, well curb(iv) rcc m-35 gradecase-i : with batching plant, transit mixer and concrete pump, well steining(vii) rcc m-30 gradecase-i : with batching plant and concrete pump, bottom plug(i) pcc grade m-20case-i : with batching plant and concrete pump, top plug(ii) pcc grade m-20case-i : with batching plant and concrete pump, well cap(ii) rcc grade m-30case-i : with batching plant, transit mixer and concrete pump, sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. depth of sinking is reckoned from bed level., sandy soil, depth below bed level upto 3.0 m., beyond 3 m upto 10 m depth, beyond 10 m upto 20 m, add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter, beyond 20 m upto 30 m, add 20% of cost for kentledge including supports, loading arrangement and labour., sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. depth of sinking is reckoned from bed level., sandy soil, depth below bed level upto 3.0 m., beyond 3 m upto 10 m depth, beyond 10 m upto 20 m, add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter, beyond 20 m upto 30 m, add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter, sand filling in wells complete as per drawing and technical specifications, supplying, fitting and placing hysd bar reinforcement in foundation complete as per drawings and technical specifications clauses 1000 and 1202, substructure, r.c.c. grade m-30 in substructure complete as per dwg & tech specification, i) upto 5m height (using batching plant, transit mixer and concrete pump), ii) from 5m upto 10m height (using batching plant, transit mixer and concrete pump), r.c.c. grade m-35 in substructure complete as per dwg & tech specification, i) from 5m upto 10m height (using batching plant, transit mixer and concrete pump), supplying, fitting and placing hysd bar reinforcement (fe 415) in substructrue complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202, supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to irc: 83 (part-ii) section ix and clause 2005 of morth specifications complete including all accessories as per drawing and technical specifications., providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia ac pipe extending through the full width of the structures with slope of 1(v):20(h) towards drawing face complete as per drawing and technical specification clauses 614, 709
Tender For mgsy/25-26/araria/02 - construction of rcc h.l. bridge in pagal chauk se kesa tola chainage 2.200 km par pul nirman karya, h.l. bridge work, foundation, excavation for structures, earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material., i. ordinary soil, i) upto 3m depth, providing and constructing temporary earth island (assuming depth of water 1.0 m and height of island to be 1.25 m including royality for earth, providing and constructing one span service road to reach island location from one pier location to another pier location including royality for earth, providing and laying cutting edge of mild steel weighing 40kg per metre for well foundation complete as per drawing and technical specification., plain / reinforced cement concrete in well foundation complete as per drawing and technical specification, well curb(iv) rcc m-35 gradecase-i : with batching plant, transit mixer and concrete pump, well steining(vii) rcc m-30 gradecase-i : with batching plant and concrete pump, bottom plug(i) pcc grade m-20case-i : with batching plant and concrete pump, top plug(ii) pcc grade m-20case-i : with batching plant and concrete pump, well cap(ii) rcc grade m-30case-i : with batching plant, transit mixer and concrete pump, sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. depth of sinking is reckoned from bed level., sandy soil, depth below bed level upto 3.0 m., beyond 3 m upto 10 m depth, beyond 10 m upto 20 m, add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter, beyond 20 m upto 30 m, add 20% of cost for kentledge including supports, loading arrangement and labour., sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. depth of sinking is reckoned from bed level., sandy soil, depth below bed level upto 3.0 m., beyond 3 m upto 10 m depth, beyond 10 m upto 20 m, add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter, beyond 20 m upto 30 m, add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter, sand filling in wells complete as per drawing and technical specifications, supplying, fitting and placing hysd bar reinforcement in foundation complete as per drawings and technical specifications clauses 1000 and 1202, substructure, r.c.c. grade m-30 in substructure complete as per dwg & tech specification, rcc m-30, i) upto 5m height (using batching plant, transit mixer and concrete pump), ii) from 5m upto 10m height (using batching plant, transit mixer and concrete pump), r.c.c. grade m-35 in substructure complete as per dwg & tech specification, rcc m-35 (using batching plant, transit mixer and concrete pump), i) from 5m upto 10m height (using batching plant, transit mixer and concrete pump), supplying, fitting and placing hysd bar reinforcement (fe 415) in substructrue complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202, supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to irc: 83 (part-ii) section ix and clause 2005 of morth specifications complete including all accessories as per drawing and technical specifications., providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia ac pipe extending through the full width of the struct