Web Analytics Made Easy - StatCounter

Oil Drum Tenders

Get complete information related to latest Oil Drum Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Oil Drum Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Oil Drum Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41037261 Due date: 16 Jul, 202516 Jul, 2025 2.61 Lacs
Tender For transportation of 20/25 mva, 132/33kv power transformer with oil drums &amp all accessories including rtcc panel loading from 132 kv gss sumerpur (distt.- pali) to unloading at 132 kv gss anandpur kaloo (distt. beawar) on transformer foundation

Central Government/Public Sector

CTN :40810746 Due date: 14 Jul, 202514 Jul, 2025 NA
Tender For supply, installation and commissioning of twin bin hdpe dustbin at various locations of salem divisi on of southern railway. one unit of dustbin set should contain 2 nos of 80 litre hdpe dustbin with one center pole and two supporting pole on both side with t shape base as shown in picture in mild steel with powder coated. colo ur of bin : green for bio-degradable & blue for non-bio-degradable; usage : railway platform/out-door area; shape: rectangular; each bin/drum capacity : 80 ltr. each dustbin; lid : dome shape; tilting type for easy removal of gar bage with logo of swachh bharat abhiyan with symbol and separate trilingual stickers non bio-degradable and bio degradable. sample requirements : 2 unit of sample to be installed at salem station for approval of consignee befor e effecting full/bulk supply. as per specifications in annexure. [ warranty period: 60 months after the date of deli very ]

corporations/Associations/Others

CTN :41019754 Due date: 23 Jul, 202523 Jul, 2025 3.00 Lacs
Tender For execution of contract for supply works and other works in panagudi section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site

corporations/Associations/Others

CTN :41019757 Due date: 23 Jul, 202523 Jul, 2025 2.00 Lacs
Tender For execution of contract for supply works and other works in ittamozhy section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to sit

Central Government/Public Sector

CTN :40995501 Due date: 19 Jul, 202519 Jul, 2025 9.74 Lacs
Tender For making of oil drum shed with cement concrete pavement of dumper section of nmug to oc mine under new majri sub area of majri area.

CTN :40991765 Due date: 15 Jul, 202515 Jul, 2025 1.65 Lacs
Tender For transportation of 20/25 mva, 132/33 kv power transformer with oil drums &ampamp all accessories including rtcc panel loading from 132 kv gss bapini, jodhpur to unloading at 132 kv gss hatundi on transformer foundation (distt.- jodhpur).

CTN :40891998 Due date: 11 Jul, 202511 Jul, 2025 1.25 Lacs
Tender For corrigendum : transportation of 132/33 kv , 20/25 mva old power transformer main tank with all accessories& oil drums from 132 kv gss i.a. kota (kota dist.) to 132 kv gss mayla (kota dist.)

corporations/Associations/Others

CTN :41008443 Due date: 14 Jul, 202514 Jul, 2025 NA
Tender For auction sale of tf tank scrap,empty oil drum

corporations/Associations/Others

CTN :41008444 Due date: 14 Jul, 202514 Jul, 2025 NA
Tender For auction sale of empty oil drum

corporations/Associations/Others

CTN :41008445 Due date: 14 Jul, 202514 Jul, 2025 NA
Tender For auction sale of empty oil drum,gc sheet scrap,al.cable un-arm.,al cable armoured,control cable scrap,al. cable pvc,xlpe cable scrap
 Loading, Please wait...

Connect us via What's Up